Journals / Balıkesir Üniversitesi Fen Bilimleri Enstitüsü Dergisi / 2026 / Cilt: 28 Sayı: 1

Construction equipment selection with AHP method

AHP yöntemi ile iş makinesi seçimi

Ali Erkan Karaman(BALIKESİR ÜNİVERSİTESİ, MÜHENDİSLİK FAKÜLTESİ)0000-0003-1958-9743
Pages
99–109
Publication Date
2026-01-09
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

As a result of the analysis, the most suitable construction machine among the four alternatives was identified.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:With the advancement of technology, the automation process is rapidly progressing in all sectors; however, the construction industry still maintains its human-centered traditional work approach.
📊
Key Findings & Data:Due to the presence of various high-volume activities on construction sites, the use of heavy machinery becomes essential to achieve time and cost savings.
💡
Conclusion & Impact:As a result of the analysis, the most suitable construction machine among the four alternatives was identified.
🔬Design:Araştırma Makalesi
📍Scope:Comprehensive Sample
⚙️Variables:AHP yöntemi · iş makinesi seçimi · karar alma problemi

Abstract

With the advancement of technology, the automation process is rapidly progressing in all sectors; however, the construction industry still maintains its human-centered traditional work approach. Due to the presence of various high-volume activities on construction sites, the use of heavy machinery becomes essential to achieve time and cost savings. In this study, seven evaluation criteria that stand out in the literature for the selection of construction equipment were determined. Based on these criteria, the decision-making problem of selecting one of four construction machines was solved using the Analytic Hierarchy Process method. Consistency analyses were conducted for the comparison matrices that form the structure of AHP. As a result of the analysis, the most suitable construction machine among the four alternatives was identified.

Özet

Gelişen teknoloji ile birlikte otomasyon süreci tüm sektörlerde hızla ilerlese de inşaat sektörü insan odaklı geleneksel çalışmayı halen sürdürmektedir. Şantiyelerde birbirinden farklı ve yüksek metrajlı aktivitelerin olmasından dolayı, süre ve maliyetten kazanım sağlama amacıyla iş makinelerinin kullanımını zorunlu kılmaktadır. Bu çalışmada iş makinalarının seçiminde literatürde ön plana çıkan 7 değerlendirme kriteri belirlenmiş, bu kriterlere göre 4 iş makinesinden birinin seçilmesine ilişkin karar alma probleminin analitik hiyerarşi prosesi (AHP)yöntemi ile çözümlenmesi amaçlanmıştır. AHP’nin yapısını oluşturan karşılaştırma matrislerine ilişkin tutarlılık analizleri yapılmıştır. Analiz sonucunda 4 iş makinesi alternatifi arasından en uygunu belirlenmiştir.

🔖

Cite This Article

Karaman, A. E. (2026). Construction equipment selection with AHP method. Balıkesir Üniversitesi Fen Bilimleri Enstitüsü Dergisi, Cilt: 28 Sayı: 1, 99–109. https://doi.org/10.25092/baunfbed.1664244

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (19)

  1. Saaty, T. L., The Analytic Hierarchy Process. New York, NY, USA: McGraw-Hill, (1980).
  2. Harris, F. ve McCaffer, R., Modern Construction Management. Chichester, UK: John Wiley & Sons, (2013).
  3. Bock, T. ve Linner, T., Robot-oriented design: Design and Management Tools for the Deployment of Automation and Robotics in Construction. Cambridge, UK: Cambridge University Press, (2016).
  4. Wang, L., Zhang, J. ve Liu, Y., Artificial intelligence in construction equipment selection: A review, Advanced Engineering Informatics, 38, 676–688, (2018).
  5. Zhang, Y., Wang, H. ve Liu, Z., Environmental impact assessment of construction equipment: A life cycle approach, Journal of Cleaner Production, 258, 120725, (2020).
  6. Al-Hussein, M., Alshibani, A. ve Alkass, S., A model for selecting construction equipment using genetic algorithms, Construction Innovation, 5(2), 73–86, (2005).
  7. Marzouk, M. ve Moselhi, O., A decision support tool for equipment selection in construction projects, Journal of Construction Engineering and Management, 129(5), 528–535, (2003).
  8. Jarkas, A. M. ve Bitar, C. G., Factors affecting construction labor productivity in Kuwait, Journal of Construction Engineering and Management, 138(7), 811–820, (2012).
  9. Shapira, A. ve Goldenberg, M., AHP-based equipment selection model for construction projects, Journal of Construction Engineering and Management, 131(7), 803–811, (2005).
  10. Elbeltagi, E., Hegazy, T. ve Grierson, D., Comparison among five evolutionary-based optimization algorithms, Advanced Engineering Informatics, 19(1), 43–53, (2005).
  11. Liu, Z., Chen, H. ve Zhang, Y., Sustainable construction equipment selection: A multi-criteria decision-making approach, Sustainable Cities and Society, 72, (2021).
  12. Li, X., Wang, Y. ve Zhang, Q., IoT-based equipment monitoring in construction: A case study, Journal of Building Engineering, 65, (2023).
  13. Smith, J. ve Johnson, R., Heavy equipment in construction: Types and applications, Construction Management and Economics, 38(5), 456–468, (2020).
  14. Wang, Y., Zhang, X. ve Liu, H., Autonomous construction equipment: Current trends and future directions, Automation in Construction, 125, 103–115, (2021).
  15. Zhang, Y. ve Liu, H., Cost and performance analysis of construction equipment in large-scale projects, Journal of Construction Engineering and Management, 146(8), 04020085, (2020).
  16. Green, T. ve Brown, L., Sustainable construction equipment: A review of electric and hybrid machinery, Journal of Cleaner Production, 215, 1–12, (2019).
  17. Taylor, M. ve Lee, K., The impact of construction machinery on project management efficiency, International Journal of Project Management, 40(3), 234–245, (2022).
  18. Eren, T., Abalı, Y. A. ve Kutlu, B. S., Çok ölçütlü karar verme yöntemleri ile bursiyer seçimi: Bir eğitim kurumunda uygulama, Atatürk Üniversitesi İktisadi ve İdari Bilimler Dergisi, 26(3–4), 259–272, (2012).
  19. Şengül, Ü., Eren, M. ve Eslamıan Shıraz, S., Bulanık AHP ile belediyelerin toplu taşıma araç seçimi, Erciyes Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, (40), 143–165, (2015).