AI Summary & Key Takeaways
AI InsightThe LEC, which is calculated by assuming that the economic life of the plant is 20 years and caused by the deviation in the boiler efficiency, shows that the difference can reach 100 million USD.
📌 3 Key Takeaways
Abstract
In this study, thermo-economic analysis was performed using data obtained from the SR EPOS (Energy Optimization System) system of the Afşin–Elbistan B Thermal Power Plant. The levelized electricity cost (LEC) of the plant was calculated over three different scenarios and the differences between the efficiency calculated based on the design values of the boiler and the efficiencies determined by the actual data obtained from the EPOS system were compared with the reference efficiency provided by the manufacturer. As a result of this comparison, the effect of the efficiency differences on the LEC was analyzed. The LEC, which is calculated by assuming that the economic life of the plant is 20 years and caused by the deviation in the boiler efficiency, shows that the difference can reach 100 million USD.
Özet
Bu çalışmada, Afşin–Elbistan B Termik Santralinde tesisin olan SR EPOS (Energy Optimization System) sisteminden elde edilen veriler kullanılarak termo-ekonomik analiz gerçekleştirilmiştir. Tesisin seviyelendirilmiş elektrik maliyeti (SEM), üç farklı senaryo üzerinden hesaplanmış ve kazanın tasarım değerlerine dayalı olarak hesaplanan verim ile EPOS sisteminden elde edilen gerçek verilerle belirlenen verimler arasındaki farklar, üretici tarafından sağlanan referans verim ile karşılaştırılmıştır. Bu karşılaştırma sonucunda, verim farklılıklarının SEM üzerindeki etkisi analiz edilmiştir. Kazan verimindeki sapmadan kaynaklanan ve tesisin ekonomik ömrünün 20 yıl olduğu kabulüyle hesaplanan SEM farkın 100 milyon USD seviyelerine ulaşabildiğini göstermektedir.