Dergiler / International Journal of Thermodynamics / 2015 / Cilt: 18 - Sayı: 2

Performance Improvement of a Boil-off Gas Re-condensation Process with Pre-cooling at LNG Terminals

Sayfa
74–80
Yayın Tarihi
2015-06-13
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

Engineering issues about this process are discussed, simultaneously.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:Since liquefied natural gas (LNG) is stored at a temperature of about -160°C under ambient pressure, it is unable to avoid unexpected generation of boil-off gas (BOG) from LNG storage tanks due to heat transfer from the surroundings to the cryogenic system.
📊
Temel Bulgular & Veri:It is indicated that system performance has been improved in comparison with the direct compression process and the re-condensation process with single-stage pre-cooling.
💡
Sonuç & Katkı:Engineering issues about this process are discussed, simultaneously.
🔬Tür:Araştırma Makalesi
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:boil-off gas · re-condensation · pre-cooling

Abstract

Since liquefied natural gas (LNG) is stored at a temperature of about -160°C under ambient pressure, it is unable to avoid unexpected generation of boil-off gas (BOG) from LNG storage tanks due to heat transfer from the surroundings to the cryogenic system. Reasonable and effective treatment of BOG, can not only reduce the waste of energy at LNG terminals, but also guarantee the safety and stability of the system. This paper puts up with a novel process to condense the double-stage pre-cooled and compressed BOG by means of heat transfer with LNG. With the aim of minimizing the total power consumption, Aspen HYSYS is employed to simulate and optimize the process. It is indicated that system performance has been improved in comparison with the direct compression process and the re-condensation process with single-stage pre-cooling. Engineering issues about this process are discussed, simultaneously.

🔖

Bu Makaleye Atıf Yap

CUİ, M., YUAN, Z., SONG, R., XİE, Y., HAN, L. (2015). Performance Improvement of a Boil-off Gas Re-condensation Process with Pre-cooling at LNG Terminals. International Journal of Thermodynamics, Cilt: 18 - Sayı: 2, 74–80. https://ajindex.com/articles/673571

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (11)

  1. U.S. Energy Information Administration International 2013 energy http://www.eia.gov/forecasts/ieo/ (accessed May 5, 2014). [Online], Available: Kumar, S., Kwon, H. T., Choi, K. H., Hyun Cho, J., Lim, W., and Moon, I., “Current status and future projections of LNG demand and supplies: A global prospective,” Energy Policy, 39, 4097-4104, 2011.
  2. Lim, W., Choi, K., and Moon, I., “Current status and perspectives of liquefied natural gas (LNG) plant design,” Industrial & Engineering Chemistry Research, 52, 3065-3088, 2013.
  3. Lim, W., Lee, I., Tak, K., Cho, J. H., Ko, D., and Moon, I., “Efficient Configuration of a Natural Gas Liquefaction Process for Energy Recovery,” Industrial & Engineering Chemistry Research, 53, 1973-1985, 2014.
  4. He, T. B., Ju, Y. L., “A novel process for small-scale pipeline natural gas liquefaction,” Applied Energy, 115, 17-24, 2014.
  5. Tan, H., Li, Y., Tuo, H., Zhou, M., and Tian, B., “Experimental study on liquid/solid phase change for cold energy storage of Liquefied Natural Gas (LNG) refrigerated vehicle,” Energy, 35, 1927-1935, 2010.
  6. Wang, M., Zhang, J., Xu, Q., and Li, K., “Thermodynamic-analysis-based energy consumption minimization for natural gas liquefaction,” Industrial & Engineering Chemistry Research, 50, 12630-12640, 2011. World’s LNG liquefaction plants and regasification terminals, [Online], Available: www.globallnginfo.com (accessed May 10, 2014).
  7. Kumar, S., Kwon, H. T., Choi, K. H., Lim, W., Cho, J. H., Tak, K., and Moon, I, “LNG: An eco-friendly cryogenic fuel for sustainable development,” Applied Energy, 88, 4264-4273, 2011.
  8. Mabuchi, N., “BOG reliquefaction with cold energy storage and utilization of LNG cold energy using cascade process,” Energy Resour, 27, 334–336, 2006.
  9. Querol, E., Gonzalez-Regueral, B., García-Torrent, J., and García-Martínez, M. J., “Boil off gas (BOG) management in Spanish liquid natural gas (LNG) terminals,” Applied Energy, 87, 3384-3392, 2010.
  10. Jung, M. J., Cho, J. H., and Ryu, W, “LNG terminal from design improvements,” in The 22nd World Gas Congress, Tokyo, Japan, 2003. operator’s practical Shin, M. W., Shin, D., Choi, S. H., Yoon, E. S., and Han, C., “Optimization of the operation of boil-off gas compressors at a liquified natural gas gasification plant,” Industrial & Engineering Chemistry Research, 46, 6540-6545, 2007.
  11. Li, Y., Chen, X., “Dynamic Simulation for Improving the Performance of Boil-Off Gas Recondensation System at LNG Receiving Terminals,” Chemical Engineering Communications, 199, 1251-1