⚡ TL;DR(Too Long; Didn't Read)

In this study, a new bonus system is suggested as an alternative to the existing system for coal production applied in Turkish Hardcoal Enterprise (TTK) , assessing the factors affecting the coal production and aiming to use the same measures in the five production units in the basin

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this study, a new bonus system is suggested as an alternative to the existing system for coal production applied in Turkish Hardcoal Enterprise (TTK) , assessing the factors affecting the coal production and aiming to use the same measures in the five production units in the basin
📊
Key Findings & Data:In this study, a new bonus system is suggested as an alternative to the existing system for coal production applied in Turkish Hardcoal Enterprise (TTK) , assessing the factors affecting the coal production and aiming to use the same measures in the five production units in the basin
💡
Conclusion & Impact:In this study, a new bonus system is suggested as an alternative to the existing system for coal production applied in Turkish Hardcoal Enterprise (TTK) , assessing the factors affecting the coal production and aiming to use the same measures in the five production units in the basin
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Coal Seam Thickness · Manshift · Difficulty Coefficient

Abstract

In this study, a new bonus system is suggested as an alternative to the existing system for coal production applied in Turkish Hardcoal Enterprise (TTK) , assessing the factors affecting the coal production and aiming to use the same measures in the five production units in the basin

Özet

Bu çalışmada, Türkiye Taşkömürü Kurumu'nda (TTK) uygulanan kömür kazısı prim sistemine alternatif bir yaklaşım olarak yeni bir prim sistemi önerilmiştir. Yeni sistemde üretime etki eden faktörler değerlendirilerek kömür üretiminin artışı hedeflenmiş, havzada beş üretim müessesesinde aynı ölçütlerin kullanılması planlanmıştır.

🔖

Cite This Article

OKTAY, Y. (2004). An Alternative Approach to the Existing Bonus System for Coal Production Applied in Turkish Hardcoal Enterprise. Bilimsel Madencilik Dergisi, Cilt: 43 - Sayı: 4, 41–45. https://ajindex.com/articles/90328