Dergiler / Engineering Sciences / 2026 / Cilt: 13 Sayı: 2

DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS

Tayfun Dede(KARADENİZ TEKNİK ÜNİVERSİTESİ)
Sayfa
128–136
Yayın Tarihi
2018-04-21
DOI
—
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

A computer program is developed to realize the time-cost trade-off problem by using MATLAB.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:It is desirable that the construction projects can be completed in the most appropriate manner at the desired time, cost or other purposes.
📊
Temel Bulgular & Veri:If any of these requests are solely aimed, the appropriate project parameters can be determined and the results such as the optimal time or cost can be determined after an optimization process.
💡
Sonuç & Katkı:A computer program is developed to realize the time-cost trade-off problem by using MATLAB.
🔬Tür:Modelleme & Sayısal Simülasyon
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Optimization · Construction Project · Decision-Making

Özet

It is desirable that the construction projects can be completed in the most appropriate manner at the desired time, cost or other purposes. If any of these requests are solely aimed, the appropriate project parameters can be determined and the results such as the optimal time or cost can be determined after an optimization process. If more than one goal is to be achieved at the same time, the decision making process becomes more difficult. In this case, rather than a single final result, multiple results can be obtained. A number of techniques are used to optimize both time and cost. In this study, the techniques proposed for this purpose in the literature have been examined and some of these techniques have been applied to the construction projects considered as time-cost problem. Also, the TLBO algorithm, popular in recent years, has been the preferred in the solution of the multi-objective optimization problem. Construction project business activities which are taken into account as a time-cost problem in the literature are examined as numerical examples. A computer program is developed to realize the time-cost trade-off problem by using MATLAB.

🔖

Bu Makaleye Atıf Yap

Dede, T. (2018). DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS. Engineering Sciences, Cilt: 13 Sayı: 2, 128–136. https://ajindex.com/articles/1649654

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (10)

  1. Bromilow, F.J., (1969). Contract Time Performance Expectation and the Reality. Building Forum, 1(3):70-80.
  2. Le-Hoai, L. and Lee, Y.D., (2009). Time-Cost Relationships of Building Construction Project in Korea. Facilities, 27(13/14):549-559.
  3. Parveen, S. and Saha, S.K. (2012). GA Based Multi-Objective Time-Cost Optimization in a Project with Resources Consideration. International Journal of Modern Engineering Research (IJMER), 2(6):4352-4359.
  4. Rao, R.V., Savsani, V.J., and Vakharia, D.P., (2011). Teaching-Learning Based Optimization: A Novel Method for Constrained Mechanical Design Optimization Problems. Computer-Aided Design, 4:303-315.
  5. Dede, T., (2014). Application of Teaching-Learning-Based-Optimization Algorithm for the Discrete Optimization of Truss Structures. KSCE Journal of Civil Engineering, 18(6):1759-1767.
  6. Zheng, D.X.M., Thomas, N.S., and Kumaraswamy, M.M., (2005). Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization. J.Construction. Eng. Manage., 131(1):81-91.
  7. Afshar, A., Kaveh, A., Kasaeian, A., and Shoghli, O.R., (2007). Modified Adaptive Weighting Method for Time-Cost Trade-off Problem based on Ant Colony Optimization. Proceedings of 3rd National Congress on Civil Engineering, 1-9.
  8. Deb, K., (2002). A Fast and Elitist Multiobjective Genetic Algorithm: Nsga-Ii. IEEE Transactions on Evolutionary Computation, 6(2):182-197.
  9. Zheng, D.X.M., Ng, S.T., and Kumaraswamy, M.M., (2004). Applying a Genetic Algorithm-Based Multiobjective Approach for Time-cost Optimization. Journal of Construction Engineering and Management, 130(2):168-176.
  10. Gen, M. and Cheng, R., (2000). Genetic Algorithms & Engineering Optimization. Wiley-Interscience, New York.