Dergiler / Turkish Journal of Engineering / 2026 / Volume: 10 Issue: 4

Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment

Abdallah Lalmi(UNIVERSITY OF CONSTANTINE3 SALAH BOUBNIDER)0000-0002-9806-1391
Badreddine Boumali(University of Constantine 3)0000-0002-7565-3730
Elafri Nedjwa(University of Constantine 3)0000-0001-9623-0107
Sayfa
—
Yayın Tarihi
2026-10-16
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

The main contribution of this study is to quantify this implementation–performance gap in the Algerian construction sector and to identify the human-capital (certification) deficit as its principal weak link, offering transferable, practice-oriented insights for improving performance in comparable developing contexts.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:This study examines the use of project management practices in Algerian construction companies and their impact on overall project performance.
📊
Temel Bulgular & Veri:Despite the growing importance of project management in the global construction industry, limited research has explored its adoption in developing countries, particularly in Algeria.A quantitative, cross-sectional survey was conducted over nine months with 54 construction firms (an effective response rate of about 27%) using a structured questionnaire covering project organisation, project management (PM) practices, and performance outcomes.
💡
Sonuç & Katkı:The main contribution of this study is to quantify this implementation–performance gap in the Algerian construction sector and to identify the human-capital (certification) deficit as its principal weak link, offering transferable, practice-oriented insights for improving performance in comparable developing contexts.
🔬Tür:Uygulamalı Anket & Alan Araştırması
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:project management · construction industry · Maturity

Abstract

This study examines the use of project management practices in Algerian construction companies and their impact on overall project performance. Despite the growing importance of project management in the global construction industry, limited research has explored its adoption in developing countries, particularly in Algeria.A quantitative, cross-sectional survey was conducted over nine months with 54 construction firms (an effective response rate of about 27%) using a structured questionnaire covering project organisation, project management (PM) practices, and performance outcomes. The findings indicate moderate but insufficient implementation levels, with average scores of 3.62 for project organisation, 3.67 for PM practices, and 3.48 for project performance (on a five-point scale). Notably, 75% of firms have very few certified PM professionals and 79.2% report no formal certifications, although 52.4% have established Project Management Offices (PMOs). The results reveal a clear gap between the adoption of PM practices and the performance achieved, interpreted as an association rather than a causal effect given the cross-sectional design. The main contribution of this study is to quantify this implementation–performance gap in the Algerian construction sector and to identify the human-capital (certification) deficit as its principal weak link, offering transferable, practice-oriented insights for improving performance in comparable developing contexts.

🔖

Bu Makaleye Atıf Yap

Lalmi, A., Boumali, B., Nedjwa, E., Fernandes, G. (2026). Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment. Turkish Journal of Engineering, Volume: 10 Issue: 4. https://doi.org/10.31127/tuje.1968457

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (34)

  1. Akande, O. K., Obi-George, L. C., Lembi, J. J., Umar, I. A., Tarni, A. M., Nwokorie, A. J., & Baba, P. H. (2024). Public housing project delivery in Nigeria: Quality versus quantity. Journal of Contemporary Urban Affairs, 8(1), 37–56. https://doi.org/10.25034/ijcua.2024.v8n1-3
  2. Alshibani, A., Hafez, B. E., Hassanain, M. A., Mohammed, A., Al-Osta, M., & Bahraq, A. (2024). Fuzzy logic-based method for forecasting project final cost. Buildings, 14(12), 3738. https://doi.org/10.3390/buildings14123738
  3. Alsolami, B. M. (2022). Identifying and assessing critical success factors of value management implementation in the Saudi Arabia building construction industry. Ain Shams Engineering Journal, 13(6), 101804. https://doi.org/10.1016/j.asej.2022.101804
  4. Ansari, R., Khalilzadeh, M., Taherkhani, R., Antucheviciene, J., Migilinskas, D., & Moradi, S. (2022). Performance prediction of construction projects based on the causes of claims: A system dynamics approach. Sustainability, 14(7), 4138. https://doi.org/10.3390/su14074138
  5. Arora, M., Verma, S., Kavita, Wozniak, M., Shafi, J., & Ijaz, M. F. (2022). An efficient ANFIS-EEBAT approach to estimate the effort of Scrum projects. Scientific Reports, 12(1), 7974. https://doi.org/10.1038/s41598-022-11565-2
  6. Çalişkan, E. B., & Pekeriçli, M. K. (2025). The involvement of project stakeholders in the briefing process: Evaluations through a construction project. Turkish Journal of Engineering, 9(1), 12–20. https://doi.org/10.31127/tuje.1496562
  7. Chadee, A. A., Mahabir, R., Banerjee, K. S., Verma, S., & Azamathulla, H. M. (2025). The causal nature of adopting the standardized project management body of knowledge (PMBOK) on construction projects. Discover Civil Engineering, 2(1), 168.
  8. Coşkun, H., & Sancar, S. (2021). Client satisfaction as perceived by architects and civil engineers. Turkish Journal of Engineering, 5(3), 100–104. https://doi.org/10.31127/tuje.688291
  9. Darko, A., Chan, A. P. C., Yang, Y., & Tetteh, M. O. (2020). Building information modeling (BIM)-based modular integrated construction risk management: Critical survey and future needs. Computers in Industry, 123, 103327. https://doi.org/10.1016/j.compind.2020.103327
  10. Darko, A., Oppong, G. D., & Chan, A. P. C. (2025). Introduction to project management. In Developing a body of knowledge for green construction project management (pp. 19–76). World Scientific.
  11. Elalwani, E., & Çalişkan, E. B. (2024). Integrating BIM technology in construction for effective knowledge management: Case studies and methodological insights. Turkish Journal of Engineering, 8(4), 647–655. https://doi.org/10.31127/tuje.1458923
  12. Farea, A., Otreba, M., Ullah, R., McKenna, T., Carroll, S., & Harrington, J. (2026). Digital transformation of the AEC industry: A review of BIM implementation toolkits from leading countries. Smart and Sustainable Built Environment. Advance online publication. https://doi.org/10.1108/SASBE-07-2025-0367
  13. Gruden, N., & Stare, A. (2018). The influence of behavioural competencies on project performance. Project Management Journal, 49(3), 98–109. https://doi.org/10.1177/8756972818770841
  14. Kabwe, C., Innocent, M., & Muleya, F. (2023). Assessment of infrastructure development approach in newly created districts in Zambia: A case study. CSID Journal of Infrastructure Development, 6(2), 10. https://doi.org/10.7454/jid.v6.i2.1128
  15. Kakoma, P., Nyimbili, P. H., Tembo, M., & Mwanaumo, E. M. (2025). A performance forecasting model for optimizing CDF-funded construction projects in the Copperbelt Province, Zambia. Journal of Contemporary Urban Affairs, 9(1), 290–309. https://doi.org/10.25034/ijcua.2025.v9n1-15
  16. Kerzner, H. (2022). Innovation project management: Methods, case studies, and tools for managing innovation projects (2nd ed.). John Wiley & Sons.
  17. Koruk, T., & Bilgin, T. T. (2025). Unveiling trends: A comprehensive analysis of state-funded projects of Türkiye through content analysis and text mining. Turkish Journal of Engineering, 9(2), 237–249. https://doi.org/10.31127/tuje.1538068
  18. Lalmi, A., Fernandes, G., & Sassi Boudemagh, S. (2021). A conceptual hybrid project management model for construction projects. Procedia Computer Science, 181, 921–930. https://doi.org/10.1016/j.procs.2021.01.248
  19. Lalmi, A., Fernandes, G., & Sassi Boudemagh, S. (2022). Synergy between Traditional, Agile and Lean management approaches in construction projects: bibliometric analysis. Procedia Computer Science, 196, 732–739. https://doi.org/10.1016/j.procs.2021.12.086
  20. Lalmi, A., Boumali, B., Fernandes, G., & Sassi Boudemagh, S. (2025). Identifying the most used traditional project management practices in construction industry. Procedia Computer Science, 256, 1756–1763. https://doi.org/10.1016/j.procs.2025.02.315
  21. Lalmi, A., Fernandes, G., & Sassi Boudemagh, S. (2023). A hybrid project management model for construction projects: A mixed research approach. In Mixed Methods Research Design for the Built Environment (pp. 57–70). Routledge. https://doi.org/10.1201/9781003204046-5
  22. Mariam, S., Khawaja, K. F., Qaisar, M. N., & Ahmad, F. (2022). Knowledge-oriented leadership, team cohesion, and project success: A conditional mechanism. Project Management Journal. Advance online publication. https://doi.org/10.1177/87569728211063128
  23. Mavi, N. K., Brown, K., Fulford, R., & Goh, M. (2024). Forecasting project success in the construction industry using an adaptive neuro-fuzzy inference system. International Journal of Construction Management, 24(14), 1550–1568. https://doi.org/10.1080/15623599.2023.2266676
  24. Merzouk, M., Zhao, J., & Xu, Z. (2025). Sustainable building project management in Algeria: Challenges, strategies, and future directions for environmentally friendly construction. Buildings, 15(6), 883. https://doi.org/10.3390/buildings15060883
  25. Musonda, I., Zulu, S. L., Zulu, E., & Kavishe, N. (2025). Understanding clients' role in community stakeholder participation and influence on infrastructure sustainability: A stakeholder theory lens. International Journal of Construction Management, 25(4), 419–427. https://doi.org/10.1080/15623599.2024.2331862
  26. Naji, K. K., Gunduz, M., & Naser, A. F. (2022). An adaptive neuro-fuzzy inference system for the assessment of change-order management performance in construction. Journal of Management in Engineering, 38(2), 04021098. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001017
  27. Ofori, D. F. (2013). Project management practices and critical success factors: A developing country perspective. International Journal of Business and Management, 8(21), 14–31.
  28. Pinto, J. K. (2022). Avoiding the inflection point: Project management theory and research after 40 years. International Journal of Project Management, 40(1), 4–8.
  29. Pretorius, S., Steyn, H., & Bond-Barnard, T. J. (2023). Project management maturity and project management success in developing countries. The South African Journal of Industrial Engineering, 34(2), 36–48. https://doi.org/10.7166/34-2-2760
  30. Saad, S., Alaloul, W. S., Ammad, S., Altaf, M., & Qureshi, A. H. (2022). Identification of critical success factors for the adoption of the Industrialized Building System (IBS) in the Malaysian construction industry. Ain Shams Engineering Journal, 13(2), 101547. https://doi.org/10.1016/j.asej.2021.06.031
  31. Salhi, R., & Messaoudi, K. (2021). The effects of delays in Algerian construction projects: An empirical study. Civil and Environmental Engineering Reports, 31(2), 218–254.
  32. Sidorov, A. (2023). Assessment of project management maturity models: Strengths and weaknesses. Journal of Risk and Financial Management, 16(2), 121. https://doi.org/10.3390/jrfm16020121
  33. Sikombe, S., & Phiri, M. A. (2021). Institutional factors influencing institutionalised supplier development initiatives in the construction industry in Zambia. Cogent Business & Management, 8(1), 1935184. https://doi.org/10.1080/23311975.2021.1935184
  34. Winch, G., Maytorena-Sanchez, E., & Sergeeva, N. (2022). Strategic project organizing. Oxford University Press.