Time - Cost Relationships for Superstructure Projects in Turkey

Sayfa
9869–9896
Yayın Tarihi
2020-03-01
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

In addition, the effects of the parameters such as exchange rates and the number of non-working days on the time-cost relationship were investigated statistically.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:The concept of time-cost relationship in construction projects was first introduced by Bromilow.
📊
Temel Bulgular & Veri:Time and cost data of superstructure projects completed between the years of 1999-2018 was used in the study.
💡
Sonuç & Katkı:In addition, the effects of the parameters such as exchange rates and the number of non-working days on the time-cost relationship were investigated statistically.
🔬Tür:Modelleme & Sayısal Simülasyon
📍Kapsam:2018 Verileri
⚙️Değişkenler:Time-cost relationship · Bromilow’s BTC model · superstructure projects

Özet

The concept of time-cost relationship in construction projects was first introduced by Bromilow. Bromilow used the data of the superstructure projects completed in Australia in the creation of the proposed time-cost model (BTC model). The aim of this study is to determine the time-cost relationship of superstructure projects in Turkey. Time and cost data of superstructure projects completed between the years of 1999-2018 was used in the study. Data was grouped primarily on the basis of the intended use of buildings (individual buildings, educational buildings, hospitals, industrial buildings and social housing), and then time-cost relationships were separately determined for each group. In addition, the effects of the parameters such as exchange rates and the number of non-working days on the time-cost relationship were investigated statistically.

Abstract

The concept of time-cost relationship in construction projects was first introduced by Bromilow. Bromilow used the data of the superstructure projects completed in Australia in the creation of the proposed time-cost model (BTC model). The aim of this study is to determine the time-cost relationship of superstructure projects in Turkey. Time and cost data of superstructure projects completed between the years of 1999-2018 was used in the study. Data was grouped primarily on the basis of the intended use of buildings (individual buildings, educational buildings, hospitals, industrial buildings and social housing), and then time-cost relationships were separately determined for each group. In addition, the effects of the parameters such as exchange rates and the number of non-working days on the time-cost relationship were investigated statistically.

🔖

Bu Makaleye Atıf Yap

SÖNMEZ, M., DİKMEN, S., AKBIYIKLI, R. (2020). Time - Cost Relationships for Superstructure Projects in Turkey. Turkish Journal of Civil Engineering, Cilt: 31 - Sayı: 2, 9869–9896. https://ajindex.com/articles/864225

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (14)

  1. Barrie, D. S., & Paulson, B. C., Professional construction management: including CM, design-construct, and general contracting. McGraw-Hill Science/Engineering/Math. 1992
  2. Bayram, S. Duration prediction models for construction projects: In terms of cost or physical characteristics?. KSCE Journal of Civil Engineering, 2017, 21.6: 2049-2060
  3. Bromilow, F. J., Contract Time Performance Expectations and the Reality. Building Forum, 1, 70-80, 1969
  4. Petruseva, S., Pusic, D. C., & Pancovska, V. Z. Model for Predicting Construction Time by Using General Regression Neural Network. International Scientific Conference People, Buildings and Environment 2016 (PBE2016) 29 September – 1 October, 2016, Luhacovice, Czech Republic, 2016
  5. Bayram, S. & Al-Jibouri, S. Reference Class Forecasting Method in Predicting Construction Project Duration. Süleyman Demirel University Journal of Natural and Applied Sciences, 22 (3), pp.1132-1142, 2018 [6] Ariful Haque, K.M., & Hasin, M.A.A. Genetic algorithm for project time-cost optimization in fuzzy environment. Journal of Industrial Engineering and Management, 5(2), pp.364-381, 2012
  6. Odabaşı, E., Models for Estimating Construction Duration: An Application for Selected Buildings on the METU Campus. Ankara: Ortadoğu Teknik Üniversitesi Uygulamalı Bilimler Enstitüsü, 2009
  7. Love, P. E. D., Tse, R. Y. C., & Edwards, D. J., Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management (ASCE), Vol. 131, No. 2, pp. 187-194, 2005
  8. Ireland, V., The Role of Managerial Actions in the Cost Time and Quality Performance of High-Rise Commercial Building Projects. Construction Management and Economics, 3(1), 59-87, 1985
  9. Choudhury, I. & Rajan, S. S. Time-Cost Relationship for Residential Construction in Texas. CIB, 2003
  10. Ng, S., Mak, M., Skitmore, R. & Varnam, M. The Predictive Ability of Bromilow’s Time-Cost Model. Construction Management and Economics, 19(2), 165-173, 2001
  11. Kaka, A., & Price, A. D., Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), 383-400, 1991
  12. Kumaraswamy, M., Chan, D., Determinants of Construction Duration Construction Management and Economics, 13(3), 209-217, 1995
  13. Hoffman, G. J., Thal Jr., A. E., Webb, T. S. & Weir, J. D., Estimating Performance Time for Construction Projects. 23, 193-199, 2006
  14. Chan, A., Time-Cost Relationship of public sector pro