The application of this model on various problems has indicated the fact that the cycle length and the number of stations to be opened depends on the level of pıofit contribution and the unit labor cost.
📌 3 Maddede Bu Makale
🎯
Amaç & Hipotez: In this paper, a 0 -1 programming model is developed to solve line - balancing problems.
📊
Temel Bulgular & Veri:The objective function is set in such away that it simultaınously takes into account the rate of production and the labor time.
💡
Sonuç & Katkı:The application of this model on various problems has indicated the fact that the cycle length and the number of stations to be opened depends on the level of pıofit contribution and the unit labor cost.
🔬Tür:Modelleme & Sayısal Simülasyon
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:üretim hattı dengelemesi · işletme
Özet
In this paper, a 0 -1 programming model is developed to solve line - balancing problems. The objective function is set in such away that it simultaınously takes into account the rate of production and the labor time. The application of this model on various problems has indicated the fact that the cycle length and the number of stations to be opened depends on the level of pıofit contribution and the unit labor cost.
Unutulmaz, O., Özgüven, C. (1985). ÜRETİM HATTI DENGELEMESİ PROBLEMLERİNİN ÇÖZÜMÜNE YENİ BİR YAKLAŞIM. Erciyes Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, Sayı: 7, 101–106. https://ajindex.com/articles/119510