Journals / Journal of Transportation and Logistics / 2026 / Volume: 9 Issue: 1

Mathematical Modelling Approaches for Integrated Single Machine Scheduling and Electric Vehicle Routing Problem

İclal Bağcı(IZMIR DEMOCRACY UNIVERSITY, FACULTY OF ENGINEERING, DEPARTMENT OF INDUSTRIAL ENGINEERING)0009-0000-7207-3047
Hande Öztop(IZMIR DEMOCRACY UNIVERSITY, FACULTY OF ENGINEERING, DEPARTMENT OF INDUSTRIAL ENGINEERING)0000-0002-6503-7299
Zeynel Abidin Çil(IZMIR DEMOCRACY UNIVERSITY, FACULTY OF ENGINEERING, DEPARTMENT OF INDUSTRIAL ENGINEERING)0000-0002-7270-9321
Pages
—
Publication Date
2024-05-17
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Numerical results indicate that the CP model has superior performance than the MILP model for the problem.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In recent years, increasingCO2 emissions and resource utilization has adversely affected the environment.
📊
Key Findings & Data:Sustainability efforts have been initiated to decrease these effects, including environmentally friendly electric vehicles in vehicle fleets used for transportation.
💡
Conclusion & Impact:Numerical results indicate that the CP model has superior performance than the MILP model for the problem.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Electric vehicle routing · single machine scheduling · mixed-integer linear programming

Abstract

In recent years, increasingCO2 emissions and resource utilization has adversely affected the environment. Sustainability efforts have been initiated to decrease these effects, including environmentally friendly electric vehicles in vehicle fleets used for transportation. The electric vehicle routing problem (EVRP) has emerged in the literature, and numerous studies have been conducted, considering specific constraints related to electric vehicles. Due to various charging feature constraints, EVRP diverges from the classical vehicle routing problem (VRP) and becomes more complex. In addition to the load capacity constraints of classical VRP, electric vehicles must deliver products to customers via an optimal vehicle route while considering battery capacity limitations. This study addresses the integrated single-machine scheduling and electric vehicle routing problem. After scheduling and processing customer product requests on a single machine, electric vehicle routes must be created to deliver these products to customers. To meet customer expectations, the objective function of the problem aims to minimize the costs associated with customer product delivery delays. Two mathematical models, i.e., mixed-integer linear programming (MILP) and constraint programming (CP) models, are presented to solve this problem. The results and performances of these models are compared on a set of instances. Numerical results indicate that the CP model has superior performance than the MILP model for the problem.

🔖

Cite This Article

Bağcı, İ., Öztop, H., Çil, Z. A. (2024). Mathematical Modelling Approaches for Integrated Single Machine Scheduling and Electric Vehicle Routing Problem. Journal of Transportation and Logistics, Volume: 9 Issue: 1. https://doi.org/10.26650/JTL.2024.1414907

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (36)

  1. Berghman, L., Kergosien, Y., & Billaut, J. C. (2023). A review on integrated scheduling and outbound vehicle routing problems. European Journal of Operational Research. google scholar
  2. Booth, K. E., & Beck, J. C. (2019). A constraint programming approach to electric vehicle routing with time windows. In Integration of Constraint Programming, Artificial Intelligence, and Operations Research: 16th International Conference, CPAIOR 2019, Thessaloniki, Greece, June 4-7, 2019, Proceedings 16 (pp. 129-145). Springer International Publishing. google scholar
  3. Bruglieri, M., Pezzella, F., Pisacane, O., & Suraci, S. (2015). A variable neighborhood search branching for the electric vehicle routing problem with time windows. Electronic Notes in Discrete Mathematics, 47, 221-228. google scholar
  4. Chen, H. K., Hsueh, C. F., & Chang, M. S. (2009). Production scheduling and vehicle routing with time windows for perishable food products. Computers & operations research, 36(7), 2311-2319. google scholar
  5. Dataset (2024). google scholar
  6. Devapriya, P., Ferrell, W., & Geismar, N. (2017). Integrated production and distribution scheduling with a perishable product. European Journal of Operational Research, 259(3), 906-916. google scholar
  7. Farahani, P., Grunow, M., & Günther, H. O. (2012). Integrated production and distribution planning for perishable food products. Flexible services and manufacturing journal, 24, 28-51. google scholar
  8. Felipe, Â., Ortuno, M. T., Righini, G., & Tirado, G. (2014). A heuristic approach for the green vehicle routing problem withmultiple technologies and partial recharges. Transportation Research Part E: Logistics and Transportation Review, 71, 111-128. google scholar
  9. Fu, L. L., Aloulou, M. A., & Triki, C. (2017). Integrated production scheduling and vehicle routing problem with job splitting and delivery time windows. International Journal of Production Research, 55(20), 5942-5957. google scholar
  10. Goeke, D. (2019). Granular tabu search for the pickup and delivery problem with time windows and electric vehicles. European Journal of Operational Research, 278(3), 821-836. google scholar
  11. Ha, M. H., Nguyen, T. D., Duy, T. N., Pham, H. G., Do, T., & Rousseau, L. M. (2020). A new constraint programming model and a linear programming-based adaptive large neighborhood search for the vehicle routing problem with synchronization constraints. Computers & Operations Research, 124, 105085. google scholar
  12. He, P., Li, K., & Kumar, P. R. (2022). An enhanced branch-and-price algorithm for the integrated production and transportation scheduling problem. International Journal of Production Research, 60(6), 1874-1889. google scholar
  13. Hojabri, H., Gendreau, M., Potvin, J. Y., & Rousseau, L. M. (2018). Large neighborhood search with constraint programming for a vehicle routing problem with synchronization constraints. Computers & Operations Research, 92, 87-97. google scholar
  14. Jamili, N., Ranjbar, M., & Salari, M. (2016). A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions. Journal of Manufacturing Systems, 40, 105-118. google scholar
  15. Keskin, M., & Çatay, B. (2016). Partial recharge strategies for the electric vehicle routing problem with time windows. Transportation research part C: emerging technologies, 65, 111-127. google scholar
  16. Koulamas, C. (2010). The single-machine total tardiness scheduling problem: Review and extensions. European Journal of Operational Research, 202(1), 1-7. google scholar
  17. Küçükoğlu, İ., & Öztürk, N. (2016). Heterojen Filoya Sahip Elektrikli Araçların Rota Optimizasyonu. Celal Bayar Üniversitesi Fen Bilimleri Dergisi, 12(3), 525-534. google scholar
  18. Kucukoglu, I., Dewil, R., & Cattrysse, D. (2021). The electric vehicle routing problem and its variations: A literature review. Computers & Industrial Engineering, 161, 107650. google scholar
  19. Lam, E., Desaulniers, G., & Stuckey, P. J. (2022). Branch-and-cut-and-price for the electric vehicle routing problem with time windows, piecewise-linear recharging, and capacitated recharging stations. Computers & Operations Research, 145, 105870. google scholar
  20. Li, K., Zhou, C., Leung, J. Y., & Ma, Y. (2016). Integrated production and delivery with single machine and multiple vehicles. Expert Systems with Applications, 57, 12-20. google scholar
  21. Liao, C. J., & Juan, H. C. (2007). An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups. Computers & operations research, 34(7), 1899-1909. google scholar
  22. Long, J., Pardalos, P. M., & Li, C. (2022). Level-based multi-objective particle swarm optimizer for integrated production scheduling and vehicle routing decision with inventory holding, delivery, and tardiness costs. International Journal of Production Research, 60(11), 3319-3338. google scholar
  23. Low, C., Chang, C. M., Li, R. K., & Huang, C. L. (2014). Coordination of production scheduling and delivery problems with heterogeneous fleet. International Journal of Production Economics, 153, 139-148. google scholar
  24. Luo, X., & Chu, F. (2006). A branch and bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing total tardiness. Applied Mathematics and Computation, 183(1), 575-588. google scholar
  25. Mohammadi, S., Al-e-Hashem, S. M., & Rekik, Y. (2020). An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company. International Journal of Production Economics, 219, 347-359. google scholar
  26. Moons, S., Ramaekers, K., Caris, A., & Arda, Y. (2017). Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion. Computers & Industrial Engineering, 104, 224-245. google scholar
  27. Ozcelik, F., Ertem, M., & Saraç, T. (2022). A stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costs. Engineering Optimization, 54(7), 1178-1192. google scholar
  28. Öztop, H. (2022, October). A Constraint Programming Model for the Open Vehicle Routing Problem with Heterogeneous Vehicle Fleet. In The International Symposium for Production Research (pp. 345-356). Cham: Springer International Publishing. google scholar
  29. Öztop, H., Kizilay, D., & Çil, Z. A. (2021). Mathematical models for the periodic vehicle routing problem with time windows and time spread constraints. An International Journal of Optimization and Control: Theories & Applications (IJOCTA), 11(1), 10-23. google scholar
  30. Schneider, M., Stenger, A., & Goeke, D. (2014). The electric vehicle-routing problem with time windows and recharging stations. Transportation Science, 48(4), 500-520. google scholar
  31. Tanaka, S., & Araki, M. (2013). An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times. Computers & Operations Research, 40(1), 344-352. google scholar
  32. Ullrich, C. A. (2013). Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research, 227(1), 152-165. google scholar
  33. Wang, J., Yao, S., Sheng, J., & Yang, H. (2019). Minimizing total carbon emissions in an integrated machine scheduling and vehicle routing problem. Journal of Cleaner Production, 229, 1004-1017. google scholar
  34. Yüksel, D., Kizilay, D., Öztop, H., & Özkan, S. (2021). Mathematical models for milk dispatching problem. Journal of Transportation and Logistics, 6(2), 217-235. google scholar
  35. Zhao, M., & Lu, Y. (2019). A heuristic approach for a real-world electric vehicle routing problem. Algorithms, 12(2), 45. google scholar
  36. Zhao, Z., Li, X., & Zhou, X. (2020). Distribution route optimization for electric vehicles in urban cold chain logistics for fresh products under time-varying traffic conditions. Mathematical Problems in Engineering, 2020, 1-17. google scholar