Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3)

Pages
12119–12142
Publication Date
2022-07-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

RAMP3 was validated on two real PPP projects and results show that the higher risk value of an agent gets, agent’s utility due to counter agent in that concession round lowers.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The performance of the Public Private Partnership (PPP) projects depends on the efficiency of the risk allocation strategies between the public and private parties.
📊
Key Findings & Data:Therefore, a multi agent system-based Risk Allocation Model for PPP projects (RAMP3) was developed to determine the proper risk allocation decisions between the public and private parties within the study.
💡
Conclusion & Impact:RAMP3 was validated on two real PPP projects and results show that the higher risk value of an agent gets, agent’s utility due to counter agent in that concession round lowers.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Construction Industry · Construction Projects · Multi-Agent System (MAS)

Abstract

The performance of the Public Private Partnership (PPP) projects depends on the efficiency of the risk allocation strategies between the public and private parties. Therefore, a multi agent system-based Risk Allocation Model for PPP projects (RAMP3) was developed to determine the proper risk allocation decisions between the public and private parties within the study. The methodology of RAMP3 involves i) identification of risks by agents, ii) assessment of each risk’s importance and impact, iii) communication of agents to negotiate on risk allocation decision and iv) determination of strategies and utility functions to be used in negotiation process. Focus of the study is presenting the steps of negotiation process of agents using economic theory and Zeuthen bargaining strategy. RAMP3 was validated on two real PPP projects and results show that the higher risk value of an agent gets, agent’s utility due to counter agent in that concession round lowers. Preliminary findings also show that risk is allocated to the party that has a higher risk acceptability in negotiation process. The RAMP3 will enable project parties to determine the appropriate risk allocation strategies by considering the effects of emerging risks in terms of time delay, cost overrun and conflict and provide contract success. The model can also be used as a decision support system by public partner for performing an efficient and accurate risk allocation.

Özet

The performance of the Public Private Partnership (PPP) projects depends on the efficiency of the risk allocation strategies between the public and private parties. Therefore, a multi agent system-based Risk Allocation Model for PPP projects (RAMP3) was developed to determine the proper risk allocation decisions between the public and private parties within the study. The methodology of RAMP3 involves i) identification of risks by agents, ii) assessment of each risk’s importance and impact, iii) communication of agents to negotiate on risk allocation decision and iv) determination of strategies and utility functions to be used in negotiation process. Focus of the study is presenting the steps of negotiation process of agents using economic theory and Zeuthen bargaining strategy. RAMP3 was validated on two real PPP projects and results show that the higher risk value of an agent gets, agent’s utility due to counter agent in that concession round lowers. Preliminary findings also show that risk is allocated to the party that has a higher risk acceptability in negotiation process. The RAMP3 will enable project parties to determine the appropriate risk allocation strategies by considering the effects of emerging risks in terms of time delay, cost overrun and conflict and provide contract success. The model can also be used as a decision support system by public partner for performing an efficient and accurate risk allocation.

🔖

Cite This Article

ALADAĞ, H., IŞIK, Z. (2022). Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3). Turkish Journal of Civil Engineering, Cilt: 33 - Sayı: 4, 12119–12142. https://ajindex.com/articles/864115

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (13)

  1. Ke, Y., Wang, S., Chan, A. P., Lam, P. T. I., Preferred Risk Allocation in China’s Public–Private Partnership (PPP) Projects, International Journal of Project Management, 28(5), 482–492, 2010.
  2. Hwang, B. G., Zhao, X., Gay, M. J.S., Public Private Partnership Projects in Singapore: Factors, Critical Risks and Preferred Risk Allocation from the Perspective of Contractor, International Journal of Project Management, 31(3), 424-433, 2013.
  3. Gross, M. E., Aligning Public-Private Partnership Contracts with Public Objectives for Transportation Infrastructure, Doctoral Thesis, Virginia Polytechnic Institute and State University, 2010.
  4. Yun-na, W. U., Xin-liang, H. U., Ling-shuang, X. U., Ze-zhong, L., Research on Risk Allocation of Public-Private Partnership Projects Based on Rough Set Theory, Communications in Information Science and Management Engineering, 2(7), 15-20, 2012.
  5. Marques, R. C., Berg, S., Risks, Contracts, and Private-Sector Participation in Infrastructure, Journal of Construction Engineering and Management, 137(11), 925-932, 2011.
  6. Thomas, A. V., Kalidindi, S. N., Ananthanarayanan, K., Risk Perception Analysis of BOT Road Project Participants in India, Construction Management and Economics, 21(4), 393–407, 2003.
  7. Lam, K. C., Wang, D., Lee, T. K. P., Tsang, Y. T., Modelling Risk Allocation Decision in Construction Contracts, International Journal of Project Management, 25(5), 485–493, 2000.
  8. Ren, Z., Anumba, C. J., Multi-Agent Systems in Construction–State of The Art and Prospects, Automation in Construction, 13(3), 421-434, 2004.
  9. Zhu, L., Zhao, X., Chua, D. K. H. Agent-Based Debt Terms’ Bargaining Model to Improve Negotiation Inefficiency in PPP Projects. Journal of Computing in Civil Engineering, 30(6), 04016014, 2016.
  10. Ke, Y., Wang, S., Chan, A., Cheung, E., Research Trends of PPP in Construction Journal, Journal of Construction Engineering and Management, 135(10), 1076–1086, 2009.
  11. Chengshuang, S., Guochang, Risk Management Framework of Multi-agent System for Construction Projects. Journal of Northeast Forestry University, 1-5, 2006.
  12. Li, B., Ren, Z., Bayesian Technique Framework for Allocating Demand Risk Between The Public and Private Sector in PPP Projects, 6th International Conference on Service Systems and Service Management, China, 2009.
  13. Karakas, K., Dikmen, I., Birgonul, M.T., Multiagent System to Simulate Risk-Allocation and Cost-Sharing Processes in Construction Projects, Journal of Computing in Civil Engineering, 27(3), 307-319, 2013. Taillandier