Journals / Afyon Kocatepe Üniversitesi Fen ve Mühendislik Bilimleri Dergisi / 2021 / Cilt: 21 - Sayı: 3

Multi-Mode Resource Constrained Project Scheduling Under Fuzzy Enviroment

Çok Modlu Kaynak Kısıtlı Proje Çizelgeleme Problemlerinin BelirsizlikOrtamında Modellenmesi

Pages
586–605
Publication Date
2022-10-12
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Project scheduling problems defined with constrainedresources and uncertainty issues can be solved by by Project Scheduling Software in order to minimizetotal project makespan and scheduling cost.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this paper, we consider multi-mode resource-constrained project scheduling problems with multipleexecution modes for each activity under uncertainty conditions.
📊
Key Findings & Data:A software package named as “ProjectScheduling Programming” was developed by using Microsoft C# and its performance was tested onsome sample projects and PSPLib data sets.
💡
Conclusion & Impact:Project scheduling problems defined with constrainedresources and uncertainty issues can be solved by by Project Scheduling Software in order to minimizetotal project makespan and scheduling cost.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

In this paper, we consider multi-mode resource-constrained project scheduling problems with multipleexecution modes for each activity under uncertainty conditions. A software package named as “ProjectScheduling Programming” was developed by using Microsoft C# and its performance was tested onsome sample projects and PSPLib data sets. Project scheduling problems defined with constrainedresources and uncertainty issues can be solved by by Project Scheduling Software in order to minimizetotal project makespan and scheduling cost.

Özet

Bu çalışmada, belirsizlik ortamında proje süreçlerinin çizelgelenmesine olanak tanıyan bulanık etkinlik sürelerinden oluşan çok modlu, kaynak kısıtlı proje çizelgeleme problemleri incelenmiştir. Proje çizelgeleme problemlerinin çözümü için Microsoft C# programlama dili kullanılarak “Proje Çizelgeleme Programı” olarak isimlendirilen bir paket program geliştirilmiş, literatürde Proje Çizelgeleme Problemleri Kütüphanesi (PSPLib) olarak bilinen örnek problem setleri üzerinde test edilerek çıktı sonuçları kıyaslanmıştır. Kaynak kısıtlı bulanık çok modlu proje çizelgeleme problemleri, geliştirilen program ile çözülerek toplam proje süreleri ve toplam çizelgeleme maliyetleri en küçüklenmektedir.

🔖

Cite This Article

AYDIN, S., ATLI, Ö. (2022). Multi-Mode Resource Constrained Project Scheduling Under Fuzzy Enviroment. Afyon Kocatepe Üniversitesi Fen ve Mühendislik Bilimleri Dergisi, Cilt: 21 - Sayı: 3, 586–605. https://ajindex.com/articles/429009

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (11)

  1. Atlı, Ö. and Kahraman, C. 2013.
  2. Fuzzy critical path analysis, Sigma Journal of Engineering and Natural Science, 31, 128-140.
  3. Atli, Ö. 2011. Tabu search and an exact algorithm for the solutions of resource-constrained project scheduling problems.International Journal of Computational Intelligence Systems, 2, 255-267. https://doi.org/10.1080/18756891.2011.9727781
  4. Arauj, J.S.S., Santos, H.G., Gendron, B., Dominik J.S., Brito, S.S. and Souza, D.S., 2020. Strong bounds for resource constrained project scheduling: Preprocessing and cutting planes. Computers and Operations Research, 113, 104782. https://doi.org/10.1016/j.cor.2019.104782 Birjandi A. and Mousavi S.M., 2019. Fuzzy resourceconstrained project scheduling with multiple routes: A heuristic solution. Automation in Construction, 100, 84–102. https://doi.org/10.1016/j.autcon.2018.11.029
  5. Bouleimen, K. and Lecocq, H. A new efficient simulated annealing algorithm for the resource constrained project scheduling problem. Tech. rep., Service de Robotique et Automatisation, Universite de Liege, 1998.
  6. Bouleimen, K. and Lecocq, H., 2003. A new efficient simulated annealing algorithm for the resourceconstrained project scheduling problem and its multiple mode version. In European Journal of Operational Research, 49(2), 268-281. https://doi.org/10.1016/S0377-2217(02)00761-0
  7. Bofill, M., Coll,J., Suy, J. and Villaret, M. 2020. SMT encodings for Resource-Constrained Project Scheduling Problems. Computers & Industrial Engineering, 149, 106777. https://doi.org/10.1016/j.cie.2020.106777
  8. Buckley, J. J., 1985. Fuzzy Hierarchical Analysis. Fuzzy Sets and Systems, 17(3), 233-247. Brucker,P., Drexl,A., Möhrıng, R. Neumann,K. and Pesch.E., 1999. Resources-Constrained Project Scheduling: Notation, Classification, Model and Methods. European Journal of Operational Research, 112,. 3-41. https://doi.org/10.1016/S0377-2217(98)00204-5
  9. Chanas, S. and Kamburowski, J., 1981. The use of fuzzy variables in pert. Fuzzy Sets and Systems, 5(1), 11-19. https://doi.org/10.1016/0165-0114(81)90030-0
  10. Chen, S. P. and Hsueh, Y. J., 2008. A simple approach to fuzzy critical path analysis in project networks. Applied Mathematical Modelling, 32(7), 1289-1297. https://doi.org/10.1016/j.apm.2007.04.009
  11. Drexl, A. and Gruenewald, J. 1993. Nonpreemptive multimode resource-constrained project scheduling. IIE transactions, 25(5), 74-81. https://doi.org/10.1080/07408179308964317 Drexl,A., Nıssen R., Patterson J. and Salewskı F. 2000. PROGEN/ πX – An ınstanc