Solving an EPQ model with rework and service level constraint

Pages
75–84
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

First, we prove that the expected overall costs for an imperfect EPQ model with backlogging permitted is less than or equal to that of the one without backlogging.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:This paper examines an economic production quantity (EPQ) model with rework and service level constraint.
📊
Key Findings & Data:First, we prove that the expected overall costs for an imperfect EPQ model with backlogging permitted is less than or equal to that of the one without backlogging.
💡
Conclusion & Impact:Numerical example is provided to demonstrate its practical usage.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

This paper examines an economic production quantity (EPQ) model with rework and service level constraint. First, we prove that the expected overall costs for an imperfect EPQ model with backlogging permitted is less than or equal to that of the one without backlogging. Secondly, the relationship between "imputed backorder cost" and maximal shortage, level is derived for decision-making on whether the required service level is achievable. Then an equation for calculating the intangible backorder cost is proposed for situation when the required service level is not attainable. By including this intangible backorder cost in mathematical analysis, one can derive a new optimal lot-size policy that minimizes expected total costs as well as satisfies the maximal shortage level constraint for the EPQ model with rework. Numerical example is provided to demonstrate its practical usage.

🔖

Cite This Article

CHIU, Y. P., CHIU, S. W., LIN, H. (2006). Solving an EPQ model with rework and service level constraint. Mathematical and Computational Applications, Cilt: 11 - Sayı: 1, 75–84. https://ajindex.com/articles/280117

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (1)

  1. D. Bertsimas and I.C. Paschalidis, Probabilistic service level guarantees in make to stock manufacturing systems. Operations Research. 49, 1, 119-136, 2001. 2.F.Y. Chen and D. Krass, Inventory models with minimal service level constraints. European Journal of Operational Research. 134, 1, 120-140, 2001. 3.T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. HE Tran. 23, 23-28, 1991. 4.Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization. 35, 427-437, 2003. 5.Y.P. Chiu and S.W. Chiu, The finite production model with the reworking of defective items. Int. J. Ind. Eng. - Theory, Appl. & Prac. 12, 1, 15-20, 2005. 6.A.G. de Kok, Approximations for a lost-sales production/inventory control model with service level constraints. Management Science. 31, 6, 729-737, 1985. 7.P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Cont. 12, 584-590, 2001. 8.W.J. Hopp, M.L. Spearman, and R.Q. Zhang, Easily implementable inventory control policies. Operations Research, 45, 3, 327-340, 1997. 9.H.L. Lee and M. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system. Manag. Sci. 33, 1125-1136, 1987. 10.J.J. Liu and P. Yang, Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. Euro. J. Open Res. 91, 517-527, 1996. 11.R. Metters and V. Vargas, A comparison of production scheduling policies on costs,service level, and schedule changes. Production & Operations Management. 8, 1, 76-91, 1999. 12.S. Nahmias, Production & Operations Analysis. McGraw-Hill Co.Inc 203-214, 2001. 13.L-Y Ouyang and K-S. Wu, Mixture inventory model involving variable lead time with a service level constraint Computers & Operations Research.24,9,875-882, 1997. 14.R.L. Rardin, Optimization in Operations Research, Prentice-Hall,Inc.739-741, 1998. 15.M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Tran. 18, 48-55, 1986. 16.H.Schneider, The service level in inventory control systems. Engineering Costs and Production Economics. 4, 341-348, 1979. 17.E.A. Silver, D.F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling. John Wiley & Sons, Inc. 151-172, 1998.