Optimization of vertical alignment of highways utilizing discrete dynamic programming and weighted ground line

Sayfa
105–116
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

The aim of this study is to present a method to integrate discrete dynamic programming with WGLM to achieve the best vertical alignment of highways in terms of earthwork optimization.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:Earthwork optimization plays an important role for reducing the total cost of highway projects.
📊
Temel Bulgular & Veri:Weighted Ground Line Method (WGLM) is an earthwork optimization technique based on a hypothetical ground line balancing cut-fill volumes and minimizing the total amount of earthwork.
💡
Sonuç & Katkı:The aim of this study is to present a method to integrate discrete dynamic programming with WGLM to achieve the best vertical alignment of highways in terms of earthwork optimization.
🔬Tür:Modelleme & Sayısal Simülasyon
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Highway alignment · Earthwork · Optimization

Özet

Earthwork optimization plays an important role for reducing the total cost of highway projects. Weighted Ground Line Method (WGLM) is an earthwork optimization technique based on a hypothetical ground line balancing cut-fill volumes and minimizing the total amount of earthwork. Current form of the method describes only a hypothetical reference line guiding project engineers to locate the optimal roadway for the fixed horizontal alignment. Therefore, there are numerous grade line alternatives available for a given Weighted Ground Line. The aim of this study is to present a method to integrate discrete dynamic programming with WGLM to achieve the best vertical alignment of highways in terms of earthwork optimization.

Abstract

Earthwork optimization plays an important role for reducing the total cost of highway projects. Weighted Ground Line Method (WGLM) is an earthwork optimization technique based on a hypothetical ground line balancing cut-fill volumes and minimizing the total amount of earthwork. Current form of the method describes only a hypothetical reference line guiding project engineers to locate the optimal roadway for the fixed horizontal alignment. Therefore, there are numerous grade line alternatives available for a given Weighted Ground Line. The aim of this study is to present a method to integrate discrete dynamic programming with WGLM to achieve the best vertical alignment of highways in terms of earthwork optimization.

🔖

Bu Makaleye Atıf Yap

GÖKTEPE, A. B., ALTUN, S., AHMEDZADE, P. (2009). Optimization of vertical alignment of highways utilizing discrete dynamic programming and weighted ground line. Turkish Journal of Engineering and Environmental Sciences, Cilt: 33 - Sayı: 2, 105–116. https://ajindex.com/articles/369069

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (13)

  1. Nomenclature A α β C(ui) Earthwork cost at the ithstage CM CT χ d δ ΔH f(x) fi f0 fr g gmax h hw hW hd h0 l L Earthwork width L Lv m n PS PA PC s S SC S C SF SCS Triangular shaped excess area due to cut slope Triangular shaped absence area due to Şll slope Cumulative cost Optimal elevation increment Elevation of grade line Number of cut areas for new positioning Driving speed Hypothetical natural surface yi AASHTO 2001., “A Policy on Geometric Design of Highways and Streets”, American Association of State Highway and Transportation Officials, Washington, D.C., 2001.
  2. Bertsekas, D.P., “Dynamic Programming and Optimal Control”, 2ndEd., Athena ScientiŞc Publication, Belmont, MA., Chapra, C.C., and Canale, R.P., “Numerical Methods for Engineers”, 3rdEd., McGraw Hill Co., Singapore, 1998. Chew,E.P., Goh, C.J., and Fwa, T.F., “Simultaneous Optimization of Horizontal and Vertical Alignments for High- ways”, Transportation Research Part B, 23B(5), 315-329, 1989.
  3. Easa, S.M., “Selection of Roadway Grades that Minimize Earthwork Cost using Linear Programming”, Transportation Res. Part A, 22A(2), 121-136, 1988.
  4. Easa, S.M., “State-of-the-Art of Three-Dimensional Highway Geometric Design, Canadian Journal of Civil Engineering,, 500-511, 1997.
  5. Fwa, T.F., “Highway Vertical Alignment Analysis by Dynamic Programming”, Transportation Research Record No.1239, TRB, Washington D.C., 1-9, 1989.
  6. Fwa, T.F., Cha, W.T., and Sim, Y.P., “Optimal Vertical Alignment for Highway Design”, Journal of Transportation Engineering, ASCE, 128(5), 395-402, 2002.
  7. Goh, C.J., and Chew, E. P., “Discrete and Continuous Models for Computation of Optimal Vertical Highway Align- ment”, Transportation Research Part B, 22B(6), 399-409, 1988.
  8. Goktepe, A. B., and Lav, A. H., “Method for Balancing Cut-Fill and Minimizing The Amount of Earthwork in the Geometric Design of Highways”, Journal of Transportation Engineering, ASCE, 129(5), 564-571, 2003.
  9. Goktepe, A. B., and Lav, A. H., “Method for Optimizing Earthwork Considering Soil Properties in the Geometric Design of Highways, Journal of Surveying Engineering, ASCE, 130(4), 183-190, 2004.
  10. Jha, M.K., “Criteria-Based Support System for Selecting Highway Alignments”, Journal of Transportation. Engineering, ASCE, 129(1), 33-41, 2003.
  11. Jong, J-C., and Schonfeld, P., “Optimizing Vertical Alignments with Genetic Algorithms, Proc.78thAnnual TRB Meeting, 99-0719,
  12. Washington, D.C., 1999.
  13. Jong, J-C., and Schonfeld, P., “An Evolutionary Model for Simultaneously Optimizing T