Journals / Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi / 2002 / Cilt: 17 - Sayı: 4

A HEURISTIC FOR SINGLE MODEL U-LINE ASSEMBLY LINE BALANCING WITH STOCHASTIC TASK TIME

Stokastik Görev Zamanlı Tek Modelli U Tipi Montaj Hattı Dengeleme Problemleri İçin Bir Sezgisel

Pages
115–124
Publication Date
2013-03-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The aim of the procedure is to assign tasks to stations such that number of station will be minimized and probability confidence levels set by management will not exceeded for each station time.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this paper, a new heuristic procedure for single model U-line balancing problem with stochastic task time is proposed.
📊
Key Findings & Data:The proposed procedure is based on the COMSOAL method developed by Arcus [16] for traditional deterministic single model assembly lines.
💡
Conclusion & Impact:The aim of the procedure is to assign tasks to stations such that number of station will be minimized and probability confidence levels set by management will not exceeded for each station time.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Hat dengeleme · U tipi hatlar · Line balancing

Abstract

In this paper, a new heuristic procedure for single model U-line balancing problem with stochastic task time is proposed. The proposed procedure is based on the COMSOAL method developed by Arcus [16] for traditional deterministic single model assembly lines. The aim of the procedure is to assign tasks to stations such that number of station will be minimized and probability confidence levels set by management will not exceeded for each station time.

Özet

Bu makalede, görev zamanlarının normal dağılımla ifade edildiği (stokastik) U tipi montaj hattı dengelenme problemi için yeni bir sezgisel prosedür önerilmiştir. Önerilen prosedür geliştirilirken, Arcus [16] tarafından geleneksel, deterministik tek modelli hatlar için sunulan COMSOAL metodundan faydalanılmıştır. Prosedür, herbir istasyon için yönetim tarafından belirlenen güvenlik seviyesi kısıtı altında, görevlerin, istasyon sayısı enküçüklenecek şekilde atanmalarını amaçlamaktadır. Prosedür, Pascal programlama diliyle kodlanmış, değişik test problemleriyle denenmiş ve sonuçlar tartışılmıştır.

🔖

Cite This Article

AĞPAK, K., GÖKÇEN, H., SARAY, N. N., ÖZEL, S. (2013). A HEURISTIC FOR SINGLE MODEL U-LINE ASSEMBLY LINE BALANCING WITH STOCHASTIC TASK TIME. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, Cilt: 17 - Sayı: 4, 115–124. https://ajindex.com/articles/21365

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (15)

  1. Ohno, K.,Nakade, K.,”Analysis and Optimization of U-Shaped Production Line”, Journal of the Operations Research Society of Japan, Vol. 40, No. 1, March 1997.
  2. Hall, R. W., Zero Inventories, IRWIN, Illinois, 1983.
  3. Monden, Y., Toyota Production System, Industrial Engineering and Management Press, Instute of Industrial Engineers,1983.
  4. Miltenburg, G. J., Wijngaard, J.,”The U-Line Balancing Problem”, Management Science, Vol. 40, No. 10, October 1994.
  5. Ohno, K.,Nakade, K., Shantikumar, J. G.,”Bounds and Approximations for Cycle Times of a U-shaped Production Line”, Operations Research Letters, Vol. 21, pp. 191-200, 1997.
  6. Miltenburg, G. J., “Balancing U-lines in a Multiple U-line Facility”, European Journal of Operational Research, Vol. 109, pp. 1-23,1998.
  7. Sparling, D., Miltenburg, J., “The Mixed-Model U-line Balancing Problem”, International Journal of Production Research, Vol. 36, No. 2, pp.485-501, - Scholl, A., Klein, R, “ULINO: Optimally Balancing U-shaped JIT Assembly Lines “, International Journal of Production Research, Vol. 37, No. 4, pp. -736, 1999.
  8. Miltenburg, J., “One-piece Flow Manufacturing on U-shaped Production Lines: A Tutorial”, IIE Transactions, Vol. 33, pp. 303-321.
  9. Erel, E., Sabuncuoğlu, I. and Aksu, B. A., “ Balancing of U-type Assembly Systems Using Simulated Annealing”, International Journal of Production Research, Vol. 39, No. 13, pp. 3003-3015.
  10. Ağpak, K., Gökçen, H., “ U Tipi Montaj Hatlarının Dengelenmesi için Bir Sezgisel Metot: Düzenlenmiş COMSOAL (U-COMSOAL)”, Endüstri Mühendisliği Dergisi, Cilt: 12, Sayı:2, 2001.
  11. Ağpak, K., Gökçen, H., “ Basit U Tipi Montaj Hattı Dengeleme Problemine Bulanık Programlama Yaklaşımı”, Dokuz Eylül Üni. Müh. Fak. Fen ve Mühendislik Dergisi, Basımda. Gökçen, H., Baykoç, Ö. F., “ A New Line Remedial Policy for The Paced Lines with Stochastic Task Times”, International Journal of Production Economics, vol. 58, pp. 191-197, 1999.
  12. Erdal, E. and Sarin, S. C., “A Survey of the assembly line balancing procedures”, Production Planning and Control, 9 (5), 414-434, 1998.
  13. Sarin, S. C., Erel, E., Dar-El, E. M., “ A Methodology for Solving Single- Model, Stochastic Assembly Line Balancing Problem”, International Journal of Management Science-OMEGA, 27, 525-535, 1999.
  14. Arcus, A. L., “COMSOAL: A Computer Method of Sequencing Operations For Assembly Lines”, International Journal of Production Research, Vol. 4, No. 4, pp. 259-277, 1966.
  15. Mansoor, E. M., Ben-Tuvia, S., “ Optimizing Balanced Assembly Lines”, Journal of Insut