Journals / Mathematical and Computational Applications / 2010 / Cilt: 15 - Sayı: 3

An algebraic approach for determinig the optimal lot size for EPQ model with rework process

Pages
364–370
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

As a result, it may enable the practitioners or students who with little knowledge of calculus to understand or handle with ease the realistic production systems.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:This paper presents a simple algebraic approach for deriving the optimal lot size for economic production quantity (EPQ) model with rework process.
📊
Key Findings & Data:We demonstrate that optimal lot size and optimal production-inventory cost for such an imperfect EPQ model can be derived without derivatives.
💡
Conclusion & Impact:As a result, it may enable the practitioners or students who with little knowledge of calculus to understand or handle with ease the realistic production systems.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

This paper presents a simple algebraic approach for deriving the optimal lot size for economic production quantity (EPQ) model with rework process. Conventional methods for solving lot size problems are by using differential calculus on the long-run average production-inventory cost function with the need to prove optimality first. A few recent articles proposed the algebraic approach to the solution of classic economic order quantity (EOQ) and EPQ model without reference to the use of derivatives. This paper extends it to an EPQ model with reworking of defective items. We demonstrate that optimal lot size and optimal production-inventory cost for such an imperfect EPQ model can be derived without derivatives. As a result, it may enable the practitioners or students who with little knowledge of calculus to understand or handle with ease the realistic production systems.

🔖

Cite This Article

CHIU, S. W., CHENG, C. B., WU, M. F., YANG, J. C. (2010). An algebraic approach for determinig the optimal lot size for EPQ model with rework process. Mathematical and Computational Applications, Cilt: 15 - Sayı: 3, 364–370. https://ajindex.com/articles/280033

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (16)

  1. F. W. Harris, How many parts to make at once, Factory, The Magazine of Management, 10, 135-136, 1913
  2. F. S. Hillier and G. J. Lieberman, Introduction to Operations Research, 7th Ed., McGraw Hill, New York, 2001
  3. S. Nahmias, Production and Operations Analysis, 5th Ed., McGraw Hill, New York, 2005
  4. E. A. Silver, D. F. Pyke, and R. Peterson, Inventory Management and Production Planning and Scheduling, John Wiley & Sons, New York, 1998
  5. M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production processes, IIE Transaction, 18, 48-55, 1986
  6. X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in and EOQ model with random yield, IIE Transaction, 22, 41-47, 1990
  7. Y-S. P. Chiu, S. W. Chiu, and H-D. Lin, Solving an EPQ model with rework and service level constraint, Mathematical & Computational Applications, 11, 75-84, 2006
  8. P. A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced, Production Planning and Control, 12, 584-590, 2001
  9. S. W. Chiu, K-K. Chen, and H-H. Chang, Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair”, Mathematical and Computational Applications, 13, 137-145, 2008
  10. A. M. M. Jamal, B. R. Sarker, and S. Mondal, Optimal manufacturing batch size with rework process at a single- stage production system, Computers and Industrial Engineering, 47, 77-89, 2004
  11. Y-S. P. Chiu, C-Y. Tseng, W-C. Liu, and C-K. Ting, Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy, P I Mech Eng B- Journal of Engineering Manufacture, 223, 183-194, 2009
  12. Y-S. P. Chiu and C-K. Ting, A note on ‘Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns’, European Journal of Operational Research, 201, 641-643, 2010
  13. T. C. E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transaction, 23, 23-28, 1991
  14. Y-S. P. Chiu, S. W. Chiu, C-Y. Li, and C-K. Ting, Incorporating multi-delivery policy and quality assurance into economic production lot size problem, Journal of Scientific & Industrial Research, 68, 505-512, 2009
  15. Y-S. P. Chiu and S. W. Chiu, The finite production model with the reworking of defective items. International Journal of Industrial Engineering, 12, 15-20, 2005
  16. R. W. Grubbström and A. Erdem, The EOQ with backlogging