Journals / Mathematical and Computational Applications / 2008 / Cilt: 13 - Sayı: 3

Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair

Pages
137–145
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The expected overall production-inventory costs and the optimal lot sizes for EPQ models with/without rework process are derived and compared.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:This study uses a mathematical method to develop an efficient rule for expediting scrap-or-rework decision making in economic production quantity (EPQ) model with failure-in-repair.
📊
Key Findings & Data:The expected overall production-inventory costs and the optimal lot sizes for EPQ models with/without rework process are derived and compared.
💡
Conclusion & Impact:Numerical example with sensitivity analysis and discussion are provided to demonstrate their practical usages.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

This study uses a mathematical method to develop an efficient rule for expediting scrap-or-rework decision making in economic production quantity (EPQ) model with failure-in-repair. The expected overall production-inventory costs and the optimal lot sizes for EPQ models with/without rework process are derived and compared. With straightforward numerical derivations, this paper develops an efficient rule including the exact critical value of unit repair cost for each reworked item and its approximation equations, to assist in determining whether it is beneficial to rework the repairable items. Numerical example with sensitivity analysis and discussion are provided to demonstrate their practical usages.

🔖

Cite This Article

CHIU, S. W., CHEN, K., CHANG, H. (2008). Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair. Mathematical and Computational Applications, Cilt: 13 - Sayı: 3, 137–145. https://ajindex.com/articles/280055

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (16)

  1. M. Ben-Daya, The Economic Production Lot-Sizing Problem with Imperfect Production Processes and Imperfect Maintenance, International Journal of Production Economics. 76, 257-264, 2002
  2. T.C.E. Cheng, An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes, IIE Transaction. 23, 23-28, 1991
  3. S.W. Chiu, Y.P. Chiu, and B.P. Wu, An Economic Production Quantity Model with the Steady Production Rate of Scrap Items, Journal of the Chaoyang University of Technology. 8, 1, 225-235, 2003
  4. S.W. Chiu and D.C. Gong, Determining the Optimal Lot Size for the Finite Production Model with an Imperfect Rework Process of Defective Items, Journal of Information and Optimization Science. 24, 3, 105-119, 2003
  5. Y-S.P. Chiu, S.W. Chiu, and H.D. Lin, Solving an EPQ Model with Rework and Service Level Constraint. Mathematical and Computational Applications, 11, 1, 75-84, 2006
  6. S.W. Chiu and Y-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research. 65, 6, 499-506, 2006
  7. K.J. Chung, Bounds for Production Lot Sizing with Machine Breakdown, Computers and Industrial Engineering. 32, 139-144, 1997
  8. P.A. Hayek and M.K. Salameh, Production Lot Sizing with the Reworking of Imperfect Quality Items Produced, Production Planning and Control. 12, 6, 584-590, 2001
  9. H.L. Lee and M.J. Rosenblatt, Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System, Management Science. 33, 1125-1136, 1987
  10. J.J. Liu and P. Yang, Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research. 91, 517-527, 1996
  11. S. Nahmias, Production & Operations Analysis. McGraw-Hill Co. Inc., 2005
  12. J.S. Osteryoung, E. Nosari, D.E. McCarty, and W.J. Reinhart, Use of the EOQ Model for Inventory Analysis, Production and Inventory Management. 27, 39-45, 1986
  13. M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Transaction. 18, 48-55, 1986
  14. E.A. Silver, D.F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling. John Wiley & Sons, Inc. 151-172, 1998
  15. R.J. Tersine, Principles of Inventory and Materials Management. 4th Ed., PTR Prentice-Hall, 1994
  16. X. Zhang and Y. Gerchak, Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield, IIE Transaction. 22, 41-47