Journals / El-Cezeri / 2020 / Cilt: 7 - Sayı: 2

Solution of the Distributed Permutated Flow Shop Scheduling Problems and Artificial Bee Colony Algorithm

Dağıtık Permütasyon Akış Tipi Çizelgeleme Problemlerinin Yapay Arı Koloni Algoritması İle Çözümü

Journal
El-Cezeri
Pages
549–562
Publication Date
2020-05-31
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The algorithm has been compared to 14 intuitive and has presented the best results.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this study, distributed permutation flow type scheduling problems, whose purpose function is minimization of maximum completion time, are discussed.
📊
Key Findings & Data:The difference of this problem from the classical flow-type scheduling problem is that jobs are distributed across multiple factories.
💡
Conclusion & Impact:The algorithm has been compared to 14 intuitive and has presented the best results.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Dağıtık permütasyon akış tipi çizelgeleme · yapay arı kolonisi algoritması · NEH sezgiseli

Abstract

In this study, distributed permutation flow type scheduling problems, whose purpose function is minimization of maximum completion time, are discussed. The difference of this problem from the classical flow-type scheduling problem is that jobs are distributed across multiple factories. Artificial bee colony algorithm, based on the foraging behavior of bees in the nature, was used to solve the problem. The NEH (Nawaz Enscore Ham) intuition has been used to produce the initial solutions of the algorithm. In the phases of the algorithm (worker, observer and explorer bee phase), the displacement method is used for neighboring solutions. In this method, different jobs were obtained by changing the positions of two randomly selected jobs. The success of the algorithm on the problem has been measured in the literature using Taillard's small and large test problems. The algorithm has been compared to 14 intuitive and has presented the best results.

Özet

Bu çalışmada amaç fonksiyonu minimum tamamlanma süresi olan dağıtık permütasyon akış tipi çizelgeleme problemleri ele alınmıştır. Bu problemin klasik akış tipi çizelgeleme probleminden farkı, işlerin birden fazla fabrikaya dağıtılmasıdır. Problemin çözümünde doğadaki arıların besin arama davranışını temel alan yapay arı koloni algoritması kullanılmıştır. Algoritmanın başlangıç çözümleri üretmesinde NEH sezgiselinden yararlanılmıştır. Algoritmanın evrelerinde, (işçi, gözlemci ve kâşif arı evresi) komşu çözümler için yer değiştirme metodu kullanılmıştır. Bu metotta rastgele seçilen iki işin yerleri değiştirilerek farklı iş sıraları elde edilmiştir. Algoritmanın problem üzerindeki başarısı literatürde iyi bilinin Taillard’ın küçük ve büyük boyutlu test problemleri kullanılarak gösterilmiştir. Algoritma, 14 adet sezgisel ile karşılaştırılmıştır ve en iyi sonuçları sunmuştur.

🔖

Cite This Article

KÜPELİ, İ., SARUCAN, A., KÜPELİ, A. S. (2020). Solution of the Distributed Permutated Flow Shop Scheduling Problems and Artificial Bee Colony Algorithm. El-Cezeri, Cilt: 7 - Sayı: 2, 549–562. https://ajindex.com/articles/252550

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (12)

  1. Ruiz, R., Q.-K. Pan, and B. Naderi, Iterated Greedy methods for the distributed permutation flowshop scheduling problem. Omega, 2019. 83: p. 213-222
  2. Arseven, İ. and A. Sarucan, Dağıtık Permütasyonlu Akış Tipi Çizelgeleme Problemlerinin Çözümü İçin Bir Yapay Arı Koloni Algoritması, in 6. Uluslararası GAP Mühendislik Kongresi. 2019: Şanlıurfa. p. 172-175
  3. Ling-Fang, C., W. Ling, and W. Jing-jing, A Two-Stage Memetic Algorithm for Distributed No-Idle Permutation Flowshop Scheduling Problem, in 2018 37th Chinese Control Conference (CCC). 2018. p. 2278-2283
  4. Pan, J.-Q., W.-Q. Zou, and J.-H. Duan, A Discrete Artificial Bee Colony for Distributed Permutation Flowshop Scheduling Problem with Total Flow Time Minimization, in 2018 37th Chinese Control Conference (CCC). 2018: China. p. 8379-8383
  5. Fernandez-Viagas, V., P. Perez-Gonzalez, and J.M. Framinan, The distributed permutation flow shop to minimise the total flowtime. Computers & Industrial Engineering, 2018. 118: p. 464-477
  6. Wang, K., Y. Huang, and H. Qin, A fuzzy logic-based hybrid estimation of distribution algorithm for distributed permutation flowshop scheduling problems under machine breakdown. Journal of the Operational Research Society, 2017. 67(1): p. 68-82
  7. Wang, K., et al., Variable neighborhood based memetic algorithm for Just-in-Time distributed assembly permutation flowshop scheduling, in 2017 IEEE International Conference on Systems, Man, and Cybernetics (SMC). 2017. p. 3700-3704
  8. Deng, J. and L. Wang, A competitive memetic algorithm for multi-objective distributed permutation flow shop scheduling problem. Swarm and Evolutionary Computation, 2017. 32: p. 121-131
  9. Shao, W., D. Pi, and Z. Shao, Optimization of makespan for the distributed no-wait flow shop scheduling problem with iterated greedy algorithms. Knowledge-Based Systems, 2017. 137: p. 163-181
  10. Ying, K.-C., et al., Iterated reference greedy algorithm for solving distributed no-idle permutation flowshop scheduling problems. Computers & Industrial Engineering, 2017. 110: p. 413-423
  11. Duan, W., et al., EDA based probabilistic Memetic Algorithm for distributed blocking permutation flowshop scheduling with sequence dependent setup time, in 2017 IEEE Congress on Evolutionary Computation (CEC). 2017, IEEE. p. 992-999
  12. Bargaoui, H., O. Belkahla Driss, and K. Ghédira, A novel chemical reaction optimization for the distributed permutation flowshop scheduling problem with makespan criterion. Compute