Dergiler / Researcher / 2026 / Cilt: 04 Sayı: 01

Identification of Green Retrofitting Procurement and Permitting Processes in High-rise Office Buildings in Jakarta Based on PerMen PUPR No.21 Year 2021 and GBC Indonesia that Affects Project Time Performance

Benedict Mario(University of Indonesia)0009-0009-7040-6616
Sayfa
15–28
Yayın Tarihi
2024-07-31
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

Based on the results of literature studies, expert validation, and respondent questionnaires, a total of 83 activities in the procurement and permitting processes of green retrofitting were identified, 214 risk indicators that affect the performance of green retrofitting schedule, along with 56 prevention strategies for the high-risk situation, aiming to accelerate the growth of existing green buildings in Indonesia.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:The concept of green buildings or green buildings is highly needed in the present era, considering the drastic decline in global climate conditions.
📊
Temel Bulgular & Veri:Therefore, the objective of this research is to enhance the Performance of Green Retrofitting Implementation Time, which is expected to accelerate the growth of existing green buildings in Indonesia by identifying the Procurement and Permitting Processes of Green Retrofitting in High-Rise Office Buildings in Jakarta based on PERMEN PU NO 21 TAHUN 2021 (Regulation of the Minister of Public Works and Housing Number 21 of 2021) and Green Building Council Indonesia (GBCI) through work breakdown structure (WBS) along with their high-risk activities and improvement strategies using a preventive approach that Influences the Performance of Green Retrofitting implementation time.
💡
Sonuç & Katkı:Based on the results of literature studies, expert validation, and respondent questionnaires, a total of 83 activities in the procurement and permitting processes of green retrofitting were identified, 214 risk indicators that affect the performance of green retrofitting schedule, along with 56 prevention strategies for the high-risk situation, aiming to accelerate the growth of existing green buildings in Indonesia.
🔬Tür:Uygulamalı Anket & Alan Araştırması
📍Kapsam:2021 Verileri
⚙️Değişkenler:Green Retrofitting · High Rise Building · Work Breakdown Structure

Özet

The concept of green buildings or green buildings is highly needed in the present era, considering the drastic decline in global climate conditions. However, its development is greatly hindered because the implementation of green building concepts is primarily focused on new constructions, while almost two-thirds of the world's buildings are already built. Therefore, the objective of this research is to enhance the Performance of Green Retrofitting Implementation Time, which is expected to accelerate the growth of existing green buildings in Indonesia by identifying the Procurement and Permitting Processes of Green Retrofitting in High-Rise Office Buildings in Jakarta based on PERMEN PU NO 21 TAHUN 2021 (Regulation of the Minister of Public Works and Housing Number 21 of 2021) and Green Building Council Indonesia (GBCI) through work breakdown structure (WBS) along with their high-risk activities and improvement strategies using a preventive approach that Influences the Performance of Green Retrofitting implementation time. This research analysis involves 15 respondents' data on risks in the procurement and permitting processes, which will be processed using a qualitative risk approach. Based on the results of literature studies, expert validation, and respondent questionnaires, a total of 83 activities in the procurement and permitting processes of green retrofitting were identified, 214 risk indicators that affect the performance of green retrofitting schedule, along with 56 prevention strategies for the high-risk situation, aiming to accelerate the growth of existing green buildings in Indonesia.

Abstract

The concept of green buildings or green buildings is highly needed in the present era, considering the drastic decline in global climate conditions. However, its development is greatly hindered because the implementation of green building concepts is primarily focused on new constructions, while almost two-thirds of the world's buildings are already built. Therefore, the objective of this research is to enhance the Performance of Green Retrofitting Implementation Time, which is expected to accelerate the growth of existing green buildings in Indonesia by identifying the Procurement and Permitting Processes of Green Retrofitting in High-Rise Office Buildings in Jakarta based on PERMEN PU NO 21 TAHUN 2021 (Regulation of the Minister of Public Works and Housing Number 21 of 2021) and Green Building Council Indonesia (GBCI) through work breakdown structure (WBS) along with their high-risk activities and improvement strategies using a preventive approach that Influences the Performance of Green Retrofitting implementation time. This research analysis involves 15 respondents' data on risks in the procurement and permitting processes, which will be processed using a qualitative risk approach. Based on the results of literature studies, expert validation, and respondent questionnaires, a total of 83 activities in the procurement and permitting processes of green retrofitting were identified, 214 risk indicators that affect the performance of green retrofitting schedule, along with 56 prevention strategies for the high-risk situation, aiming to accelerate the growth of existing green buildings in Indonesia.

🔖

Bu Makaleye Atıf Yap

Mario, B. (2024). Identification of Green Retrofitting Procurement and Permitting Processes in High-rise Office Buildings in Jakarta Based on PerMen PUPR No.21 Year 2021 and GBC Indonesia that Affects Project Time Performance. Researcher, Cilt: 04 Sayı: 01, 15–28. https://ajindex.com/articles/1537234

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (34)

  1. Arnell, N. W., Lowe, J. A., Challinor, A. J., & Osborn, T. J. (2019). Global and regional impacts of climate change at different levels of global temperature increase. Climatic Change, 155(3), 377–391. https://doi.org/10.1007/s10584- 019-02464-z
  2. Lubis, R. F., Delinom, R., & Geoteknologi, P. (n.d.). PERUBAHAN IKLIM DAN PEMANASAN GLOBAL DI INDONESIA; DAMPAKNYA TERHADAP KONDISI BAWAH PERMUKAAN STUDI KASUS: DKI JAKARTA.
  3. Skytt, T., Nielsen, S. N., & Jonsson, B. G. (2020). Global warming potential and absolute global temperature change potential from carbon dioxide and methane fluxes as indicators of regional sustainability – A case study of Jämtland, Sweden. Ecological Indicators, 110. https://doi.org/10.1016/j.ecolind.2019.105831
  4. BPHN. (n.d.). na_ruu_ratifikasi_paris_agreement (2). Na_ruu_ratifikasi_paris_agreement. Retrieved July 23, 2023, from https://bphn.go.id/data/documents/na_ruu_ratifikasi_paris_agreement.pdf
  5. Eko, W., Peneliti Bidang, C., Ozon, P., & Udara, P. (n.d.). PENGARUH PEMANASAN GLOBAL TERHADAP LINGKUNGAN BUMI.
  6. Izumi, F. (2020). Climate Emergency Declaration. Climate Emergency Declaration.
  7. UGM (n.d) The building industry contributes to the process of environmental degradation
  8. Architecture 2030. (n.d.). Actions For Zero Carbon Buildings Existing Buildings.
  9. Devi, Tr., & Reddy, Vs. (n.d.). Work Breakdown Structure of the Project. In International Journal of Engineering Research and Applications (IJERA) (Vol. 2). www.ijera.com
  10. Regulation of the Minister of State for the Environment Number 16 of 2012 concerning Performance Evaluation Green Building
  11. The U.S. Green Building Council. (n.d.). Building Retrofits.
  12. Green Building Council Indonesia. (n.d.). GREENSHIP Rating Tools Existing Building.
  13. Presidential Regulation Number 12 of 2021 concerning Government Procurement of Goods/Services
  14. Sutedi, Adrian., (2012) Legal aspects of the procurement of goods and services and their various issues
  15. Andrianto, Nico., (2007) Transparency and public accountability through e-government
  16. Priyanta, M. (2019). Regulasi Perizinan Mendirikan Bangunan dalam Mendukung Kemudahan Berusaha Menuju Bangsa yang Adil dan Makmur. https://doi.org/10.24843/JMHU.2019.v08.i03
  17. Simbawa, Anggreini Anglia., (2022) Procedure for obtaining building construction approval
  18. Government Regulation Number 16 of 2021 concerning building
  19. Minister of Public Works and Housing Regulation Number 27/PRT/M/2018 on the Certificate of Functionality for Buildings
  20. Minister of Environment Regulation Number 16 of 2012 on Guidelines for the Preparation of Environmental Documents
  21. Burghate, M. (2018). Work Breakdown Structure: Simplifying Project Management. In International Journal of Commerce and Management Studies (IJCAMS) (Vol. 3, Issue 2). www.ijcams.com
  22. A Guide to the Project Management Body of Knowledge (PMBOK 6 ® Guide)
  23. Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 2017; Kerzner,
  24. Strategic Planning for Project Management Using a Project Management Maturity Model, 2001 24. Wideman, Risk Management. A guide to managing risk opportunities, 1992
  25. Zhao, X., Hwang, B.G., and See, Y.L. (2015). Green Retrofit Projects: Risk Assessment and Mitigation. E (Eds) Procs 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK, Association of Researchers in Construction Management, 125-134.
  26. Hwang, B. G., Shan, M., Phua, H., & Chi, S. (2017). An exploratory analysis of risks in green residential building construction projects: The case of Singapore. Sustainability (Switzerland), 9(7). https://doi.org/10.3390/su9071116
  27. Bacon, R. W., & Besant-Jones, J. E. (1998). Estimating construction costs and schedules Experience with power generation projects in developing countries. In Energy Policy (Vol. 26, Issue 4).
  28. (Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 2017)
  29. Yean, F., Ling, Y., Swee,;, Chan, L., Chong,; Edwin, & Ee, L. P. (n.d.). Predicting Performance of Design-Build and Design-Bid-Build Projects. https://doi.org/10.1061/ASCE0733-93642004130:175
  30. Lusi indah, Wijayanti., Development of quality management system procurement consultant services to improve procurement performance in Ministry of Transportation (2017)
  31. Huston, Charles L. Management of Project Procurement. (1996)
  32. Sudarwani, M. M. (2021). The implementation of green architecture and green building is an effort to achieve sustainable architecture.
  33. Lubis, R. F., Delinom, R., & Geoteknologi, P. (n.d.). PERUBAHAN IKLIM DAN PEMANASAN GLOBAL DI INDONESIA; DAMPAKNYA TERHADAP KONDISI BAWAH PERMUKAAN STUDI KASUS: DKI JAKARTA.
  34. Yean, F., Ling, Y., Swee,;, Chan, L., Chong,; Edwin, & Ee, L. P. (n.d.). Predicting Performance of Design-Build and Design-Bid-Build Projects. https://doi.org/10.1061/ASCE0733-93642004130:175