Journals / Textile and Apparel / 2014 / Cilt: 24 Sayı: 4

MODELING OF TEXTILE DYEING-FINISHING MILL PRODUCTION COST AND TIME UNDER VARIABLE DEMAND CONDITIONS WITH SIMULATION

TEKSTİL BOYA TERBİYE İŞLETMESİNDE ÜRETİM MALİYETİ VE SÜRESİNİN DEĞİŞKEN TALEP ALTINDA SİMÜLASYONLA MODELLENMESİ

Pages
371–379
Publication Date
2014-12-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

It is demonstrated that production cost and time of dying-finishing mills are modeled by simulation technique and the model can be solved

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this study, production cost and production time of a selected dyeing-finishing textile mill is modeled for the type of fabric under variable demand at short and medium term planning period.
📊
Key Findings & Data:In the model using real data, production cost and production time could be calculated and also the operator needs have been determined.
💡
Conclusion & Impact:It is demonstrated that production cost and time of dying-finishing mills are modeled by simulation technique and the model can be solved
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Boya-Terbiye · Üretim Süresi · Üretim Maliyeti

Abstract

In this study, production cost and production time of a selected dyeing-finishing textile mill is modeled for the type of fabric under variable demand at short and medium term planning period. In the model using real data, production cost and production time could be calculated and also the operator needs have been determined. It is demonstrated that production cost and time of dying-finishing mills are modeled by simulation technique and the model can be solved

Özet

Bu çalışmada seçilmiş bir boya terbiye işletmesinin üretim maliyeti ve süresi değişken talebe dayalı olarak orta ve kısa dönemli planlama için simülasyon yöntemiyle kumaş türlerine modellenmiştir. Modele ilişkin gerçek veriler kullanılarak boya terbiyede üretim maliyeti, üretim süresi hesaplanabilmiş ve üretim için gerekli operatör ihtiyacı belirlenebilmiştir. Boya terbiye işletmelerinin üretimin maliyet ve süreye dayalı olarak simülasyon tekniği ile modellenebileceği ve modelin çözülebileceği ortaya konulmuştur

🔖

Cite This Article

SABIR, E. C., BATUK, E. (2014). MODELING OF TEXTILE DYEING-FINISHING MILL PRODUCTION COST AND TIME UNDER VARIABLE DEMAND CONDITIONS WITH SIMULATION. Textile and Apparel, Cilt: 24 Sayı: 4, 371–379. https://ajindex.com/articles/943744

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (9)

  1. Sabır, E.C., Batuk, E., 2013. “Demand Forecasting Withof Using Time Series Models in Textile Dyeing-Finishing Mills”, Tekstil ve Konfeksiyon, Volume: 23 Issue: 2 / APRIL – JUNE
  2. Batuk E., 2010. “Production Planning And Optimization In Dyeing Finishing Plant”, University of Çukurova, Department of Textile Engineering, Unpublished Master Thesis, (In Turkish: Boya-Terbiye İşletmesinde Üretim Planlama ve Optimizasyon
  3. Metters R.,1997. “Production Planning With Stocastic Seasonal Demand and Capacitated Production”, IEE Transections, 29, p 1017- 1029 4. Karacapilidis N., Pappis C., 1996. “Production Planning And Control in Textile Industry:A Case Study”, CiteseerX, German National Research Center for Information Technology, Computers in Industry, Vol 30, No:2 5. Pekmezci T., Demireli C., 2005. “Esnek Üretim Sistemlerinin Tekstil İşletmelerinde Uygulanabilirliği Üzerine Bir Araştırma”, C.Ü. İktisadi ve İdari Bilimler Dergisi, Cilt 6,sayı 1
  4. Göçken M., 2009. “A Simulated Based Approach to Develop New Approaches for “Due Date Assignment” and “Job Release” in MultiStage Job Shops”, University of Gaziantep, Department of Industrial Engineering, PhD Thesis, pp:284, Gaziantep/Turkey (In Turkish: Çok Aşamalı Atölye Tipi Üretim Sistemlerinde ‘Teslim tarihi Atama’ ve Sipariş alma için Benzetim Tabanlı Yeni yaklaşımlar
  5. Öztürk M. U., 2007. “Multigoal linear programming in production planning and its application in a textile company”, University of Uludağ, The Institue of Social Sciences, Master Thesis, Bursa/Turkey, (In Turkish: Üretim Planlamasında Çok Hedefli Doğrusal Hedef Programlama ve Bir Tekstil İşletmesinde Uygulama)
  6. Okşan D., 2006. “The Study Of Computer Supported Source Usage And Production Planning Systems At The Thextile Factories: The Sample of Denizli”, Denizli, University of Pamukkale, Master Thesis, Denizli/Turkey, (In Turkish: Tekstil İşletmelerinde Bilgisayara Dayalı Kaynak Kullanımı ve Üretim Planlama Sistemleri Üzerine Bir İnceleme: Denizli Örneği
  7. Ferraris, G., 2005. “Simulation in the Textile Industry: Production Planning Optimization”, Social Science Research Network, University of Turin
  8. Pastor R., Altimiras J., Mateo M., 2009, “Planning production Using Mathematical Programming: The case of Woodturning Company”, Computers & Operation Research, 36:2173-2178
  9. Laoboonlur, P., Hodgson T.J., Thoney K.A., 2006. “Production Scheduling In A Knitted Fabric Dyeing And Finishing Process”, The Textile Institue, Vol.97, No.5, pp.