Analyzing the implementation level of concurrent engineering in Turkish construction sector

Eşzamanlı mühendislik kavramının Türk inşaat sektöründe uygulanabilirlik düzeyinin irdelenmesi

Pages
67–80
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

By evaluating these findings, suggestions towards removing the above mentioned barriers are presented.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this study, the implementation level of a new management approach, namely Concurrent Engineering (CE), in Turkish Construction Sector is studied.
📊
Key Findings & Data:In this sense, a questionnaire survey has been practiced with the contractor companies in the sector and the results have been analyzed.
💡
Conclusion & Impact:By evaluating these findings, suggestions towards removing the above mentioned barriers are presented.
🔬Design:Survey & Empirical Study
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

In this study, the implementation level of a new management approach, namely Concurrent Engineering (CE), in Turkish Construction Sector is studied. In this sense, a questionnaire survey has been practiced with the contractor companies in the sector and the results have been analyzed. According to the analysis results, the following findings are attained: the new concept is not exactly known in the sector; top management support, personnel training and teamwork are insufficient; the attendance of the actors, who are involved in the project process is lacking in terms of design decisions; and additionally, that the information exchange between the departments is inefficient. These findings create barriers for the common use of CE in the sector. By evaluating these findings, suggestions towards removing the above mentioned barriers are presented.

Özet

Bu çalısmada, “Eszamanlı Mühendislik” (EM) adlı yeni bir yönetim anlayısının Türk Đnsaat Sektörü’ndeki uygulanabilirlik düzeyinin irdelenmesi amaçlanmıstır. Bu amaç doğrultusunda hazırlanan anket, sektörde yer alan yüklenici firmalara uygulanarak sonuçlar analiz edilmistir. Analiz sonuçlarına göre, bu yeni kavramın sektörde tam anlamıyla bilinmediği; üst yönetim desteği, personel eğitimi ve ekip çalısmasının yetersiz olması; proje sürecinde yer alan aktörlerin tasarım kararlarına eksik katılımı ve birimler arası bilgi alısverisinin etkin olmamasının, EM’nin sektörde yaygın kullanılmasına engel teskil ettiği yönünde bulgulara ulasılmıstır. Bu bulgular değerlendirilerek, söz konusu engellerin ortadan kaldırılmasına yönelik öneriler sunulmustur.

🔖

Cite This Article

ÖCAL, M. E., ŞEKERCİ, B. (2008). Analyzing the implementation level of concurrent engineering in Turkish construction sector. Çukurova Üniversitesi Mühendislik-Mimarlik Fakültesi Dergisi, Cilt: 23 - Sayı: 2, 67–80. https://ajindex.com/articles/350379

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (13)

  1. Kamara,J.M., Anumba,C.J., Evbuomwan,N.F.O., “Establishing and Processing Client Requirements-A Key Aspect Concurrent Engineering in Construction”, Engineering, Construction and Architectural Management, 7(1), 15-28, 2000
  2. Kamara,J.M., Anumba,C.J., Evbuomwan,N.F.O., “Assessing the Suitability of Concurrent Briefing Practices in Construction within a Concurrent Engineering Framework”, International Journal of Project Management, 19(6), 337-351, 2001
  3. Anumba,C.J., Baugh,C., Khalfan,M.M.A., “Organizational Structures to Support Concurrent Engineering in Construction”, Industrial Management and Data Systems, 102(5-6), 260-270, 2002
  4. Evbuomwan,N.F.O., Anumba,C.J., “An Integrated Framework for Concurrent Life-Cycle Design and Construction”, Advances in Engineering Software, 29(7-9), 587- 597, 1998
  5. Anumba,C.J., Baron,G., Evbuomwan,N.F.O., “Communication Issues in Concurrent Life-Cycle Design and Construction”, BT Technology Journal, 15(1), 209- 216, 1997
  6. Khalfan,M.M.A., Anumba,C.J., Carillo,P.M., An Investigation of the Readiness of Material Suppliers&Manufacturers for the Implementation of Concurrent Engineering in Construction. COBRA2001 Conference Paper, 2001a
  7. Khalfan,M.M.A., Anumba,C.J., Carillo,P.M., An Investigation of the Readiness of Contractors for the Implementation of Concurrent Engineering in Construction, 2001b
  8. Khalfan,M.M.A., Anumba,C.J., Carillo,P.M., An Investigation of the Readiness of Pakistani Companies for the Implementation of Concurrent Engineering in Construction, 2001c
  9. Khalfan,M.M.A., Anumba,C.J., Carillo,P.M., Development of a Readiness Assessment Model for Concurrent Engineering in Construction. Benchmarking: An International Journal.8 (3), 223-239, 2001d
  10. Love,P., Gunasekaran, A., Li, H., Concurrent Engineering: A Strategy for Procuring Construction Projects. International Journal of Project Management, 16(6), 375-383, 1998
  11. Anumba,C.J., “Concurrent Engineering in Construction Projects”, (C.J.Anumba, J.M.Kamara, A.F.Cutting-Decelle editor).Taylor & Francis, 2007
  12. Khalfan,M.M.A., Anumba,C.J., Siemieniuch,C.E., Sinclair,M.A., Readiness Assessment of the Construction Supply Chain for Concurrent Engineering. European Journal of Purchasing & Supply Management, 7(2), 141-153, 2001
  13. Sekerci,B., Eszamanlı Mühendislik Kavramının Türk Đnsaat Sektöründe Uygulanabilirlik Düzeyinin Đrdelenmesi, Ç.Ü., F.B.E.,Yüksek Lisans Tezi, 2008.