Journals / Teknik Dergi / 2022 / Cilt: 33 - Sayı: 4

Effect of Sub-Contractor Selection on Construction Project Success in Turkey

Pages
12105–12118
Publication Date
2022-10-18
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The impact of the subcontracting selection factor on projects’ overall performance was presented with five hypotheses and modeled using a structural equation model.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The construction industry leads the national economy in developing countries.
📊
Key Findings & Data:Therefore, projects’ success varies depending on subcontractors’ rather than general contractors’ performance.
💡
Conclusion & Impact:The impact of the subcontracting selection factor on projects’ overall performance was presented with five hypotheses and modeled using a structural equation model.
🔬Design:Survey & Empirical Study
📍Scope:Comprehensive Sample
⚙️Variables:Sub-contracting in construction projects · sub-contracting selection factors · relationship between subcontractor project performance

Abstract

The construction industry leads the national economy in developing countries. It involves industrial requirements, such as developing technologies, related expertise, demand variability, high production speed and progress. Firms in the industry use subcontractors to produce fast, effective solutions. Therefore, projects’ success varies depending on subcontractors’ rather than general contractors’ performance. This study aimed to develop a model of selection criteria for subcontractors and measure their impact on project success. Construction firms using subcontractors were chosen as the target group. Data on the selection of subcontractors from 93 construction firms that employ subcontractors in their projects were collected through a survey. The impact of the subcontracting selection factor on projects’ overall performance was presented with five hypotheses and modeled using a structural equation model. The weight of each selection factor in the subcontracting selection and the impact on the overall project were designated in the model by determining the standardized regression weights (β). Four hypotheses were accepted and one rejected. This study may contribute to the prequalification conditions in the process of selecting subcontractors in the future.

Özet

The construction industry leads the national economy in developing countries. It involves industrial requirements, such as developing technologies, related expertise, demand variability, high production speed and progress. Firms in the industry use subcontractors to produce fast, effective solutions. Therefore, projects’ success varies depending on subcontractors’ rather than general contractors’ performance. This study aimed to develop a model of selection criteria for subcontractors and measure their impact on project success. Construction firms using subcontractors were chosen as the target group. Data on the selection of subcontractors from 93 construction firms that employ subcontractors in their projects were collected through a survey. The impact of the subcontracting selection factor on projects’ overall performance was presented with five hypotheses and modeled using a structural equation model. The weight of each selection factor in the subcontracting selection and the impact on the overall project were designated in the model by determining the standardized regression weights (β). Four hypotheses were accepted and one rejected. This study may contribute to the prequalification conditions in the process of selecting subcontractors in the future.

🔖

Cite This Article

KARAMAN, A. E., SANDAL, K. (2022). Effect of Sub-Contractor Selection on Construction Project Success in Turkey. Teknik Dergi, Cilt: 33 - Sayı: 4, 12105–12118. https://ajindex.com/articles/596540

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (12)

  1. Doloi, H., Iyer, K.C. and Sawhney, A., Structural equation model for assessing impacts of contractor’s performance on project success, International Journal of Project Management, Vol. 29, pp. 687-695, 2011.
  2. El-Mashaleh, M. S., A construction subcontractor selection model, Jordan Journal of Civil Engineering, Vol. 3., No.4, pp. 375-378, 2009.
  3. Ng, S. T.; Luu, C. D. T., Modelling subcontractor registration decisions through case-based reasoning approach, Automation in Construction Vol. 17, No. 7, pp. 873–881, 2008.
  4. Benjaoran, V., A cost control system development: A collaborative approach for small and medium-sized contractors, International Journal of Project Management, Vol. 27, pp. 270–277, 2009.
  5. Albino V and Garavelli A.C., A neural network application to subcontractor rating in construction firms, International Journal of Project Management, Vol. 16, pp. 9–14, 1998.
  6. Mbachu, J., Conceptual framework for the assessment of subcontractors’ eligibility and performance in the construction industry, Construction Management and Economics Vol.26, pp. 471–484, 2008.
  7. Marzouk M. M., El-Kherbawy A. A. and Khalifa M., Factors influencing sub-contractors selection in construction projects, HBRC Journal, Vol. 9, No.2, pp. 150–158, 2013. Hinze J. and Tracey A.2 Contractor-subcontractor relationship: the subcontractor's view, Journal of Construction Engineering and Management, Vol. 120, No. 2, pp. 274–287, 1994.
  8. Dainty, A, Briscoe. G, and Millet. O., Subcontractor perspective on supply chain alliances, Construction management and Economics, Vol.19, No. 2, pp. 841-848, 2010. Eccles,R., Bureaucratic versus craft administration: the relationships of market structure to the construction firm, Administrative Science Quarterly, Vol. 26, No. 3, pp. 449-469, 1981. Miller,C.; Packham, G. and Thomas, B., Harmonisation between main contractors and subcontractors: prerequisite for lean construction, Journal of Management in Engineering, Vol. 16, No. 3, pp. 47-57, 2002.
  9. Kumaraswamy, M. and Matthews, J., Improved subcontractor selection employing, Journal of Construction Research Partnering Principles, Vol. 16, No. 3: pp. 47-57, 2000.
  10. Brook, M., Estimating and tendering for construction work, Oxford: Butterworth Heinemann, 2008.
  11. Shiau, Y., Tsai, T., Wang, W. and Huang, M., Use questionnaire and AHP techniques to develop subcontractor selection system, Construction Management and Economics, Vol. 33, No. 2, pp. 1-6, 2002.
  12. Ulubeyli, S., Uluslararası inşaat projelerinde alt yüklenici seçi