Concept Paper on exploited area Ore Body S-150 of Horizon XI in "Trepca" Stanterg Mine

Jahir Gashi(Independent Commission for Mines and Minerals, Prishtina, KOSOVO)
Sayfa
—
Yayın Tarihi
2016-12-30
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

Mining of the safety plates by planning the safety pillars inside the ore body is a method that has not been practiced yet in the Trepça Stanterg   mine.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:The orebodies of the mineral deposit Trepça in Stanterg are usually characterized with a dipping angle which is followed with a stable working medium.
📊
Temel Bulgular & Veri:To ensure a safe production capacity must have enough “stopes” (working sites) which are mined in the mining horizons.
💡
Sonuç & Katkı:Mining of the safety plates by planning the safety pillars inside the ore body is a method that has not been practiced yet in the Trepça Stanterg   mine.
🔬Tür:Research Article
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:security crown · ore body · pillar

Abstract

The orebodies of the mineral deposit Trepça in Stanterg are usually characterized with a dipping angle which is followed with a stable working medium. To ensure a safe production capacity must have enough “stopes” (working sites) which are mined in the mining horizons. The mining system of ore bodies is mainly done with the principle of “etages”(floors principle) from the bottom-up with a certain number of mining systems. In all cases, during the mining phase, when the ore bodies are in large size there are left safety pillars and safety plates. Even though in Trepca mine was not practiced the mining of safety plates still some of them have been mined out. Mining of the safety plates by planning the safety pillars inside the ore body is a method that has not been practiced yet in the Trepça Stanterg   mine.

🔖

Bu Makaleye Atıf Yap

Gashi, J., Jorgji, V., Zeqiri, İ., Zeqiri, R. (2016). Concept Paper on exploited area Ore Body S-150 of Horizon XI in "Trepca" Stanterg Mine. Journal of International Environmental Application and Science, Volume: 11 Issue: 4. https://ajindex.com/articles/1112439

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (5)

  1. Gertsch R, Bullock R, Techniques in Underground Mining Society for Mining, Metallurgy, and Exploration Littleton, Co, USAPage 60-63
  2. Guxha S, (1973) Underground Mining Explation Methods, University of Tirana
  3. Harmin H, (2011) Undergraund mining methods and Applications Mining Engineering, Chapter 1, page10-12.
  4. Hetemi M, Sinani B, Gashi J, (2011) Decline opening and calculations by the software 3dstudiomax in Trepça mine in Stan terg.
  5. Lategan PN, (2009) Shaft sinking scheduling/planning. Shaft Sinking and Mining