Application of wireless power system automation for electrical distribution system of Van, Turkey

Sabir Rüstemli(BİTLİS EREN ÜNİVERSİTESİ)
Mehmet Nuri Almalı(YÜZÜNCÜ YIL ÜNİVERSİTESİ)
Mustafa Akdağ(BİTLİS EREN ÜNİVERSİTESİ)
Pages
—
Publication Date
2017-12-26
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The application is carried out in a power distribution center found at the electrical distribution system located in Van, Turkey.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Reliable real-time information has become an important factor for safe delivery of power to the end-users and productivity of the electric utility and customer pleasure.
📊
Key Findings & Data:The commercial and operational demands of electric utilities need a high-performance data communication network that improves the electrical system performance and provides possibility of a detailed study to predict failures.
💡
Conclusion & Impact:The application is carried out in a power distribution center found at the electrical distribution system located in Van, Turkey.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Electrical power distribution system · GSM based communication · Power system automation Relays

Abstract

Reliable real-time information has become an important factor for safe delivery of power to the end-users and productivity of the electric utility and customer pleasure. Communication networks constitute the core of electrical system control applications in industry. The commercial and operational demands of electric utilities need a high-performance data communication network that improves the electrical system performance and provides possibility of a detailed study to predict failures. Supervisory Control and Data Acquisition (SCADA) systems are widely used in industry for supervisory control and data acquisition of industrial processes. Users working in various departments in an electric power company require access to SCADA data. Therefore, a design of cost-effective and reliable network architecture is a very important issue. Each network component has a specific address and the maximum amount of components is restricted for the communication channel and protocol. In this paper, a power control application is studied by using wireless technology, and a SCADA system along with the MODBUS protocol which is one of the most common communication protocols used in industrial environments. The application is carried out in a power distribution center found at the electrical distribution system located in Van, Turkey.

🔖

Cite This Article

Rüstemli, S., Özer, A., Almalı, M. N., Akdağ, M. (2017). Application of wireless power system automation for electrical distribution system of Van, Turkey. Bitlis Eren University Journal of Science and Technology, Volume: 7 Issue: 2. https://doi.org/10.17678/beuscitech.339359

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (19)

  1. Chainey, W.E. and Block, W.R. (1994). Recent advances in master station architecture. IEEE Computer Applications in Power, [online] 7(2), pp. 24–29, Available at: http://doi.org/10.1109/67.273784
  2. Conroy, E. (2001). Power monitoring and harmonic problems in the modern building. Power Engineering Journal, [online] 15(2), pp. 101–107, Available at: http://doi.org/10.1049/pe:20010207
  3. Daponte, P., DiPenta, M. and Mercurio, G. (2004), TransientMeter: A Distributed Measurement System for Power Quality Monitoring. IEEE Transactions on Power Delivery, [online] 19(2), pp. 456–463. Available at: http://doi.org/10.1109/TPWRD.2004.825200
  4. Ebata, Y., Hayashi, H., Hasegawa, Y., Komatsu, S., Suzuki, K., (2000). Development of the Intranet-based SCADA (supervisory control and data acquisition system) for power system. In: IEEE Power Engineering Society Winter Meeting 2000, [online] IEEE, 3, pp. 1656–1661, Available at: http://doi.org/10.1109/PESW.2000.847593
  5. Ericsson, G.N. (2002). Classification of power systems communications needs and requirements: experiences from case studies at Swedish National Grid. IEEE Transactions on Power Delivery, [online] 17(2), pp. 345-347, Available at: http://doi.org/10.1109/61.997896
  6. Ericsson, G.N. (2004). Communication requirements-basis for investment in a utility wide-area network. IEEE Transactions on Power Delivery, [online] 19(1), pp. 92-95, Available at: http://doi.org/10.1109/TPWRD.2003.820208
  7. Gagliarducci, M., Lampasi, D.A. and Podestà, L. (2007), GSM-based monitoring and control of photovoltaic power generation. Measurement, [online] 40(3), pp. 314–321, Available at: http://doi.org/10.1016/j.measurement.2006.05.018
  8. Gungor, V.C. and Lambert, F.C. (2006), A survey on communication networks for electric system automation. Computer Networks, [online] 50(7), pp. 877–897, Available at: http://doi.org/10.1016/j.comnet.2006.01.005
  9. Karacor, M. and Ozdemir, E. (2004). Mobile Phone-Based SCADA Automation. Measurement and Control, [online] 37(9), pp. 268–272, Available at: http://doi.org/10.1177/002029400403700901
  10. Lahti, J.P., Shamsuzzoha, A. and Kankaanpaa, T. (2011). Web-based technologies in power plant automation and SCADA systems: A review and evaluation. In: Int. Conf. on Control System, Computing and Engineering 2011, [online] Penang: IEEE, pp. 279-284. Available at: http://doi.org/10.1109/ICCSCE.2011.6190537
  11. Lakhoua, M.N. (2010). Surveillance of pumps vibrations using a supervisory control and data acquisition system. Journal of Control Engineering and Applied Informatics. 12(1), pp. 15-20.
  12. McGranaghan, M. and Goodman, F. (2005). Technical and System Requirements for Advanced Distribution Automation. In:18th Int. Conf. and Exhibition on Electricity Distribution, [online] Turin: IET, pp.1-5, Available at: http://doi.org/10.1049/cp:20051374
  13. Parikh, P.P., Kanabar, M.G. and Sidhu, T.S. (2010). Opportunities and challenges of wireless communication technologies for smart grid applications. IEEE Power and Energy Society General Meeting, 2010, [online] Minneapolis, MN: IEEE, pp. 1–7, 2010. Available at: http://doi.org/10.1109/PES.2010.5589988
  14. Ramirez Leyva, F.H., Cuellar, J.P.A., Basilio, R.G.M. and Justo, E.E. (2004). Wireless system for electrical networks testing based on MODBUS protocol. In: 14th Int. Conf. on Electronics, Communications and Computers 2004, [online] IEEE, pp. 58–62, Available at: http://doi.org/10.1109/ICECC.2004.1269549
  15. Sagi, M., Atlagic, B., Milinkov, D., Bogovac, B. and Culaja, S. (2012). High-performance distributed SCADA system architecture. In: 16th Mediterranean Electrotechnical Conference 2012, [online] Yasmine Hammamet: IEEE, pp. 152–155, Available at: http://doi.org/10.1109/MELCON.2012.6196402
  16. Tanyi, E. and Mbinkar, E (2011). A Wide Area Network for Data Acquisition and Real-time Control of the Cameroon Power System. Journal of Control Engineering and Applied Informatics, 13(1), pp. 5-11.
  17. Vigu C., Gota D.I. and Capatana D. (2010). Improving the wind speed estimation algorithms using results obtained in the field. Journal of Control Engineering and Applied Informatics. 12(3), pp. 13-17.
  18. Wu, F.F., Moslehi, K. and Bose, A. (2005). Power System Control Centers: Past, Present, and Future. In: Proc. of the IEEE, [online], 93(11), pp. 1890–1908, Available at: http://doi.org/10.1109/JPROC.2005.857499
  19. Zecevic, G. (1998). Web based interface to SCADA system. In: Int. Conf. on Power System Technology 1998, [online] Beijing: IEEE, 2, pp. 1218-1221, Available at: http://doi.org/10.1109/ICPST.1998.729279