Manufacturing Lead Time Using the Value Stream Mapping (VSM) Approach in the Oyster Mushroom Baglog Production Process

Sayfa
234–245
Yayın Tarihi
2024-09-17
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

After implementing the improvements, results were obtained in the form of a reduction in sieving workstations, a reduction in non-added value (NVA) time, an increase in PCE by 3.68%, a decrease in MLT by 3213,718 minutes (2 days).

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:“Omah Mushroom Ungaran” is one of the oyster mushroom baglog producers in Indonesia.
📊
Temel Bulgular & Veri:The MLT that appears to produce the average monthly demand is 6462 pcs baglog, which is 39575.73 minutes (28 days).
💡
Sonuç & Katkı:After implementing the improvements, results were obtained in the form of a reduction in sieving workstations, a reduction in non-added value (NVA) time, an increase in PCE by 3.68%, a decrease in MLT by 3213,718 minutes (2 days).
🔬Tür:Araştırma Makalesi
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:value stream mapping · oyster baglog production · lean manufacturing

Abstract

“Omah Mushroom Ungaran” is one of the oyster mushroom baglog producers in Indonesia. The problem is delays in fulfilling demand due to manufacturing lead time (MLT), which exceeds the time limit for the product to reach the customer. The MLT that appears to produce the average monthly demand is 6462 pcs baglog, which is 39575.73 minutes (28 days). We should fulfill the order for one month within 26 days. Therefore, the researchers created a design to improve the oyster mushroom baglog mixing process at the mixing workstation to reduce MLT. The approach taken is value stream mapping. The sieving process, which occurs after blending raw materials using a mixing machine, is causing delays in fulfilling demand and serves as the root cause. The mixing machine design used by the company has not been able to produce the desired mixing output. The solution the researchers designed was developing a mixing machine with a stirrer propeller. The researchers also created an infill tank on the device to unify the mixed packaging process. After implementing the improvements, results were obtained in the form of a reduction in sieving workstations, a reduction in non-added value (NVA) time, an increase in PCE by 3.68%, a decrease in MLT by 3213,718 minutes (2 days).

🔖

Bu Makaleye Atıf Yap

Islahudin, N., Yusianto, R., Jodanta, T. T. (2024). Manufacturing Lead Time Using the Value Stream Mapping (VSM) Approach in the Oyster Mushroom Baglog Production Process. El-Cezeri, Cilt: 11 Sayı: 3, 234–245. https://doi.org/10.31202/ecjse.1409431

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (36)

  1. M. Hultberg, T. Prade, H. Bodin, A.Vidakovic, and H. Asp, ‘‘Adding benefit to wetlands – Valorization of harvested common reed through mushroom production,’’ Science of The Total Environment, vol. 637-638, pp. 1395–1399, Oct. 2018. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S0048969718317418
  2. W. A. Wan Mahari, W. Peng, W. L. Nam, H. Yang, X. Y. Lee, Y. K. Lee, R. K. Liew, N. L. Ma, A. Mohammad, C. Sonne, Q. Van Le, P. L. Show, W.-H. Chen, and S. S. Lam, ‘‘A review on valorization of oyster mushroom and waste generated in the mushroom cultivation industry,’’ Journal of Hazardous Materials, vol. 400, p. 123156, Dec. 2020. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S0304389420311456
  3. D. Stadnicka and P. Litwin, ‘‘Value stream mapping and system dynamics integration for manufacturing line modelling and analysis,’’ International Journal of Production Economics, vol. 208, pp. 400–411, Feb. 2019. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S0925527318304894
  4. A. Erceg, ‘‘Lean manufacturing application in the frozen goods industry,’’ Journal of ekonomi, vol. 4, no. 2, pp. 57–62, 2022. [Online]. Available: https://dergipark.org.tr/en/pub/ekonomi/issue/70173/1182631
  5. S. Kumar, A. K. Dhingra, and B. Singh, ‘‘Process improvement through Lean-Kaizen using value stream map: a case study in India,’’ Int J Adv Manuf Technol, vol. 96, no. 5-8, pp. 2687–2698, May 2018. [Online]. Available: http://link.springer.com/10.1007/s00170-018-1684-8
  6. D. D. Shinde, S. Ahirrao, and R. Prasad, ‘‘Fishbone Diagram: Application to Identify the Root Causes of Student–Staff Problems in Technical Education,’’ Wireless Pers Commun, vol. 100, no. 2, pp. 653–664, May 2018. [Online]. Available: http://link.springer.com/10.1007/s11277-018-5344-y
  7. J. P. Womack and D. T. Jones, ‘‘Lean Thinking—Banish Waste and Create Wealth in your Corporation,’’ J Oper Res Soc, vol. 48, no. 11, pp. 1148–1148, Dec. 1997. [Online]. Available: https://www.nature.com/doifinder/10.1038/sj.jors.2600967
  8. S. G. Gebeyehu, M. Abebe, and A. Gochel, ‘‘Production lead time improvement through lean manufacturing,’’ Cogent Engineering, vol. 9, no. 1, p. 2034255, Dec. 2022. [Online]. Available: https://www.tandfonline.com/doi/full/10.1080/23311916.2022.2034255
  9. R. Hardcopf, G. J. Liu, and R. Shah, ‘‘Lean production and operational performance: The influence of organizational culture,’’ International Journal of Production Economics, vol. 235, p. 108060, May 2021. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S0925527321000360
  10. S. Gupta and S. K. Jain, ‘‘A literature review of lean manufacturing,’’ International Journal of Management Science and Engineering Management, vol. 8, no. 4, pp. 241–249, Nov. 2013. [Online]. Available: https://www.tandfonline.com/doi/full/10.1080/17509653.2013.825074
  11. R. Sharma, M. Kasher, L. Zhang, N. Mani, and B. Lai, ‘‘Application of Lean Manufacturing Principles in Optimizing Factory Production,’’ in 2018 IEEE MIT Undergraduate Research Technology Conference (URTC). Cambridge, MA, USA: IEEE, Oct. 2018, pp. 1–4.[Online]. Available: https://ieeexplore.ieee.org/document/9244796/
  12. S. Yaşar, M. YEŞİLYURT, O. GÜNAYDIN, E. Levent, and T. KÜÇÜKÖMEROĞLU, ‘‘Dövme kalıplarında aşınma mekanizmaları,’’ El-Cezeri, vol. 8, no. 1, pp. 202–219. [Online]. Available: https://dergipark.org.tr/en/pub/ecjse/article/819457
  13. S. Panigrahi, K. K. Al Ghafri, W. R. Al Alyani, M. W. Ali Khan, T. Al Madhagy, and A. Khan, ‘‘Lean manufacturing practices for operational and business performance: A PLS-SEM modeling analysis,’’ International Journal of Engineering Business Management, vol. 15, p. 184797902211478, Jan. 2023. [Online]. Available: http://journals.sagepub.com/doi/10.1177/18479790221147864
  14. F. Abu, H. Gholami, M. Z. Mat Saman, N. Zakuan, and D. Streimikiene, ‘‘The implementation of lean manufacturing in the furniture industry: A review and analysis on the motives, barriers, challenges, and the applications,’’ Journal of Cleaner Production, vol. 234, pp. 660–680, Oct. 2019. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S0959652619322449
  15. D. E. Ufua, T. Papadopoulos, and G. Midgley, ‘‘Systemic Lean Intervention: Enhancing Lean with Community Operational Research,’’ European Journal of Operational Research, vol. 268, no. 3, pp. 1134–1148, Aug. 2018. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S0377221717307166
  16. N. Kumar, S. Shahzeb Hasan, K. Srivastava, R. Akhtar, R. Kumar Yadav, and V. K. Choubey, ‘‘Lean manufacturing techniques and its implementation: A review,’’ Materials Today: Proceedings, vol. 64, pp. 1188–1192, 2022. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S2214785322018284
  17. Ö. DEMİRCİ and T. GÜNDÜZ, ‘‘Combined application proposal of value stream mapping (vsm) and methods time measurement universal analysis system (mtm-uas) methods in textile industry,’’ Endüstri Mühendisliği, vol. 31, no. 2, pp. 234–250, 2020. [Online]. Available: https://dergipark.org.tr/en/pub/endustrimuhendisligi/issue/56362/728061
  18. B. Suhardi, M. Hermas Putri K.S, and W. A. Jauhari, ‘‘Implementation of value stream mapping to reduce waste in a textile products industry,’’ Cogent Engineering, vol. 7, no. 1, p. 1842148, Jan. 2020. [Online]. Available: https://www.tandfonline.com/doi/full/10.1080/23311916.2020.1842148
  19. M. A. Sayid Mia, M. Nur-E-Alam, and M. K. Uddin, ‘‘Court Shoe Production Line: Improvement of Process Cycle Efficiency by Using Lean Tools,’’ LFJ, vol. 17, no. 3, pp. 135–146, Sep. 2017. [Online]. Available: http://revistapielarieincaltaminte.ro/revistapielarieincaltaminteresurse/en/fisiere/full/vol17- nr3/article3vol17issue3.pdf
  20. J. Singh and H. Singh, ‘‘Application of lean manufacturing in automotive manufacturing unit,’’ IJLSS, vol. 11, no. 1, pp. 171–210, Jan. 2020. [Online]. Available: https://www.emerald.com/insight/content/doi/10.1108/IJLSS-06-2018-0060/full/html
  21. S. Patel, D. Mistry, and M. Shah, ‘‘A process improvement methodology for effective implementation of value stream mapping integrated with foreman delay survey,’’ Innov. Infrastruct. Solut., vol. 6, no. 3, p. 137, Sep. 2021. [Online]. Available: https://link.springer.com/10.1007/s41062-021-00512-1
  22. G. D. Koltun, S. Feldmann, D. Schutz, and B. Vogel-Heuser, ‘‘Model-document coupling in aPS engineering: Challenges and requirements engineering use case,’’ in 2017 IEEE International Conference on Industrial Technology (ICIT). Toronto, ON: IEEE, Mar. 2017, pp. 1177–1182. [Online]. Available: http://ieeexplore.ieee.org/document/7915529/
  23. D. E. Ufua, A. S. Ibidunni, M. O. Akinbode, C. G. Adeniji, and B. E. Kehinde, ‘‘Value stream mapping, a tool for optimum implementation of systemic lean intervention: a case study of a livestock commercial farm in Nigeria,’’ IJSOM, vol. 39, no. 3, p. 399, 2021. [Online]. Available: http://www.inderscience.com/link.php?id=116123
  24. C. Valmohammadi and A. A. Dadashnejad, ‘‘Value stream mapping implementation: an operational view,’’ IJPQM, vol. 32, no. 3, p. 307, 2021. [Online]. Available: http://www.inderscience.com/link.php?id=113612
  25. J. Lin, X. Fang, Y. Zhang, and Y. Lian, ‘‘Application of Plan-Do-Check-Action cycle and fishbone diagram analysis in optimizing surgical procedures to improve satisfaction degree of doctor-nurse-patient,’’ Ann Eye Sci, vol. 5, pp. 2–2, Mar. 2020. [Online]. Available: http://aes.amegroups.com/article/view/5060/html
  26. V. Girish, ‘‘Identifying the Perspectives of Domestic Tourists Visiting Puducherry of India During theCOVID-19 Pandemic: A Fishbone Diagram Analysis,’’ Tourism (Zagreb, Online), vol. 70, no. 1, pp. 127–130, Dec. 2021. [Online]. Available: https://hrcak.srce.hr/267981
  27. T. Luo, C. Wu, and L. Duan, ‘‘Fishbone diagram and risk matrix analysis method and its application in safety assessment of natural gas spherical tank,’’ Journal of Cleaner Production, vol. 174, pp. 296–304, Feb. 2018. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S0959652617326410
  28. M. Groover and G. Jayaprakash, Automation, Production Systems, and Computer-integrated Manufacturing, ser. Always learning. Pearson Education Limited, 2015. [Online]. Available: https://books.google.co.id/books?id=t2fXoAEACAAJ
  29. B. Fahimnia, L. H. S. Luong, B. Motevallian, R. M. Marian, and M. M. Esmaeil, ‘‘Analyzing & Formulation of Product Lead Time,’’ 2008.
  30. R. Sundar, A. Balaji, and R. S. Kumar, ‘‘A Review on Lean Manufacturing Implementation Techniques,’’ Procedia Engineering, vol. 97, pp. 1875–1885, 2014. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S1877705814034092
  31. Guangdong University of Science & Technology, Dongguan, China and J. Qiu, ‘‘Construction and Empirical Analysis of Environmental Cost Early-warning Model for Manufacturing Enterprises Based on Fishbone Diagram,’’ FMR, vol. 3, no. 3, Jul. 2019. [Online]. Available: http://www.isaacpub.org/images/PaperPDF/FMR1000622019051410441567231.pdf
  32. R. Sweis, A. Moarefi, M. H. Amiri, S. Moarefi, and R. Saleh, ‘‘Causes of delay in Iranian oil and gas projects: a root cause analysis,’’ IJESM, vol. 13, no. 3, pp. 630–650, Sep. 2019. [Online]. Available: https://www.emerald.com/insight/content/doi/10.1108/IJESM-04-2018-0014/full/html
  33. G. Yadav, S. Luthra, D. Huisingh, S. K. Mangla, B. E. Narkhede, and Y. Liu, ‘‘Development of a lean manufacturing framework to enhance its adoption within manufacturing companies in developing economies,’’ Journal of Cleaner Production, vol. 245, p. 118726, Feb. 2020. [Online]. Available: https://linkinghub.elsevier.com/retrieve/pii/S0959652619335966
  34. I. Leksic, N. Stefanic, and I. Veza, ‘‘The impact of using different lean manufacturing tools on waste reduction,’’ Adv produc engineer manag, vol. 15, no. 1, pp. 81–92, Mar. 2020. [Online]. Available: http://apem-journal.org/Archives/2020/Abstract-APEM15-1081 − 092.html
  35. E. Lamani, A. Ahmad, and M. B. Ahmad, ‘‘Lean manufacturing implementation to reduce waste on weighing scale assembly line,’’ International Journal of Emerging Trends in Engineering Research, vol. 8, no. 1, pp. 1–2, 2020.
  36. J. Du, Y. Xue, V. Sugumaran, M. Hu, and P. Dong, ‘‘Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components,’’ ECAM, vol. 30, no. 4, pp. 1601–1635, May 2023. [Online]. Available: https://www.emerald.com/insight/content/doi/10.1108/ECAM-04-2021-0311/full/html