Dergiler / Tekstil ve Konfeksiyon / 2004 / Cilt: 14 - Sayı: 2
Ağ planı tekniklerinden faydalanarak konfeksiyon işletmelerinin organizasyonu
- Sayfa
- 121–124
- DOI
- —
Abstract
Such projects are planned and controlled using special planning methods and diagramming techniques called networking. The most important planing methods used is PERT and CPM. PERT and CPM are planning and control instruments for defining the parts of a project and putting them together in a network form so that the person responsible for each element of work knows what is supposed to happen and when in relation to other project activities. The basic difference in PERT and CPM methods is in how the diagrams are drawn.