Dergiler / International Journal of Energy Applications and Technologies / 2023 / Cilt: 10 Sayı: 1

Installation of solar power plant in Adıyaman region and analysis of solar energy potential

Sayfa
21–25
Yayın Tarihi
2023-06-30
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

In addition to these, the parameters to be considered during the SPP installation stages will be specified in detail.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:Energy is one of the most necessary and fundamental needs for human beings to continue their lives.
📊
Temel Bulgular & Veri:In this study, a 1 MW SPP feasibility study was conducted in Besni district of Adıyaman province.
💡
Sonuç & Katkı:In addition to these, the parameters to be considered during the SPP installation stages will be specified in detail.
🔬Tür:Araştırma Makalesi
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Renewable Energy · Solar energy · Green Energy

Abstract

Energy is one of the most necessary and fundamental needs for human beings to continue their lives. Solar energy, which is one of the most important renewable energy sources, has great energy potential in our country with its long radiation duration and radiation amount. The primary thing to do in solar power plant (SPP) installation is to analyze the climatic characteristics of the region. Therefore, having and analyzing the meteorological data of the region has important advantages for the solar power plant to be established. The importance of solar radiation data in the installation of a solar power plant in a region is directly proportional to the payback period of the plant under normal conditions. In this study, a 1 MW SPP feasibility study was conducted in Besni district of Adıyaman province. Depending on the energy potential of the regions, it is calculated that the payback period is between 2-5.7 years for Adıyaman province. Considering the state's electricity pricing, it is seen that the payback period in the industry is about 2 years, while it has a period of 5.7 years for house installation. SPP is analyzed in the light of solar radiation data in the Adıyaman region which will be a pioneer for future studies thanks to the depreciation period as well as analyses performed. In addition to these, the parameters to be considered during the SPP installation stages will be specified in detail.

🔖

Bu Makaleye Atıf Yap

TURAN, V., KARAKUŞ, C., ÜSTÜN, İ. (2023). Installation of solar power plant in Adıyaman region and analysis of solar energy potential. International Journal of Energy Applications and Technologies, Cilt: 10 Sayı: 1, 21–25. https://ajindex.com/articles/947486

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (9)

  1. Karapekmez, A., & Dincer, I. (2020). Comparative efficiency and environmental impact assessments of a solar-assisted combined cycle with various fuels. Applied Thermal Engineering, 164, 114409. Das, U. K., Tey, K. S., Seyedmahmoudian, M., Mekhilef, S., Idris, M. Y. I., Van Deventer, W.,. & Stojcevski, A. (2018). Forecasting of photovoltaic power generation and model optimization: A review. Renewable and Sustainable Energy Reviews, 81, 912-928.
  2. Üstün, İ., Üneş, F., Mert, İ., & Karakuş, C. (2022). A comparative study of estimating solar radiation using machine learning approaches: DL, SMGRT, and ANFIS. Energy Sources, Part A: Recovery, Utilization, and Environmental Effects, 44(4), 10322-10345.
  3. Ustun, I., Karakus, C., & Yagli, H. (2020). Empirical models for estimating the daily and monthly global solar radiation for Mediterranean and Central Anatolia region of Turkey. International Journal of Global Warming, 20(3), 249-275.
  4. Özyurt, G., & Karabalık, K. (2009). Enerji verimliliği, binaların enerji performansı ve Türkiye’deki durum.TMMOB, İnşaat Mühendisleri Odası, Türkiye Mühendislik Haberleri, 457(54), 32-34.
  5. Ferreira, A., Kunh, S. S., Fagnani, K. C., De Souza, T. A., Tonezer, C., Dos Santos, G. R., & Coimbra-Araújo, C. H. (2018). Economic overview of the use and production of photovoltaic solar energy in Brazil. Renewable and Sustainable Energy Reviews, 81, 181-191.
  6. Kong, L. G., Chen, X. L., Gong, J. H., Fan, D. J., Wang, B. L., & Li, S. (2022). Optimization of the hybrid solar power plants comprising photovoltaic and concentrating solar power using the butterfly algorithm. Energy Conversion and Management, 257, 115310. Şevik, S., & Aktaş, A. (2022). Performance enhancing and improvement studies in a 600 kW solar photovoltaic (PV) power plant; manual and natural cleaning, rainwater harvesting and the snow load removal on the PV arrays. Renewable Energy, 181, 490-503.
  7. Bansal, N., Pany, P., & Singh, G. (2021). Visual degradation and performance evaluation of utility scale solar photovoltaic power plant in hot and dry climate in western India. Case Studies in Thermal Engineering, 26, 101010. Ömeroğlu, G. (2018). Fotovoltaik-termal (PV/T) sistemin sayısal (CFD) ve deneysel analizi. Fırat University Journal of Engineering Science, 30(1), 161-167.
  8. Çağlar, A. (2018). Farklı derece-gün bölgelerindeki şehirler için optimum eğim açısının belirlenmesi. Süleyman Demirel Üniversitesi Fen Bilimleri Enstitüsü Dergisi, 22(2), 849-854.
  9. Alcan, Y., Demir, M., & Duman, S. (