Dergiler / Turkish Journal of Civil Engineering / 2022 / Cilt: 33 - Sayı: 2

Causal Relationships of Readability Risks in Construction Contracts

Sayfa
11823–11846
Yayın Tarihi
2022-03-01
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

The results are expected to improve readability of contract documents, which would contribute to more effective risk management and better allocation of project resources.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:Issues related to readability risks in contracts could exacerbate conflict, claim and dispute occurrences in construction projects.
📊
Temel Bulgular & Veri:Most significant readability risks in construction contracts were analyzed using fuzzy decision-making trial and evaluation laboratory (DEMATEL) method, which is known for its wide implementation in similar problems.
💡
Sonuç & Katkı:The results are expected to improve readability of contract documents, which would contribute to more effective risk management and better allocation of project resources.
🔬Tür:Araştırma Makalesi
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Construction projects · Contract readability · Contract drafting

Özet

Issues related to readability risks in contracts could exacerbate conflict, claim and dispute occurrences in construction projects. Determination of root causes of readability risks by defining casual relationships in construction contracts is essential to improve contract documentation and enable successful risk management. This paper aims to differentiate net causes from net effect factors of readability risks in construction contracts. Most significant readability risks in construction contracts were analyzed using fuzzy decision-making trial and evaluation laboratory (DEMATEL) method, which is known for its wide implementation in similar problems. Root cause degree (RCD) diagram was drawn to illustrate the differentiation of these factors by adopting maximum mean de-entropy (MMDE) algorithm. Analysis results indicated that poor grammar use, legal terminology, visual representation, and negative language were the major underlying cause factors; while lengthy document, use of abbreviations, scope complexity, controversial uses, repetitions, and ambiguous words were the net effect factors. The results are expected to improve readability of contract documents, which would contribute to more effective risk management and better allocation of project resources.

Abstract

Issues related to readability risks in contracts could exacerbate conflict, claim and dispute occurrences in construction projects. Determination of root causes of readability risks by defining casual relationships in construction contracts is essential to improve contract documentation and enable successful risk management. This paper aims to differentiate net causes from net effect factors of readability risks in construction contracts. Most significant readability risks in construction contracts were analyzed using fuzzy decision-making trial and evaluation laboratory (DEMATEL) method, which is known for its wide implementation in similar problems. Root cause degree (RCD) diagram was drawn to illustrate the differentiation of these factors by adopting maximum mean de-entropy (MMDE) algorithm. Analysis results indicated that poor grammar use, legal terminology, visual representation, and negative language were the major underlying cause factors; while lengthy document, use of abbreviations, scope complexity, controversial uses, repetitions, and ambiguous words were the net effect factors. The results are expected to improve readability of contract documents, which would contribute to more effective risk management and better allocation of project resources.

🔖

Bu Makaleye Atıf Yap

KOC, K., GURGUN, A. P. (2022). Causal Relationships of Readability Risks in Construction Contracts. Turkish Journal of Civil Engineering, Cilt: 33 - Sayı: 2, 11823–11846. https://ajindex.com/articles/864145

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (13)

  1. Chong, H. Y. and Zin, R. M., A case study into the language structure of construction standard form in Malaysia, International Journal of Project Management 28, 601–608 2010.
  2. Besaiso, H., Fenn, P., Emsley, M., and Wright, D., A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine: A perspective from the industry, Engineering, Construction and Architectural Management 25, 241–256 2018.
  3. El-Sayegh, S. M. and Mansour, M. H., Risk assessment and allocation in highway construction projects in the UAE, Journal of Management in Engineering 31, 04015004 2015.
  4. Zhang, L., Fenn, P., and Fu, Y., To insist or to concede? Contractors’ behavioural strategies when handling disputed claims, Engineering, Construction and Architectural Management 26, 424–443 2019.
  5. Cheung, S. O. and Yiu, T. W., Are construction disputes inevitable?, IEEE Transactions on Engineering Management 53, 456–470 2006.
  6. Saseendran, A., Bigelow, B. F., Rybkowski, Z. K., and Jourdan, D. E., Disputes in Construction: Evaluation of Contractual Effects of ConsensusDOCS, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 12, 04520008 2020.
  7. El-Adaway, I. H., Abotaleb, I. S., Eid, M. S., May, S., Netherton, L., and Vest, J., Contract Administration Guidelines for Public Infrastructure Projects in the United States and Saudi Arabia: Comparative Analysis Approach, Journal of Construction Engineering and Management 144, 04018031 2018.
  8. Love, P. E. D., Davis, P. R., Cheung, S. O., and Irani, Z., Causal discovery and inference of project disputes, IEEE Transactions on Engineering Management 58, 400–411 2011.
  9. Chong, H. Y. and Zin, R. M., Construction contract administration- an approach on clarity, Clarity 60, 6–10 2008.
  10. Arcadis, Global Construction Disputes Report: Collaborating to achieve project excellence, Amsterdam, Netherlands, 2020.
  11. Cheung, S. O. and Pang, K. H. Y., Anatomy of construction disputes, Journal of Construction Engineering and Management 139, 15–23 2013.
  12. Maqsoom, A., Wazir, S. J., Choudhry, R. M., Thaheem, M. J., and Zahoor, H., Influence of Perceived Fairness on Contractors’ Potential to Dispute: Moderating Effect of Engineering Ethics, Journal of Construction Engineering and Management 146, 04019090 2020.
  13. Wang, Y., Chen, Y., Wang, W., Chen, Y., and Jin, M., Revisiting the Relationship Between Contract Governance and Contractors’ Opportunistic Behavior in Construction Projects, IEEE Transactions on Engineering Management 1, 1–13 2019. Cevi