Journals / Artvin Çoruh Üniversitesi Orman Fakültesi Dergisi / 2026 / Cilt: 27 Sayı: 4

Process Improvement for Material Addressing and Warehousing in a Furniture Factory

Bir Mobilya Fabrikasında Malzeme Adresleme ve Depolar İçin Süreç İyileştirme

Muhammed Said Fidan(BURSA TEKNİK ÜNİVERSİTESİ, ORMAN FAKÜLTESİ)0000-0001-6562-6299
Pages
1–19
Publication Date
2026-11-05
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

In the metal profile warehouse, 6% improvements were made in the storage area by switching from the car transport system to the conveyor system.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In today's world, excessive inventory in furniture factories leads to waste and unnecessary warehouse costs, while just-in-time material delivery is essential for just-in-time production.
📊
Key Findings & Data:Therefore, in this study, process improvement studies were carried out in a furniture company in the light of process improvement methods. 5S studies were carried out in the primary material warehouse and other warehouses during the planned renovation and development works at the primary material warehouse.
💡
Conclusion & Impact:In the metal profile warehouse, 6% improvements were made in the storage area by switching from the car transport system to the conveyor system.
🔬Design:Araştırma Makalesi
📍Scope:Comprehensive Sample
⚙️Variables:Süreç iyileştirme · Malzeme adresleme · Mobilya

Abstract

In today's world, excessive inventory in furniture factories leads to waste and unnecessary warehouse costs, while just-in-time material delivery is essential for just-in-time production. Therefore, in this study, process improvement studies were carried out in a furniture company in the light of process improvement methods. 5S studies were carried out in the primary material warehouse and other warehouses during the planned renovation and development works at the primary material warehouse. Warehouse processes were analyzed and process improvement studies were carried out in order to reduce the duration of processes such as addressing and Kanban preparation. First material warehouse was completely renewed and the number of addresses from 4600 tripled and reached approximately 14000. In terms of surface area, the warehouse area has been increased from 875 m² to 1650 m². The materials were grouped according to various criteria and their addresses were determined. Thanks to this addressing, a 25% improvement in Kanban preparation time has been achieved. In the metal profile warehouse, 6% improvements were made in the storage area by switching from the car transport system to the conveyor system.

Özet

Günümüz Dünya’sında mobilya fabrikalarında fazla stoklama israf ve gereksiz depo maliyeti iken, tam zamanında üretimin gerçekleşebilmesi için ise tam zamanında malzeme teslimatının gerçekleşmesi gerekmektedir. Bu nedenle; bu çalışmada, süreç iyileştirme yöntemlerinin ışığında, bir mobilya firmasında süreç iyileştirme çalışmaları gerçekleştirilmiştir. İMM (ilk madde ve malzeme) deposunda planlanan yenileme ve geliştirme çalışmalarında İMM depo ve diğer depolarda 5S çalışmaları yapılmıştır. Depo süreçleri analiz edilerek adresleme, kanban hazırlama gibi proseslerin sürelerinin azaltılması amacıyla süreç iyileştirme çalışmaları gerçekleştirilmiştir. İMM depo tamamen yenilenerek 4600 olan adres sayısı 3 katına çıkarak yaklaşık olarak 14000’e ulaşmıştır. Yüz ölçümü olarak depo alanı 875 m²’den, 1650 m²’ye çıkartılmıştır. Malzemeler çeşitli kriterlere göre gruplanarak adresleri belirlenmiştir. Bu adresleme sayesinde kanban hazırlama süresinde %25 oranında iyileştirme sağlanmıştır. Metal profil deposunda arabalı sistemden konveyörlü sisteme geçilerek depolama alanında %6 oranında iyileştirmeler gerçekleştirilmiştir.

🔖

Cite This Article

Çelik, V., Fidan, M. S. (2026). Process Improvement for Material Addressing and Warehousing in a Furniture Factory. Artvin Çoruh Üniversitesi Orman Fakültesi Dergisi, Cilt: 27 Sayı: 4, 1–19. https://doi.org/10.17474/artvinofd.1979317

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (16)

  1. Brynzér, H., & Johansson, M.I. (1996). Storage location assignment: Using the product structure to reduce order picking times. International Journal of Production Economics, 46–47, 595–603. https://doi.org/10.1016/0925-5273(94)00091-3
  2. Bülbül, Ş. (2008). Using the six sigma tools to determine improvement areas in production processes (Master’s Thesis). Dokuz Eylül University, Institute of Social Science, İzmir.
  3. Cao, H., & Folan, P. (2012). Product life cycle: the evolution of a paradigm and literature review from 1950–2009. Production Planning & Control, 23(8), 641–662. https://doi.org/10.1080/09537287.2011.577460
  4. Cimit, M.N. (2004). Process improvement and an application in aluminium flat-rolled product sector (Master’s Thesis). İstanbul Technical University, Institute of Science and Technology, İstanbul.
  5. Çelik, V. (2023). Process analysis and process improvement in a furniture factory (MSc Thesis). Bursa Technical University, Graduate Education Institute, Bursa.
  6. Eroğlu, C. (2006). Process improvement and an application (MSc Thesis). Marmara University, Institute of Social Science, İstanbul.
  7. Gu, J., Goetschalckx, M., & McGinnis, L.F. (2007). Research on warehouse operation: A comprehensive review. European Journal of Operational Research, 177(1), 1–21. https://doi.org/10.1016/j.ejor.2006.02.025
  8. Harrington, H.J. (1991). Business process improvement the breakthrough strategy for total quality, productivity and competitiveness, New York: Mc Graw Hill.
  9. ISO 9001. (2015). Quality management systems -Requirements. https://www.iso.org/standard/62085.html
  10. Kalpic, B., & Bernus, P. (2006). Business process modelling through the knowledge management perspective. Journal of Knowledge Management, 10(3), 40-56. https://doi.org/10.1108/13673270610670849
  11. Kłodawski, M., Jacyna, M., Lewczuk, K., & Wasiak, M. (2017). The issues of selection warehouse process strategies. Procedia Engineering, 187, 451 – 457. https://doi.org/10.1016/j.proeng.2017.04.399
  12. Koster, R., Le-Duc, T., & Roodbergen, K. J. (2007). “Design and control of warehouse order picking: A literature review”. European Journal of Operational Research, 182(2), 481–501. https://doi.org/10.1016/j.ejor.2006.07.009
  13. Levitt, T. (1965). Exploiting the product life cycle. Harvard Business Review, 43(6), 81–94.
  14. Mohamud, I.H., Kafi, M.A., Shahron, S.A., Zainuddin, N., & Musa, S. (2023). The role of warehouse layout and operations in warehouse efficiency: A literature review. Journal Européen des Systèmes Automatisés (JESA), 56(1), 61–68. https://doi.org/10.18280/jesa.560109
  15. Niu, Y., & Xianqing, X. (2022). Investigation on panel material picking technology for furniture in automated raw material warehouses. BioResources, 17(3), 4499-4516. https://doi.org/10.15376/biores.17.3.4499-4516
  16. Sönmez, Z. (2013). Process improvement via six sigma methodology and an application on service sector. (MSc Thesis). İstanbul Kültür University, Institute of Social Science, İstanbul.