Journals / Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi / 2008 / Cilt: 23 - Sayı: 1

A fuzzy approach to assembly line balancing problem

Montaj hattı dengeleme problemine bulanık bir yaklaşım

Pages
129–138
Publication Date
2022-10-18
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The developed solution algorithm is coded by Java programming language and is tested in a factory to balance a new assembly line.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this study, an algorithm is developed to solve traditional assembly line balancing problem with fuzzy operation times.
📊
Key Findings & Data:Variability and uncertainty in the assembly line balancing problem is traditionally modelled through the use of statistical distributions.
💡
Conclusion & Impact:The developed solution algorithm is coded by Java programming language and is tested in a factory to balance a new assembly line.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

In this study, an algorithm is developed to solve traditional assembly line balancing problem with fuzzy operation times. Variability and uncertainty in the assembly line balancing problem is traditionally modelled through the use of statistical distributions. This may not be feasible in cases where no historical data exists. For this reason, the proposed algorithm uses fuzzy operation times determined by an expert to balance the new assembly line. The developed solution algorithm is coded by Java programming language and is tested in a factory to balance a new assembly line.

Özet

Bu çalışmada, bulanık operasyon zamanlı geleneksel montaj hattı dengeleme probleminin çözümü için bir algoritma geliştirilmiştir. Montaj hattı dengeleme problemindeki değişkenlik ve belirsizlik geleneksel olarak istatistiksel dağılımlar kullanılarak modellenir. Fakat bu durum, geçmiş verilerin olmadığı hallerde uygun olmayabilir. Bu nedenle, önerilen algoritma yeni bir montaj hattını dengelemek için bir uzman tarafından belirlenen bulanık operasyon sürelerini kullanmaktadır. Geliştirilen çözüm algoritması Java programlama dili ile kodlanmış ve bir fabrikada test edilerek yeni hattın dengelenmesi sağlanmıştır.

🔖

Cite This Article

KALENDER, F. Y., YILMAZ, M. M., TÜRKBEY, O. (2022). A fuzzy approach to assembly line balancing problem. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, Cilt: 23 - Sayı: 1, 129–138. https://ajindex.com/articles/523912

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (17)

  1. Thangavelu, S. R. ve Shetty, C. M., “Assembly Line Balancing by Zero-One Integer Programming”, AIIE Transactions, Cilt 3, No 1, 61-68, 1971
  2. Patterson, J. H. ve Albracht, J. J., “Assembly Line Balancing: Zero-One Programming with Fibonacci Search”, Operations Research, Cilt 23, No 1, 166-172, 1975
  3. Talbot, F. B. ve Patterson, J. H., “An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem”, Management Science, Cilt 30, No 1, 85-99, 1984
  4. Jackson, J. R., “A Computing Procedure for a Line Balancing Problem”, Management Science, Cilt 2, No 3, 261-271, 1956
  5. Van Assche, F. ve Herroelen, W. S., “An Optimal Procedure for the Single Model Deterministic Assembly Line Balancing Problem”, European Journal of Operational Research, Cilt 3, No 2, 142- 149, 1979
  6. Wee, T. S. ve Magazine, M. J., “An Efficient Branch and Bound Algorithm for an Assembly Line Balancing Problem - Part II: Minimize The Number of Work Stations”, University of Waterloo, Cilt 6, 151, 1981
  7. Johnson, R. V., “Optimally Balancing Large Assembly Lines with ‘Fable’”, Management Science, Cilt 34, No 1, 240-253, 1988
  8. Hoffmann, T. R., “EUREKA: A Hybrid System for Assembly Line Balancing”, Management Science, Cilt 38, 39-47, 1992
  9. Scholl, A. ve Klein, R., “SALOME: A Bidirectional Branch and Bound Procedure for Assembly Line Balancing”, Journal on Computing, Cilt 9, 319-334, 1997
  10. Klein, M., “On Assembly Line Balancing”, Operations Research, Cilt 11, No 2, 55-62 1963
  11. Gökçen, H. ve Erel, E., “Shortest-Route Formulation of Mixed Model Assembly Line Balancing Problem”, European Journal of Operations Research, Cilt 116, 194-204, 1999
  12. Held, M., Karp, R.M. ve Sharesian, R., “Assembly Line Balancing Dynamic Programming with Predence Constraints”, Operation Research, Cilt 11, No 3, 442-459, 1963
  13. Schrage, L. ve Baker, K. R., “Dynamic Programming Solution of Sequencing Problems with Precedence Constraints”, Operations Research, Cilt 26, 444-459, 1978
  14. Tonge, F. M., A Heuristic Program for Assembly Line Balancing, Prentice Hall Inc., New York, 15-24, 1961
  15. Kilbridge, M. D. ve Wester, L., “A Heuristic Method of Assembly Line Balancing”, Journal of Industrial Engineering, Cilt 12, No 4, 292-298, 1961
  16. Helgeson, W. B. ve Birnie, D. P., “Assembly Line Balancing Using Ranked Positional Weight Technique”, Journal of Industrial Engineering, Cilt 12, No 6, 394-398, 1961
  17. Moodie, C. L. ve Young H. H., “A Heuristic Method o