Journals / Mathematical and Computational Applications / 2011 / Cilt: 16 - Sayı: 2

Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period

Pages
329–339
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Numerical example is provided to demonstrate its practical usages.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:This paper is concerned with determination of optimal lot size for an economic production quantity model with scrap and random breakdown occurring in backorder replenishing period.
📊
Key Findings & Data:Random scrap rate is considered in this study, and breakdown is assumed to occur in the backorder filling period.
💡
Conclusion & Impact:Numerical example is provided to demonstrate its practical usages.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

This paper is concerned with determination of optimal lot size for an economic production quantity model with scrap and random breakdown occurring in backorder replenishing period. In most real-life manufacturing systems, generation of defective items and random breakdown of production equipment are inevitable. To deal with the stochastic machine failures, production planners practically calculate the mean time between failures (MTBF) and establish the robust plan accordingly, in terms of optimal lot size that minimizes total production-inventory costs for such an unreliable system. Random scrap rate is considered in this study, and breakdown is assumed to occur in the backorder filling period. Mathematical modeling and analysis is used and the renewal reward theorem is employed to cope with the variable cycle length. An optimal manufacturing lot size that minimizes the long-run average costs for such an imperfect system is derived. Numerical example is provided to demonstrate its practical usages.

🔖

Cite This Article

TİNG, C. K., CHIU, Y. P., CHAN, C. C. H. (2011). Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period. Mathematical and Computational Applications, Cilt: 16 - Sayı: 2, 329–339. https://ajindex.com/articles/279914

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (17)

  1. F.W. Harris, How many parts to make at once. Factory, The Magazine of Management. 10, 135-136, 1913
  2. P.H. Zipkin, Foundations of Inventory Management. McGraw-Hill, New York, 2000
  3. E.A. Silver, D.F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling, John Wiley & Sons, New York, 1998
  4. S. Osteryoung, E. Nosari, D. McCarty and W. J. Reinhart, Use of the EOQ model for inventory analysis. Production and Inventory Management. 27, 39-45, 1986
  5. S. Nahmias, Production & Operations Analysis. 5th Edition, McGraw-Hill, New York, 183-205, 2005
  6. K.L. Cheung and W.H. Hausman, Joint determination of preventive maintenance and safety stocks in an unreliable production environment. Naval Research Logistics. 44(3), 257-272, 1997
  7. A. Arreola-Risa and G.A. DeCroix, Inventory management under random supply disruptions and partial backorders. Naval Research Logistics. 45, 687-703, 1998
  8. F. Chrysostomos and A. Vlachos. Optimal solution of linear machine layout problem using ant colony system. WSEAS Transactions on Information Science & Applications. 2 (6), 652-662, 2005
  9. A. Madureira and J. Santos, Proposal of multi-agent based model for dynamic scheduling in manufacturing. WSEAS Transactions on Information Science & Applications. 2 (5), 600-605, 2005
  10. S.W. Chiu, Optimization problem for EMQ model with backlog level constraint. WSEAS Transactions on Information Science & Applications. 4 (4), 687-692, 2007
  11. Y-S.P. Chiu, F-T. Cheng, and C-K. Ting, Algebraic methods for optimizing EPQ model with rework and scrap. WSEAS Transactions on Systems. 6 (11), 1319-1323, 2007
  12. T. Boone, R. Ganeshan, Y. Guo and J.K. Ord, The impact of imperfect processes on production run times. Decision Sciences, 31(4), 773-785, 2000
  13. T. Bielecki and P.R. Kumar, Optimality of zero-inventory policies for unreliable production facility, Operations Research. 36, 532-541, 1988
  14. T.C.E. Cheng, An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes, IIE Transaction. 23, 23-28, 1991
  15. M. Ben-Daya and M. Hariga, Economic Lot Scheduling Problem with Imperfect Production Processes, Journal of Operational Research Society. 51, 875-881, 2000
  16. H.L. Lee and M.J. Rosenblatt, Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System, Management Science. 33, 1125-1136, 1987
  17. M.J. Rosenblatt and H.L. Lee, Economic Production Cycles with Imperfect