The Effects of Machine Load Sitnations on Performance of Job Shop and Group Scheduling

Sayfa
—
Yayın Tarihi
1998-06-01
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

A job shop {JS) model is applied to the shop floor area and :ompared with a simulation of a similar proposal except hat group technology (GT) model was used in the shop loor area instead. )etailed analysis of the results from applying different nachine load sitnations and different models were ssessed according to the performance criteria of order ardiness, work-in-progress and machine utilisation.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:Perfonnance of job shop and group scheduling ndermulti­natch work input environment was exarnined against two nachine load (light and high load) situations. n order to conduct the analysis, a deterministic computer ;im ulation program was written and used.
📊
Temel Bulgular & Veri:Perfonnance of job shop and group scheduling ndermulti­natch work input environment was exarnined against two nachine load (light and high load) situations. n order to conduct the analysis, a deterministic computer ;im ulation program was written and used.
💡
Sonuç & Katkı:A job shop {JS) model is applied to the shop floor area and :ompared with a simulation of a similar proposal except hat group technology (GT) model was used in the shop loor area instead. )etailed analysis of the results from applying different nachine load sitnations and different models were ssessed according to the performance criteria of order ardiness, work-in-progress and machine utilisation.
🔬Tür:Modelleme & Sayısal Simülasyon
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Simulation · Computer Simulation · Group rechnology

Özet

Perfonnance of job shop and group scheduling ndermulti­natch work input environment was exarnined against two nachine load (light and high load) situations. n order to conduct the analysis, a deterministic computer ;im ulation program was written and used. A job shop {JS) model is applied to the shop floor area and :ompared with a simulation of a similar proposal except hat group technology (GT) model was used in the shop loor area instead. )etailed analysis of the results from applying different nachine load sitnations and different models were ssessed according to the performance criteria of order ardiness, work-in-progress and machine utilisation.

Abstract

-

🔖

Bu Makaleye Atıf Yap

Torkul, O. (1998). The Effects of Machine Load Sitnations on Performance of Job Shop and Group Scheduling. Sakarya University Journal of Science, Volume: 2 Issue: 1. https://doi.org/10.16984/saufbed.00267

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (15)

  1. [J]. AI -Quattan, I. "Designing GT Cells Enhanced by Group Scheduling: key to flexible manufacturing systems", Proceedings of Integrated Systerns Conference, IIE, USA, 1988. Flynn, B.B., Jacobs, F.R., "An Experimental
  2. Comparison of Cellular (Group Technology) Layout with Process Layout", Decision Sciences, Vol. 18, No.4, pp.5 62-587, 1987.
  3. (3]. Wemn1erlov, U. Vakharia, A., " Job and Familv
  4. Scheduling of a Flow-Line Manufacturing Cell", lEE
  5. Trans. Vol.23, No.4, pp.383-293.1991.
  6. f4]. Hollier. R.H. and Sinha, RK., "A Review of
  7. Production Control Problems in Cellular Manufacture", Int.J.Prod.Res., Vol.22, No.5, pp.773-789,1984.
  8. . Abdin, M.F. and Mohamed, N.S, "Simulation Support Methodology for Group Scheduling in FMS", Recent Developments in Production Research, Edited by MTTAL, A., (Elsevier Science Publishers, Amsterdam). 1988. Mavivann� S., Watson, E.F., and Ham, I.,
  9. Heuristic Rule to Miıtimize the mean Flov Time as a Secondary Measure to Makespan in a Group Technology
  10. Cell u, Proceedings of 9th International Conference on Production Research. pp.2370-2377,1987. Mosier, C., Elvers, D.A., and Kelly D., " Analysis o Group Technology Scheduling Heuristics", Int.J.Prod.Res., Vol.22, No.5, pp.857-876, 1984. Sassa ni, F., " A Simulation Study on Peıfoı ınance Improv ement of Group Technology Cells"� Int.J.Prod.Res., Vol.28, No.2, pp.293-300, 1990. Jiamin, L., Fuzeng, Y., "The Introduction of Practical Process Expert Systems, Info ıınation Technology for Advanced Manufacturing Systems", IFIP Trans., (North­Holland), pp.383-356�1 992. Ben-Arieh, D., and Dror, !1., "Group Scheduling Using Group Technology Concepts", Int.J. Computer
  11. Integrated Manufacturing, Vol.2, No.4, pp.l86-193.1989.
  12. [l l]. Torkul. 0., "A Comparison of l.1RP/GT and:rvm.P/JS Scheduling." Ph.D. Thesis. Cranfiel Institute of Techno1ogy, 1993.
  13. [J]. AI -Quattan, I. "Designing GT Cells Enhanced by Group Scheduling: key to flexible manufacturing systems", Proceedings of Integrated Systerns Conference, IIE, USA, 1988.
  14. (3]. Wemn1erlov, U. Vakharia, A., " Job and Familv
  15. [l l]. Torkul. 0., "A Comparison of l.1RP/GT and:rvm.P/JS Scheduling." Ph.D. Thesis. Cranfiel Institute of Techno1ogy, 1993.