Effective Project Team Organization in Project Management Practices

Proje Yönetimi Uygulamalarında Etkili Proje Ekibi Organizasyonu

Pages
45–62
Publication Date
2019-12-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The elements facilitating team communication are listed as effective variables essential for the success of project delivery.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The study focuses on architecture practice and the tensions that arise within the profession as a result of a variety of systems of performance.
📊
Key Findings & Data:The problem arises from a lack of organization and the need for project management in architecture as a result of the increase in interrelated tasks assigned for the architect to deal with and the complexity of architecture projects in hand.
💡
Conclusion & Impact:The elements facilitating team communication are listed as effective variables essential for the success of project delivery.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Proje yönetimi · yapım · takım organizasyonu

Abstract

The study focuses on architecture practice and the tensions that arise within the profession as a result of a variety of systems of performance. Particularly it gives attention to the weak collaboration between the design-construction phases that are composed of several sequential steps called the project process. The problem arises from a lack of organization and the need for project management in architecture as a result of the increase in interrelated tasks assigned for the architect to deal with and the complexity of architecture projects in hand. These organized jobs require a number of expertise working together who might not have same interests to share common goals. The study covers the importance and significance of project management in the construction industry and analyzes the problems in managing architecture projects raising potential conflicts in communication and stressing on weak collaboration in the architecture engineering construction industry (AEC industry). The research highlights the importance of project team organization in the success of project delivery and determines the means and tools of successful communication for that purpose. The elements facilitating team communication are listed as effective variables essential for the success of project delivery.

Özet

Çalışma, mimarlık pratiği ve çeşitli performans sistemlerinin sonucu olarak meslek içinde ortaya çıkan gerginliklere odaklanmaktadır. Özellikle proje süreci olarak adlandırılan birkaç ardışık adımlardan oluşan tasarım-inşaat aşamaları arasındaki zayıf işbirliğine dikkat verir. Sorun, mimarın başa çıkabilmek için verdiği birbiriyle bağlantılı görevlerin artması ve mimari projelerin eldeki karmaşıklığı sonucunda organizasyon eksikliği ve mimaride proje yönetimine duyulan ihtiyaçtan kaynaklanmaktadır. Bu organize işler, ortak hedefleri paylaşmak için aynı ilgi alanlarına sahip olmayan birlikte çalışan bir dizi uzmanlık gerektirir.

🔖

Cite This Article

KHOURY, K. B. (2019). Effective Project Team Organization in Project Management Practices. A+Arch Design International Journal of Architecture and Design, Cilt: 5 - Sayı: 2, 45–62. https://ajindex.com/articles/121142

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (14)

  1. Cheung, S.-O., Lam, T.-I., Leung, M.-Y., Wan, Y.-W. (2001). An analytical hierarchy process based procurement selection method. Construction Management and Economics 19 (4), 427–437
  2. Ai Lin Teo, E., Ling, F.Y., Chong, A. (2005). Framework for project managers to manage construction safety. International Journal of Project Management 23 (4), 329–341
  3. Dubois and Gadde (2002). The Construction Industry as a loosely coupled system. Implications for productivity and innovativity
  4. Assaf, S.A., Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management 24 (4), 349–357. [5] (International Journal of Information Technology and Decision Making 2012
  5. Fernie, S., Thorpe, A. (2007). Exploring change in construction: supply chain management. Engineering, Construction and Architectural Management 14 (4), 319–333
  6. Dubois, A., & Gadde, L. E. (2000). Supply strategy and network effects—purchasing behaviour in the construction industry. European journal of purchasing & supply management, 6(3-4), 207-215
  7. Green, S. (2002). The human resource management implications of lean construction: critical perspectives and conceptual chasms. Journal of Construction Research 3 (1), 147–165
  8. Blyth, K., Lewis, J., Kaka, A. (2004)."Developing a framework for a standardized works programme for building projects", Construction Innovation, Vol. 4 No.4, pp.193
  9. Brown et al. (2001). "The facilities management role in new building procurement", Facilities, Vol. 9 No.3/4, pp.119
  10. World Bank (1996). World Bank Survey of International Construction Projects, World Bank, London, [12] Zwikael, O., Shimizu, K., Globerson, S. (2005), "Cultural differences in project management processes: a field study", International Journal of Project Management, Vol. 23 No.6, pp.454-62
  11. Kerzner, H. (2006). Project Management: A Systems Approach to Planning, Scheduling and Controlling, 9th ed., Wiley, New York, NY
  12. Turner, J.R. (1999), The Handbook of Project-based Management: Improving the Processes for Achieving Strategic Objectives, McGraw-Hill, London
  13. Lo, T.Y., Fung, I.W.H., Tung, K.C.F. (2006). Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management 132 (6), 636–649
  14. Mansfield, N.R., Ugwu, O.O., Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management 12 (4), 254–260. [17]