ENERGY CONSUMPTION MANAGEMENT IN TEXTILE FINISHING PLANTS: A COST EFFECTIVE AND SEQUENCE DEPENDENT SCHEDULING MODEL

TEKSTİL TERBİYE TESİSLERİNDE ENERJİ TÜKETİMİ YÖNETİMİ: MALİYETE DUYARLI VE SIRALAMAYA BAĞLI BİR ÇİZELGELEME MODELİ

Pages
—
Publication Date
2017-06-30
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The capability of the  developed model is evaluated with actual manufacturing data.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:This study focuses on managing energy consumption and reducing energy costs in textile finishing plants with an effective  scheduling approach, which consists of sequence dependent set-up times, sequence dependent set-up energy usages and time-of-use  energy tariff.
📊
Key Findings & Data:The finishing plants are typical examples of the flexible job shops.
💡
Conclusion & Impact:The capability of the  developed model is evaluated with actual manufacturing data.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Textile finishing · flexible job shop scheduling · sequence dependent set-ups

Abstract

This study focuses on managing energy consumption and reducing energy costs in textile finishing plants with an effective  scheduling approach, which consists of sequence dependent set-up times, sequence dependent set-up energy usages and time-of-use  energy tariff. The finishing plants are typical examples of the flexible job shops. Therefore, a novel energy saving mixed-integer linear  programming model is proposed for the sequence dependent flexible job shop scheduling problems in this study. The proposed model  comprises an extended cost function that has a quaternary structure for tackling actual scheduling problems. The capability of the  developed model is evaluated with actual manufacturing data.

Özet

Bu çalışmada tekstil terbiye işletmelerinde, etkin bir çizelgeleme yaklaşımıyla, enerji tüketimi yönetiminin sağlanması ve enerji  maliyetlerinin azaltılması amaçlanmaktadır. Bu çizelgeleme yaklaşımında, sıralamaya bağlı hazırlık işlemleri süreleri, sıralamaya bağlı  hazırlık işlemleri enerji tüketimleri ve zamana bağlı elektrik enerjisi tarifesi bir bütün halinde ele alınmaktadır. Tekstil terbiye  işletmeleri, esnek atölye tipi üretim ortamlarının tipik örnekleridir. Bu yüzden, yapılan çalışmada sıralamaya bağlı esnek atölye tipi  üretim ortamları için yeni bir enerji tasarruflu, karma tam sayılı doğrusal programlama modeli önerilmektedir. Önerilen model aktüel  çizelgeleme problemlerini karşılayabilen dört bileşenli bir maliyet fonksiyonunu içermekte olup, modelin yeterliliği gerçek zamanlı  üretim verileriyle sınanmıştır.

🔖

Cite This Article

Karacızmelı, İ. H., Ogulata, S. N. (2017). ENERGY CONSUMPTION MANAGEMENT IN TEXTILE FINISHING PLANTS: A COST EFFECTIVE AND SEQUENCE DEPENDENT SCHEDULING MODEL. Textile and Apparel, Volume: 27 Issue: 2. https://ajindex.com/articles/1640262

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (31)

  1. https://www.dews.qld.gov.au/electricity/prices/tariffs (Accessed 11.12.2016)
  2. http://www.energy.gov.on.ca/en/smart-meters-and-tou-prices/ (Accessed 11.12.2016)
  3. http://www.dgfez.net/eng/page.php?mnu_uid=492 (Accessed 11.12.2016)
  4. http://www.tedas.gov.tr/#!tedas_tarifeler (Accessed 11.12.2016)
  5. Mouzon G., 2008. "Operational Methods and Models for Minimization of Energy Consumption in a Manufacturing Environment", PhD diss., Wichita State University.
  6. Liu G., Zhang B., Yang H. and et al., 2013. "A Branch-and-Bound algorithm for minimizing the energy consumption in the PFS problem", Hindawi Publishing Corporation Mathematical Problems in Engineering, Article ID: 546810. doi: 10.1155/2013/546810.
  7. Luo H., Du B., Huang G.Q. and et al., 2013. "Hybrid flow shop scheduling considering machine electricity consumption cost", International Journal of Production Economics, 146, 423–439.
  8. Gong X., De Pessemier T., Joseph W. and et al., 2016. "A generic method for energy-efficient and energy-cost-effective production at the unit process level", Journal of Cleaner Production, 113, 508-522.
  9. Liu Y., Dong H., Lohse N. and et al., 2014. "An investigation into minimising total energy consumption and total weighted tardiness in job shops", Journal of Cleaner Production, 65, 87–96.
  10. Dai M., Tang D., Zhang H. and et al., 2014. "Energy-aware scheduling model and optimization for a flexible flow shop problem", 26th Chinese Control and Decision Conference (CCDC), 323-328.
  11. Pinedo M.L., 2005. "Planning and Scheduling in Manufacturing and Services", Springer, ISBN 0387221980.
  12. Allahverdi A., Gupta J.N.D., Aldowaisan T., 1999. "A review of scheduling research involving set-up considerations", Omega, The International Journal of Management Science, 27, 219–239.
  13. Hershauer J.C., 1970. "An empirically-derived simulation to explore sequencing decision", PhD diss., Indiana University.
  14. Flynn B.B., 1984. "Group technology vs. process layout: a comparison using computerized job shop simulation", PhD diss., Indiana University.
  15. Patterson M.C., 1993. "Analysis of set-up time at constraint resources", International Journal of Production Research, 31 (4), 845–849.
  16. Kim S.C., Bobrowski P.M., 1994. "Impact of sequence-dependent set-up times on job shop scheduling performance", International Journal of Production Research, 32 (1), 503–520.
  17. Karacizmeli I.H., Ogulata S.N., 2014. "Energy conservation approaches on production scheduling: a comparative research for textile industry", In Proceedings of the 14th AUTEX World Textile Conference ISBN:978-605-63112-4-6.
  18. Ahmed P., Tavakkoli-Moghaddem R., Jolai F. and et al., 2004. "Solving stochastic job shop scheduling problems by a hybrid method", University of Wolverhampton Working Paper Series, ISSN 1363-6839.
  19. Akkaya G., Gokcen and T., 2006. "Job shop scheduling design with artificial neural networks", Sigma Journal of Engineering and Natural Sciences, 4, 121–130.
  20. Imanipour N., 2006. "Modeling & Solving flexible job shop problem with sequence dependent setup times", International Conference on Service Systems and Service Management, 1205-1210.
  21. Saidi-Mehrabad M., Fattahi P., 2007. "Flexible job shop scheduling with tabu search algorithms", International Journal of Advanced Manufacturing Technology, 32, 563–570.doi:10.1007/s00170-005-0375-4
  22. Zhang G., Shao X., Li P., Gao L., 2009. "An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem", Computers & Industrial Engineering, 56 (4), 1309-1318.
  23. Yu J.M., Kim J.S., Lee D.H., 2011. "Scheduling algorithms to minimise the total family flow time for job shops with job families", International Journal of Production Research, 49 (22), 6885–6903.
  24. Galmohammadi D., 2013. "A neural network decision-making model for job-shop scheduling", International Journal of Production Research, 51 (17), 5142–5157. doi: 10.1080/00207543.2013.793476.
  25. Gomes M.C., Barbosa-Póvoa A.P., Novais A.Q., 2013. "Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach", International Journal of Production Research, 51 (17), 5120–5141. doi: 10.1080/00207543.2013.793428.
  26. Mousakhani M., 2013. "Sequence-dependent set-up time flexible job shop scheduling problem to minimize total tardiness", International Journal of Production Research, 51 (12), 3476–3487. doi: 10.1080/00207543.2012.746480.
  27. Roshanaei V., Azab A., ElMaraghy H., 2013. "Mathematical modelling and a meta-heuristic for flexible job shop scheduling", International Journal of Production Research, 51 (20), 6247–6274. doi: 10.1080/00207543.2013.827806.
  28. Kulkarni K., Venkateswaran J., 2014. "Iterative simulation and optimization approach for job shop scheduling", WSC '14 Proceedings of the 2014 Winter Simulation Conference, 1620-1631.
  29. Zhang Q., Manier H., Manier M., 2014. "A modified shifting bottleneck heuristic and disjunctive graph for job shop scheduling problems with transportation constraints", International Journal of Production Research, 52 (4), 985–1002. doi: 10.1080/00207543.2013.828164.
  30. Allahverdi A., Ng C.T., Cheng T.C.E., Kovalyov M.Y., 2008. "A survey of scheduling problems with set-up times or costs", European Journal of Operational Research, 187 (3), 985–1032.
  31. Karacizmeli I.H., Ogulata S.N., 2016. "Energy conservation approaches on production scheduling: a new mathematical model for textile industry ", In Proceedings of the 16th AUTEX World Textile Conference, Section 7-18, 1-5. ISBN: 978-961-6900-17-1.