Dergiler / Journal of International Environmental Application and Science / 2016 / Cilt: 11 - Sayı: 4

The determination of Drilling Machine Productivity in Trepca Mine Stantërg

Sayfa
361–365
Yayın Tarihi
2016-12-30
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

The goal is to do a study to increase efficiency and eliminate gaps by workers and the leading body of the mine while working with the drilling machine in order to increase the effect on drilling-mining (realize the largest production and to enable and achieve higher productivity).

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:Trepça mine in Stantërg has used the highest productivity and mining technique since 90s.
📊
Temel Bulgular & Veri:The machinery has worked in the working place so called P-140, in the X- horizon of “Trepca" mine in Stantërg and the main goal is to set the parameters of the work and its maximum activity - the rate of work according to their own specifications as: Work force, Structure of the rock mass and; other difficulties arising from the workplace.
💡
Sonuç & Katkı:The goal is to do a study to increase efficiency and eliminate gaps by workers and the leading body of the mine while working with the drilling machine in order to increase the effect on drilling-mining (realize the largest production and to enable and achieve higher productivity).
🔬Tür:Araştırma Makalesi
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:High Productivity · Trepça Mine · parameters drilling

Abstract

Trepça mine in Stantërg has used the highest productivity and mining technique since 90s. Today this technique is practiced almost in all working place. The purpose of this study is to determine the productivity of the drilling machine with high productivity. The machinery has worked in the working place so called P-140, in the X- horizon of “Trepca" mine in Stantërg and the main goal is to set the parameters of the work and its maximum activity - the rate of work according to their own specifications as: Work force, Structure of the rock mass and; other difficulties arising from the workplace. The goal is to do a study to increase efficiency and eliminate gaps by workers and the leading body of the mine while working with the drilling machine in order to increase the effect on drilling-mining (realize the largest production and to enable and achieve higher productivity).

🔖

Bu Makaleye Atıf Yap

GASHİ, J., JORGJİ, V., ZEQİRİ, İ., DURAKU, S., KRASNİQİ, R. (2016). The determination of Drilling Machine Productivity in Trepca Mine Stantërg. Journal of International Environmental Application and Science, Cilt: 11 - Sayı: 4, 361–365. https://ajindex.com/articles/376707

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (1)

  1. Designin of new underground mining facilities with dual function in the Pb-Zn mine of mazhiq Dr. Izet Zeqiri, Jahir Gashi, Rafet Zeqiri, University of Pristina, Kosovo Gertsch R, Bullock R, (1998) Techniques in Underground Mining Society for Mining, Metallurgy, and Exploration Littleton, Co, USA Spathis A., Gupta R. (2012) Tunnelling in Rock by Drilling and Blasting. Workshop hosted by frag blast The symposium on rock fragmentation by blasting, New Delhi, India, Torbica S, Petrovic N, (1997) Metode i Tehnologija Podzemne Eksploatacije Neslojevitih Lezista Beograd