Dergiler / Mathematical and Computational Applications / 1999 / Cilt: 4 - Sayı: 1

A dynamic approach for optimization of open pit mine investments with capital budget

Sayfa
45–51
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

The results have revealed the validity of the approach for optimization of mining investments with budget constraint.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:Mining investments require huge capitals.
📊
Temel Bulgular & Veri:Since mining has an economical aspect, a reasonable profit is expected at the end of investment.
💡
Sonuç & Katkı:The results have revealed the validity of the approach for optimization of mining investments with budget constraint.
🔬Tür:Literatür & Derleme Çalışması
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Alan Parametreleri

Abstract

Mining investments require huge capitals. Since mining has an economical aspect, a reasonable profit is expected at the end of investment. In other words, a mining investment is reasonable only if it brings a desirable income. In fact, the objective of mine investment should be the optimum profit, which means the maximum profit that can be handled under certain technical conditions and constraints. In this study, dynamic programming procedures have been investigated whether they can be applied on mining investments having budget constraint. A general and brief review of dynamic programming technique and the theoretical base of capital budget problem have been presented. Two examples have been employed for the applications; first is selecting optimal mine investment alternative(s) through a group of choices and second is selection of optimum excavation-machine alternative(s) providing maximum excavation capacity. By this way, applicability of dynamic programming has been examined on both the whole system and a sub-system. The objective function and recursion functions have been defined and applied on numerical cases. The results have revealed the validity of the approach for optimization of mining investments with budget constraint.

🔖

Bu Makaleye Atıf Yap

ERARSLAN, K., ÇELEBİ, N. E. (1999). A dynamic approach for optimization of open pit mine investments with capital budget. Mathematical and Computational Applications, Cilt: 4 - Sayı: 1, 45–51. https://ajindex.com/articles/280262

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (15)

  1. H A Taha, Dynamic (Multistage) Programming, Operations Research, An Introduction, 5th ed, Chapter 10, MacMillan, New York, 1992
  2. F Hillier and G Lieberman, Dynamic Programming, Introduction to Operations Research, Chapter II, McGraw Hill, 1995
  3. H Lerchs aRd 1. F. Grossman, Optimum Design of Open Pit Mines, Canadian Institution of Mining, CIM Bulletin, 58 (633), 47-54, 1965
  4. T B Johnson and R W Sharp, A Three Dimensional Dynamic Programming Methods for Optimal Ultimate Pit Design, US Bur. Min, RI 7553, 1971
  5. E. Koenigsberg, The Optimum Contours of an Open Pit Mine An Application of Dynamic Programming, 17th APCOM, AIME, 274-287, 1982
  6. Z. Shenggui and A M. Starfield, Dynamic Programming with Colour Graphics Smoothing for Open-Pit Design on a Personal Computer, Int.1. of Min Eng, 3 (11),27-34, 1985
  7. E A Wright, The use of Dynamic Programming for Open Pit Mine Design Some Practical Implications, Min. Sci. and Tech, 6, 79-104, 1987
  8. P A Dowd and Elvan, Dynamic Programming Applied to Grade Control in Sub-level Open Stopping, IMM, 96, AI71-AI78, 1987
  9. P A Dowd and A H Onur, Optimizing Open Pit Design and Sequencing, 23rd APCOM. SME, Colorado, 411-422, 1992
  10. B Tolwinski and R. Underwood, An Algorithm to Estimate the Evolution of an Open Pit Mine", 23rd APCOM, SME, Colorado, 399-409, 1992 [I I] A H Onur and P. A. Dowd, Open-Pit Optimization- Part 2 Production Scheduling and Inclusion of Roadways, [MM, 102, AI05-AI13, 1993
  11. B Elevli, Open Pit Mine Design and Extraction Sequencing by Use of OP and AI, International Journal of Surface Mining, Reclamation and Environment, Balkema, 149-153.1995
  12. K. Erarslan, Development of a Model for Open Pit Limits Optimization Integrated with a Sequencing System, Ph.D. Dissertation, Middle East Technical University, 1996
  13. G L. Nemhauser, A Note on Capital Budgeting, The Journal of Industrial Engineering, 18(6), 1967
  14. H Weingartner, Mathematical Programming and the Analysis of Capital Budgeting Problems, Prentice-Hall, Englewood Cliffs, NJ, 1963
  15. G. E Whitehouse and B. L. Wechsler, Applied Operations Research, John Wiley and Sons, New York, 1976