Objective & Hypothesis:In this article, the necessity of a Standard method is described briefly for the estimation of bid tender prices for the construction projects.
📊
Key Findings & Data:In this article, the necessity of a Standard method is described briefly for the estimation of bid tender prices for the construction projects.
💡
Conclusion & Impact:Material retjuirements lists or BOM (Bili of materials approach is extremely useful for this purpose
🔬Design:Araştırma Makalesi
📍Scope:Comprehensive Sample
⚙️Variables:teklif bedeli · teklif bedeli hesaplanması · inşaat yapım projeleri
Özet
In this article, the necessity of a Standard method is described briefly for the estimation of bid tender prices for the construction projects. Material retjuirements lists or BOM (Bili of materials approach is extremely useful for this purpose
Keywords
🔖
Cite This Article
Yamak, O. (1996). İNŞAAT YAPIM PROJELERİNDE TEKLİF BEDELİ HESAPLANMASI İÇİN BİR YÖNTEM ÖNERİSİ. Öneri Dergisi, Cilt: 1 Sayı: 5, 13–15. https://doi.org/10.14783/maruoneri.703324