Discovering hidden patterns in Turkish construction projects delays related to project characteristic

Sayfa
372–378
Yayın Tarihi
2019-10-21
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

Also, some recommendations were presented for reducing delays by using the extracted rules.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:There are delays in delivering construction projects, which have great affects in all countries' economies, due to many factors and reasons and these delays bring many negative consequences.
📊
Temel Bulgular & Veri:Checking the source of these consequences or minimizing their effects is very important in terms of time and cost savings in the construction sector, especially for countries which have a continuous improvement such as Turkey.
💡
Sonuç & Katkı:Also, some recommendations were presented for reducing delays by using the extracted rules.
🔬Tür:Araştırma Makalesi
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Construction Projects · Delay Analysis · Apriori Algorithms

Abstract

There are delays in delivering construction projects, which have great affects in all countries' economies, due to many factors and reasons and these delays bring many negative consequences. Checking the source of these consequences or minimizing their effects is very important in terms of time and cost savings in the construction sector, especially for countries which have a continuous improvement such as Turkey. Determination of project factors that will cause delay, analysis of their impacts and taking protective measures will help to reduce losses. Hereby in this study, the project factors that may cause to delays are identified and some important association rules between these factors and delay are extracted by collecting the data from Turkish Public and private construction projects. Also, some recommendations were presented for reducing delays by using the extracted rules.

🔖

Bu Makaleye Atıf Yap

YILMAZ, İ. C. (2019). Discovering hidden patterns in Turkish construction projects delays related to project characteristic. Journal of Sustainable Construction Materials and Technologies, Cilt: 4 - Sayı: 2, 372–378. https://ajindex.com/articles/780820

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (14)

  1. Enshassi, A., Al-Hallaq, K., and Mohamed, S. (2006). Causes of Contractor’s Business Failure in Developing Countries: The Case of Palestine, Journal of Construction Developing Countries, 11(2), 1– 14
  2. Akogbe, R.K.T., Feng, X., Zhou, J., 2013. Importance and ranking evaluation of delay factors for development construction projects in Benin. KSCE Journal of Civil Engineering. 17 (6):1213-1222
  3. Olbak M., Naimi, S. (2016). Kentsel Dönüşüm Uygulanmış 5 Katlı İki Yapı Örneğinin Deneysel Verileri Kullanılarak Doğrusal Olmayan Analiz Yöntemleri İle Güçlendirme Sonuçlarının İrdelenmesi. İstanbul Aydın Üniversitesi Dergisi, 8 (3), 145-166
  4. Mahamid, 2011. Common Risks Affecting Time Overrun in Road Construction Projects in Palestine: Contractors’ Perspective, Australasian Journal Construction Economics Building this, vol. 13, no. 2, pp.45–53, 2011
  5. Kazaz, A., Ulubeyli, S. and Tuncbilekli, N.A., 2012. Causes of Delays in Construction Projects in Turkey, Journal of Civil Engineering and Management, 2012, 18(3): 426-435
  6. Marzouk, M.M. and El-Rasas, T.I., 2014, Analyzing delay causes in Egyptian construction projects, Journal of Advanced Research, Vol. 5 No.1, pp.49-55
  7. Trauner, J.T., Manginelli, W.A., Lowe, J.S., Nagata, M.F., Furniss, B.J., 2009. Construction Delays: understanding them clearly and Delay Analysis in Construction Analyzing them correctly
  8. Faridi, A.S., El-Sayegh, S.M., 2006. Significant factors causing delay in the UAE construction industry. Construction Management and Economics 24 (11):1167–1176
  9. Odeyinka, H.A. and Yusif, A., 1997, The causes and effects of construction delays on completion cost of housing projects in Nigeria, Journal of Financial Management of Property and Construction 1997, 2(3), 31-44
  10. Sambasivan M., Soon Y. W., 2007. Causes and Effects of Delays in Malaysian Construction İndustry, International Journal of Project Management 25 (2007) 517-526
  11. Zidane, Y.J-T., Andersen, B. 2018. The Top 10 Universal Delay Factors in Construction Projects, International Journal of Managing Projects in Business, Vol. 11 Issue: 3, pp.650-672
  12. Doloi, H., Sawhney, A., Iyer, K.C. and Rentala, S., 2012. Analysing factors affecting delays in Indian construction projects, International Journal of Project Management 30 (2012) 479–489
  13. Sunjka, B.P., Jacob, U. 2013. Significant causes and effects of project delays in the Niger Delta region, Nigeria, SAIIE25 Proceedings, 9th – 11th of July 2013, Stellenbosch
  14. Almutai