Dergiler / International Journal of Advances in Engineering and Pure Sciences / 2019 / Cilt: 31 - Sayı: 4

Evaluation of Performance by Operating Process Improvement Modeling On A Company With Pump Manufacturing

Sayfa
305–315
Yayın Tarihi
2019-11-01
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

It is foreseen that this increase can greatly affect the operational efficiency and future managerial decisions, and suggestions are made for future works.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:There may be more than one element affecting quality and efficiency in the manufacturing organizations.
📊
Temel Bulgular & Veri:This study aims to improve production process in a manufacturer of air operated diaphragm pumps by simulation analysis.
💡
Sonuç & Katkı:It is foreseen that this increase can greatly affect the operational efficiency and future managerial decisions, and suggestions are made for future works.
🔬Tür:Modelleme & Sayısal Simülasyon
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Assembly Line · Process Improvement Simulation · Pump

Özet

There may be more than one element affecting quality and efficiency in the manufacturing organizations. As a result of multiple elements occurring at the same time, permanent losses occur in final production and quality. Both the customer sense of trust and their satisfaction are negatively affected because of those problems. Failure to achieve targeted levels of quality and productivity in the organization reduces customer satisfaction. Quality and productivity in the organization are affected by inefficiency in resource utilization, bottlenecks in the production and inefficient workflow design within the organization. This study aims to improve production process in a manufacturer of air operated diaphragm pumps by simulation analysis. Most efficient way of utilizing raw materials, manpower, vehicles and equipment is sought by simulation based process improvement. Discrete-event simulation software (Arena) is used to detect problems in the production process such as: transportation, blockage and/or layout. Simulation is used to experiment with process improvement approaches without making changes in the real-world production system. Simulation models of the current state and the proposed future state with improvements to the layout of the production system are created. The results from the models were compared with each other and evaluations were made. The future state simulation model utilizes existing resources for process improvement, without the requirement for additional resource acquisition. Comparison of current state model and future state model simulation output data, suggests a 67% increase in the number of products produced per month. It is foreseen that this increase can greatly affect the operational efficiency and future managerial decisions, and suggestions are made for future works.

Abstract

There may be more than one element affecting quality and efficiency in the manufacturing organizations. As a result of multiple elements occurring at the same time, permanent losses occur in final production and quality. Both the customer sense of trust and their satisfaction are negatively affected because of those problems. Failure to achieve targeted levels of quality and productivity in the organization reduces customer satisfaction. Quality and productivity in the organization are affected by inefficiency in resource utilization, bottlenecks in the production and inefficient workflow design within the organization. This study aims to improve production process in a manufacturer of air operated diaphragm pumps by simulation analysis. Most efficient way of utilizing raw materials, manpower, vehicles and equipment is sought by simulation based process improvement. Discrete-event simulation software (Arena) is used to detect problems in the production process such as: transportation, blockage and/or layout. Simulation is used to experiment with process improvement approaches without making changes in the real-world production system. Simulation models of the current state and the proposed future state with improvements to the layout of the production system are created. The results from the models were compared with each other and evaluations were made. The future state simulation model utilizes existing resources for process improvement, without the requirement for additional resource acquisition. Comparison of current state model and future state model simulation output data, suggests a 67% increase in the number of products produced per month. It is foreseen that this increase can greatly affect the operational efficiency and future managerial decisions, and suggestions are made for future works.

🔖

Bu Makaleye Atıf Yap

İNAN, A. T., KARTAL, M. A. (2019). Evaluation of Performance by Operating Process Improvement Modeling On A Company With Pump Manufacturing. International Journal of Advances in Engineering and Pure Sciences, Cilt: 31 - Sayı: 4, 305–315. https://ajindex.com/articles/257766

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (13)

  1. Monks, J., G. (1996) “İşlemler Yönetimi” S. Üreten (2.Bas. Çev.), İstanbul, Nobel Yayıncılık
  2. Bozkurt, R. (2003) “Süreç İyileştirme
  3. Basım, An¬kara, MPM
  4. Takcı, E.:’Bir İmalat İşletmesinde Simülasyon Yardımıyla Süreç İyileştirme Uygulaması Kayseri Gürkar Tekstil Örneği’, Yüksek Lisans Tezi, Nevşehir Hacı Bektaş Veli Üniversitesi Sosyal Bilimler Enstitüsü, Nevşehir, Türkiye, (2013)
  5. Yurdakul, M.;Eşkin, S.;İç, Yusuf T.İ.:’ Bir İmalat Sisteminin Yerleşim Düzeninin İyileştirilmesi’, Gazi Üniversitesi Mühendislik Fakültesi, Başkent Üniversitesi Mühendislik Fakültesi,Ankara, Türkiye, (2009)
  6. Özateş, M.;Şahin, M.; Şenol, S.; Terzi, F.; Yörükoğlu, S.; Köksal, G.; Serin, Y.:’ Düşük Hacimli Üretim İçin Kalite Kontrol Sistemi Tasarımı’, Orta Doğu Teknik Üniversitesi Mühendislik Fakültesi, Ankara, Türkiye, (2012)
  7. Yurdakul, M.;Türkbaş, S.; Altınova, S.: ’ Bir İmalat Tesisinde Toplam Verimli Bakım (TVB) Uygulaması’, Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi, Ankara, Mercedes-Benz Türk A.Ş. Aksaray Fabrikası, Aksaray, (2008)
  8. Oran, A.:’ Talaşlı İmalat Optimizasyonunda Metodik Yaklaşım ve Sektörel Bir Altı Sigma Proje Uygulaması’, BOSCH San. ve Tic. A.Ş. Teknik Fonksiyonlar 1 Departmanı, Bursa, Türkiye, (2012)
  9. Şahin, Ş.; Öztürk, F.:’ İmalat Süreçlerindeki Problemlere Optimum Çözüm Arama Ve Bir Uygulama’, Uludağ Üniversitesi Mühendislik-Mimarlık Fakültesi, Bursa, (2009)
  10. Görener, A.:’ Toplam Verimli Bakım ve Ekipman Etkinliği: Bir İmalat İşletmesinde Uygulama’, Electronic Journal of Vocational Colleges, İstanbul, (2012)
  11. Kathiriya1, J. J.; Amareliya2, V.D.; Kapadiya3, S.H.:’ Production Process Analysis On Manufacturing of Hydraulic Gear Pump’, 1Department of Mechanical, Shantilal Shah Engineering College, Bhavnagar, Gujarat, INDIA2 Department of Mechanical, Mahatma Gandhi Institute of Technical Education and Research Centre, Navsari, Gujarat, INDIA3 Department of Mechanical, Mahatma Gandhi Institute of Technical Education and Research Centre, Navsari, Gujarat, INDIA, (2014)
  12. Kaljahi, B.Z.:’ Reverse Engineering of Pump Impeller Utilizing Rapid Prototyping Technology’, Eastern Mediterranean University the Institute of Graduate Studies and Research, Gazimağusa, North Cyprus, (2015)
  13. Tamlander, J.:’Defining a Manufacturing Planning and Control Model For a Lean Manufacturing Company’, Bachelor’s Thesis, JAMK University of Applied Sciences, Technology Degree Programme in Logistics Engineering, Jyväskylä, Finland, (20