Journals / International Journal of Engineering and Geosciences / 2021 / Cilt: 6 - Sayı: 2

Determining highway slope ratio using a method based on slope angle calculation

Pages
98–103
Publication Date
2022-10-19
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The proposed approach will enable project managers and designers to determine more reliable earthwork volume during project feasibility studies without any application in the field.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Geographic Information System (GIS) is a vital tool used in numerous areas related to natural science and engineering studies.
📊
Key Findings & Data:Managing complex data and obtaining accurate results from the analysis are essential functions of GIS.
💡
Conclusion & Impact:The proposed approach will enable project managers and designers to determine more reliable earthwork volume during project feasibility studies without any application in the field.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Geographic Information Systems (GIS) · Highway construction · Stability analysis

Abstract

Geographic Information System (GIS) is a vital tool used in numerous areas related to natural science and engineering studies. Managing complex data and obtaining accurate results from the analysis are essential functions of GIS. It is also efficiently used in highway designing both in project and application phases. This study proposes a new calculation method of slope angles to determine the suitable slope modal of a road by using topographic and geological datasets in a GIS environment. Using this method in the preparation phase of the project enables a more accurate calculation of earthwork volume. The proposed method was applied to a highway to prove this idea. The selected road is a significant tertiary of which project was completed by the Turkish General Directorate of Highways. In this study, the calculated values of the project were considered as references. Comparing both results obtained from the proposed method and application project, the accuracy of the slope modal of the proposed method is 71%, and the accuracy of its earthwork volume is 99%. The proposed approach will enable project managers and designers to determine more reliable earthwork volume during project feasibility studies without any application in the field.

🔖

Cite This Article

GÜLGEN, F., YILMAZ, O. S., ÖZKAN, G. (2022). Determining highway slope ratio using a method based on slope angle calculation. International Journal of Engineering and Geosciences, Cilt: 6 - Sayı: 2, 98–103. https://ajindex.com/articles/540679

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (5)

  1. Abramson L W, Lee T S, Sharma S & Boyce G M (2001). Slope stability and stabilization methods. John Wiley & Sons. ISBN: 978-0471384939
  2. Aissi H, Chakhar S & Mousseau V (2012). GIS-based multicriteria evaluation approach for corridor siting. Environment and Planning B: Planning and Design, 39(2), 287–307. DOI: 10.1068/b37085 Berry J K (2000). Analyzing accumulation surfaces. Map Analysis: Procedures and Applications in GIS Modelling Technical Report. Berry and Associates//Spatial Informations Systems Inc. Chang K T (2016). Introduction to geographical information systems. 8th edition. McGraw Hill. New York, USA. Chew E P, Goh C J & Fwa T F (1989). Simultaneous optimization of horizontal and vertical alignments for highways. Transportation Research Part B: Methodological, 23(5), 315–329. DOI: 10.1016/0191-2615(89)90008-8
  3. Clarke K C (1986). Advances in Geographic information systems. Computers, Environment and Urban Systems, 10, 175-184. DOI: 10.1016/0198-9715(86)90006-2 Collischonn W & Pilar J V (2000). A direction dependent least-cost-path algorithm for roads and canals. International Journal of Geographical Information Science, 14(4), 397–406. DOI: 10.1080/13658810050024304 Dijkstra E W (1959). A note on two problems in connexion with graphs. Numerische Mathematik, 1(1), 269–271.
  4. Eastman J R (1989). Pushbroom algorithms for calculating distances in raster grids. In Proceedings Autocarto, 9, 288–297. Effat H A & Hassan O A (2013). Designing and evaluation of three alternatives highway routes using the Analytical Hierarchy Process and the least-cost path analysis, application in Sinai Peninsula, Egypt. The Egyptian Journal of Remote Sensing and Space Sciences, 16(2), 141–151. DOI: 10.1016/j.ejrs.2013.08.001 Goodchild M F (2009). Geographic Information System. Encyclopedia of Database Systems. Springer, Boston, MA: Springer US. Gülgen F & Gökgöz T (2010). A new algorithm for extraction of continuous channel networks without problematic parallels from hydrologically corrected DEMs. Boletim de Ciências Geodésicas, 16(1), 20–38.
  5. Hoek E (1970). Estimating the stability of excavated slopes in opencast mines. Institution of Mining and Metallurgy A, 105, A132. Hutchinson M F (1989). A new procedure for gridding elevation and stream line data with automatic removal of spurious pits. Journal of Hydrology, 106(3–4), 211–232. DOI: 10.1016/0022-1694(89)90073-5 Jha M K & Kim E (2006). Highway route optimization based on accessibility, proximity, and land-use changes. Journ