Journals / International Advanced Researches and Engineering Journal / 2018 / Cilt: 2 - Sayı: 2

Prioritization of high-speed rail projects

Pages
98–103
Publication Date
2022-10-19
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

As a result of prioritization made through criteria determined by literature review and expert opinion, evaluations are made.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In recent years, intercity transportation has gained momentum towards high-speed rail in Turkey.
📊
Key Findings & Data:Ankara-Konya, Ankara-Eskişehir and Istanbul lines were opened for high-speed transportation in this area.
💡
Conclusion & Impact:As a result of prioritization made through criteria determined by literature review and expert opinion, evaluations are made.
🔬Design:Review & Systematic Survey
📍Scope:Comprehensive Sample
⚙️Variables:AHP · High speed rail · Prioritization

Abstract

In recent years, intercity transportation has gained momentum towards high-speed rail in Turkey. Ankara-Konya, Ankara-Eskişehir and Istanbul lines were opened for high-speed transportation in this area. There are still high-speed train lines under construction. At the same time, there are also various high-speed rail projects that will be started soon and are in the designing process. However, these projects require a big budget. Because of this, it is not possible to carry out all the projects and some projects are carried out gradually. In this study, prioritization of the high-speed rail projects was done by using the analytical hierarchy process (AHP). As a result of prioritization made through criteria determined by literature review and expert opinion, evaluations are made.

🔖

Cite This Article

HAMURCU, M., EREN, T. (2022). Prioritization of high-speed rail projects. International Advanced Researches and Engineering Journal, Cilt: 2 - Sayı: 2, 98–103. https://ajindex.com/articles/539389

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (14)

  1. Uçev E.S.E and Mahdum, N., Dünyada ve Türkiye’de yüksek hızlı tren işletmeciliği, 2015. T.C. Başbakanlık Hazine Müşteşarlığı Çalışma Raporları, 2015-6
  2. Akgungor, A. P., and Demirel, A., Evaluation of Ankara‐Istanbul high speed train project. Transport, 2007. 22(1), 1-3
  3. Öztürk Z., Yüksek Hızlı Demiryollarının Gelişimi ve Türkiye'nin Durumu, 1999. II. Ulaşım ve Trafik Kongresi – Sergisi
  4. Ahern, A. and Anandarajah, G., Railway projects prioritisation for investment: Application of goal programming, 2007. Transport Policy, 14(1), 70-80
  5. Tsamboulas, D. A., A tool for prioritizing multinational transport infrastructure investments, 2007. Transport Policy, 14(1), 11-26
  6. Longo, G., Padoano, E., Rosato, P. and Strami, S., Considerations on the application of AHP/ANP methodologies to decisions concerning a railway infrastructure, 2009. Proceedings of the 10th International Symposium on the Analityc Hierarchy Process, Pittsburgh, Pennsylvania
  7. Wey, W. M., and Wu, K. Y. Using ANP priorities with goal programming in resource allocation in transportation, 2007. Mathematical and computer modelling, 46(7), 985-1000
  8. Macura, D., Bošković, B., Bojović, N. and Milenković, M., A model for prioritization of rail infrastructure projects using ANP, 2011. International Journal of Transport Economics/Rivista internazionale di economia dei trasporti, 285-309
  9. Saat, M. R. and Aguilar Serrano, J., Multi-criteria high-speed rail route selection: application to Malaysia's high-speed rail corridor prioritization, 2015. Transportation Planning and Technology, 38(2), 200-213
  10. Sperry, B., Mueller, J. and Hunter-Zaworski, K., Development of multi-criteria decision method for evaluating high-speed rail corridor, 2013. Transportation Research Record: Journal of the Transportation Research Board, (2374), 26-34
  11. Hamurcu, M. and Eren T., Raylı Sistem Projeleri Kararında Ahs-Hp Ve Aas-Hp Kombinasyonu, Gazi Mühendislik Bilimleri Dergisi, 2017.3 (3), 1-13
  12. Hamurcu, M., Alağaş, H.M. and Eren, T., Selection of rail system projects with analytic hierarchy process and goal programming. Sigma Journal of Engineering and Natural Sciences, 2017. 8(4), 291-302
  13. Hamurcu, M., Gür, Ş., Özder, E.H and Eren, T., A multi-criteria decision making for monorail projects with analytic network process and 0-1 goal programming, 2016. International Journal of Advances in Electronics and Computer Science (IJAECS), 3(7):8-12
  14. Gür, Ş., Hamurcu, M., and Eren, T., Ankara’da mon