Investigation of Organizational and Regional Perceptions on the Changes in Construction Projects

Sayfa
11257–11286
Yayın Tarihi
2021-11-01
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:One of the most common concerns in construction projects is changes during execution.
📊
Temel Bulgular & Veri:Changes can increase the cost and duration of the construction project hereby, can lead to conflict between the parties involved in construction projects.
💡
Sonuç & Katkı:In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.
🔬Tür:Araştırma Makalesi
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Changes in Construction · Mitigation Measures · cost-time overrun

Özet

One of the most common concerns in construction projects is changes during execution. Changes can increase the cost and duration of the construction project hereby, can lead to conflict between the parties involved in construction projects. The change causes may differ depending on the organizations and regions characteristics. The aim of this study is to investigate the impact of organizational and regional characteristics on key change factors. In this regard, top risky change factors were identified with respect to contractors, consultants, and owners located in North Cyprus, Turkey, and the U.S.A. The research findings showed that the most risky change factors differed in accordance with the characteristics of organizations and regions. It was concluded that “Errors/Inadequacies in Contract Drawing” was the riskiest factor according to contractors while “Low price due to high competition” was noted to be the riskiest change causes with respect to consultants and owners. In point of regions, “Inconsistency between different design disciplines” was identified as the top risky change factor according to the respondents in the U.S.A. located organizations. However “Low contract price” was designated as the top risky change factor according to the respondents in North Cyprus and Turkey. In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.

Abstract

One of the most common concerns in construction projects is changes during execution. Changes can increase the cost and duration of the construction project hereby, can lead to conflict between the parties involved in construction projects. The change causes may differ depending on the organizations and regions characteristics. The aim of this study is to investigate the impact of organizational and regional characteristics on key change factors. In this regard, top risky change factors were identified with respect to contractors, consultants, and owners located in North Cyprus, Turkey, and the U.S.A. The research findings showed that the most risky change factors differed in accordance with the characteristics of organizations and regions. It was concluded that “Errors/Inadequacies in Contract Drawing” was the riskiest factor according to contractors while “Low price due to high competition” was noted to be the riskiest change causes with respect to consultants and owners. In point of regions, “Inconsistency between different design disciplines” was identified as the top risky change factor according to the respondents in the U.S.A. located organizations. However “Low contract price” was designated as the top risky change factor according to the respondents in North Cyprus and Turkey. In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.

🔖

Bu Makaleye Atıf Yap

İLTER, O., ÇELİK, T. (2021). Investigation of Organizational and Regional Perceptions on the Changes in Construction Projects. Teknik Dergi, Cilt: 32 - Sayı: 6, 11257–11286. https://ajindex.com/articles/386401

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (14)

  1. Ming, S., Sexton, M., Aouad, G., Fleming, A., Senaratne, S., Anumba, C., Industrial Report: Managing Changes in Construction Projects Retrieved, Bristol UWE: School of the Built and Natural Environment, Bristol UWE, 2004.
  2. Ibbs, W., Wong, C., Kwak, H., Project Change Management Systems, Journal of Management in Engineering, 17, (3), 159–165, 2001.
  3. Anees, M.M., Mohamed, H.E., Abdul Razek, M.E., Evaluation of change management efficiency of construction contractors, Housing and Building National Research Center, 9,(1), 77-85,2013
  4. Moselhi, O., Assem, I., El-Rayes, K., Change Orders Impact on Labor Productivity, Journal of Construction Engineering and Management, 131, (3), 354–359,2005.
  5. Alnuami, A.S., Taha, R.A., Al Mohsin, M., Al-Harthi, A.S., Causes, Effecrs, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman, Journal of Construction Engineering and Management, 136, (5), 615–622, 2010.
  6. Serag, E., Oloufa, A., Malone, L., Radwan, E., Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction, Journal of Construction Engineering and Management, 136, (9), 1015–1027, 2010.
  7. Arditi, D. Akan, T.A., Gurdamak, S., Reasons for Delay in Public Projects in Turkey, Cosntruction Management and Economics, 3, (2), 171-181, 1985
  8. Kazaz, A., Ulubeyli, S., Tuncbilekli, N.A., Causes of Delay in Construction Projects in Turkey, Journal of Civil Engineering and Management, 18, (3), 426–435,2012.
  9. İlter, O., Çelik, T., The Effect of Project Variables on Cost and Time of Construction Projects, 5th international Project and Construction Management Conference (IPCMC2018), North Cyprus, 2018 O’Brien, J.J., 1998,
  10. Construction Change Orders, New York, McGraw Hill Arain, F.M., Pheng, L.S., How Design Consultants Perceive Potential Causes of Variation Orders for Institutional Buildings in Singapore, Architectural Engineering and Design Management, 1, (3), 181-196, 2005a.
  11. Assaf, S.A., Al-Hejji, S., Causes of Delay in Large Construction Projects, International Journal of Project Management, 24, (4), 349–357, 2006.
  12. Kaming, P.F., Olomolaiye, P.O., Holt, G.D., Harris, F.C., Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia, Construction Management and Economics, 15, (1), 83–94, 1997.
  13. Zaneldin, E.K., Construction Claims in United Arab Emirates: Types, Causes and Frequency, International Journal of Project Management, 24, (5), 453–459, 2006.
  14. Ijaola, I.A., Iyagba, R.O., A comparative Study of C