Dergiler / Teknik Dergi / 2021 / Cilt: 32 Sayı: 6

Investigation of Organizational and Regional Perceptions on the Changes in Construction Projects

Osman İlter(EASTERN MEDITARRANEAN UNIVERSITY)0000-0002-3270-3523
Tahir Çelik(CYPRUS INTERNATIONAL UNIVERSITY)0000-0002-2943-0640
Sayfa
11257–11286
Yayın Tarihi
2021-11-01
🏛️Bu makalenin bibliyografik verileri ve tam metin bağlantısı DergiPark üzerinden sağlanmıştır.
DergiPark Kaydı ↗
✨

Yapay Zeka Hızlı Bakış & Çıkarımlar

AI Insight
⚡ TL;DR(1 Cümlede Hızlı Çıkarım)

In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.

📌 3 Maddede Bu Makale

🎯
Amaç & Hipotez:One of the most common concerns in construction projects is changes during execution.
📊
Temel Bulgular & Veri:Changes can increase the cost and duration of the construction project hereby, can lead to conflict between the parties involved in construction projects.
💡
Sonuç & Katkı:In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.
🔬Tür:Araştırma Makalesi
📍Kapsam:Genişletilmiş Akademik Örneklem
⚙️Değişkenler:Changes in Construction · Mitigation Measures · cost-time overrun

Özet

One of the most common concerns in construction projects is changes during execution. Changes can increase the cost and duration of the construction project hereby, can lead to conflict between the parties involved in construction projects. The change causes may differ depending on the organizations and regions characteristics. The aim of this study is to investigate the impact of organizational and regional characteristics on key change factors. In this regard, top risky change factors were identified with respect to contractors, consultants, and owners located in North Cyprus, Turkey, and the U.S.A. The research findings showed that the most risky change factors differed in accordance with the characteristics of organizations and regions. It was concluded that “Errors/Inadequacies in Contract Drawing” was the riskiest factor according to contractors while “Low price due to high competition” was noted to be the riskiest change causes with respect to consultants and owners. In point of regions, “Inconsistency between different design disciplines” was identified as the top risky change factor according to the respondents in the U.S.A. located organizations. However “Low contract price” was designated as the top risky change factor according to the respondents in North Cyprus and Turkey. In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.

Abstract

One of the most common concerns in construction projects is changes during execution. Changes can increase the cost and duration of the construction project hereby, can lead to conflict between the parties involved in construction projects. The change causes may differ depending on the organizations and regions characteristics. The aim of this study is to investigate the impact of organizational and regional characteristics on key change factors. In this regard, top risky change factors were identified with respect to contractors, consultants, and owners located in North Cyprus, Turkey, and the U.S.A. The research findings showed that the most risky change factors differed in accordance with the characteristics of organizations and regions. It was concluded that “Errors/Inadequacies in Contract Drawing” was the riskiest factor according to contractors while “Low price due to high competition” was noted to be the riskiest change causes with respect to consultants and owners. In point of regions, “Inconsistency between different design disciplines” was identified as the top risky change factor according to the respondents in the U.S.A. located organizations. However “Low contract price” was designated as the top risky change factor according to the respondents in North Cyprus and Turkey. In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.

🔖

Bu Makaleye Atıf Yap

İlter, O., Çelik, T. (2021). Investigation of Organizational and Regional Perceptions on the Changes in Construction Projects. Teknik Dergi, Cilt: 32 Sayı: 6, 11257–11286. https://doi.org/10.18400/tekderg.595995

📄 Tam Metin PDF Okuyucu

📄

PDF görüntüleyici hazırlanıyor...

Kaynakça (77)

  1. Ming, S., Sexton, M., Aouad, G., Fleming, A., Senaratne, S., Anumba, C., Industrial Report: Managing Changes in Construction Projects Retrieved, Bristol UWE: School of the Built and Natural Environment, Bristol UWE, 2004.
  2. Ibbs, W., Wong, C., Kwak, H., Project Change Management Systems, Journal of Management in Engineering, 17, (3), 159–165, 2001.
  3. Anees, M.M., Mohamed, H.E., Abdul Razek, M.E., Evaluation of change management efficiency of construction contractors, Housing and Building National Research Center, 9,(1), 77-85,2013
  4. Moselhi, O., Assem, I., El-Rayes, K., Change Orders Impact on Labor Productivity, Journal of Construction Engineering and Management, 131, (3), 354–359,2005.
  5. Alnuami, A.S., Taha, R.A., Al Mohsin, M., Al-Harthi, A.S., Causes, Effecrs, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman, Journal of Construction Engineering and Management, 136, (5), 615–622, 2010.
  6. Serag, E., Oloufa, A., Malone, L., Radwan, E., Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction, Journal of Construction Engineering and Management, 136, (9), 1015–1027, 2010.
  7. Arditi, D. Akan, T.A., Gurdamak, S., Reasons for Delay in Public Projects in Turkey, Cosntruction Management and Economics, 3, (2), 171-181, 1985
  8. Kazaz, A., Ulubeyli, S., Tuncbilekli, N.A., Causes of Delay in Construction Projects in Turkey, Journal of Civil Engineering and Management, 18, (3), 426–435,2012.
  9. İlter, O., Çelik, T., The Effect of Project Variables on Cost and Time of Construction Projects, 5th international Project and Construction Management Conference (IPCMC2018), North Cyprus, 2018
  10. O’Brien, J.J., 1998, Construction Change Orders, New York, McGraw Hill
  11. Arain, F.M., Pheng, L.S., How Design Consultants Perceive Potential Causes of Variation Orders for Institutional Buildings in Singapore, Architectural Engineering and Design Management, 1, (3), 181-196, 2005a.
  12. Assaf, S.A., Al-Hejji, S., Causes of Delay in Large Construction Projects, International Journal of Project Management, 24, (4), 349–357, 2006.
  13. Kaming, P.F., Olomolaiye, P.O., Holt, G.D., Harris, F.C., Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia, Construction Management and Economics, 15, (1), 83–94, 1997.
  14. Zaneldin, E.K., Construction Claims in United Arab Emirates: Types, Causes and Frequency, International Journal of Project Management, 24, (5), 453–459, 2006.
  15. Ijaola, I.A., Iyagba, R.O., A comparative Study of Causes of Change Orders in Public Construction Projects in Nigeria and Oman, Journal of Emerging Trends in Economics and Management Sciences, 3, (5), 495–501, 2012.
  16. Oladapo, A.A., A Quantitative Assessment of the Cost and Time Impact of Variation Orders on Construction Projects, Journal of Engineering Design and Technology, 5, (1), 35–48, 2007.
  17. Hassanein, A.A.G., Nemr, W.E., Claims Management in the Egyptian Industrial Construction Sector: A Contractor’s Perspective, Engineering, Construction and Architectural Management, 15, (5), 456–469, 2007.
  18. Enshassi, A., Arain, F., Al-Raee, S., Causes of variation orders in construction projects in the Gaza Strip, Journal of Civil Engineering and Management, 16, (4), 540–551, 2010.
  19. Stare, A., Reducing Negative Impact of Project Changes with risk and change management, Zagreb International Review of Economics & Business, 14, (2), 71- 85, 2011
  20. Arain, F.M., Pheng, L.S., The Potential Effects of Variation Orders on Institutional Buildings Projects”, Facilities, 23, (11), 496–510, 2005b.
  21. Wu, C., Hsieh, T., Cheng, W., Statistical Analysis of Causes for Design Change in Highway Construction on Taiwan, International Journal of Project Management, 23, (7), 554–563, 2005.
  22. Akinsola, A.O., Potts, K.F., Ndekugri, I., Harris, F.C., Identification and Evaluation of Factors Influencing Variations on Building Project Cost, International Journal of Project Management, 15, (4), 263–267, 1997.
  23. Lu, H., Issa,R.R.A., Extended production integration for construction: a loosely coupled project model for building construction. ASCE, Journal of Computing in Civil Engineering, 19, (1), 58-68, 2005
  24. Sönmez, M., Dikmen, S.Ü., Akbıyıklı, R., Time - Cost Relationships for Superstructure Projects in Turkey, Teknik Dergi, 31, (2), 03-01, 2020
  25. Ahbab, C., Daneshvar, S., Çelik, T., Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis, Teknik Dergi, 30, (2), 8937 – 8959, 2019
  26. Hanna, A.S., Camlic, R., Peterson, P.A., Nordheim, E.V., Quantitative Definition of Project Impacted by Change Orders, Journal of Construction Engineering and Management, 128, (1), 57-64, 2002.
  27. Hanna, A.W., Gunduz, M., Impact of Change Orders on Small Labor-Intensive Projects, Journal of Construction Engineering and Management, 130, (5), 726-733, 2004.
  28. Wambeke, B.W., Hsiang, S., Liu, M., Causes of Variation in Construction Project Task Starting Times and Duration, Journal of Construction Engineering and Management, 137, (9), 663–677, 2011.
  29. Lee, S., Tae, S., Jee, N., Shin, S., LDA-Based Model for Measuring Impact of Change Orders in Apartment Projects and Its Application for Pre Risk Assessment and Post Evaluation, Journal of Construction Engineering and Management, 141, (7), 0401501, 2015.
  30. Diekman, J., Nelson, M., Construction Claims: Frequency and Severity, Journal of Construction Engineering and Management, 111, (1), 74–81,1985
  31. Bröchner, J., Badenfelt, U., Changes and Change Management in Construction and IT Projects, Automation in Construction, 20, (7), 767–775, 2011
  32. Bakr, G.A., Studying the Status of Variations in Construction Contract in Jordan, Computing in Civil and Building Engineering, 187–194, 2014.
  33. Kocaman, E., Kuru, M., Çalış, G., Investigating the Effect of Tendering Procedure and Contract Type on the Construction Contract Price, Teknik Dergi, 31, (1), 9789 – 9812, 2020
  34. Oyewobi, L.O., Jimon, R., Olanrewaju, B., Shittu, A.A., Analysis of causes and impact of variation order on educational building projects, Journal of Facilities Management, 14, (2), 139-164, 2016
  35. Taylor, T.R.B., Uddin, M., Goodrum, P.M., McCoy, A., Shan Y., Change Orders and Lessons Learned: Knowledge from Statistical Analyses of Engineering Change Orders on Kentucky Highway Projects, Journal of Construction Engineering and Management, 138, (12), 1360–1369, 2012
  36. Dumont, P., Gibson, G.E., Fish, J., Scope Management using project definition rating index, Journal of Management in Engineering, 13, (5), 54-60,1997
  37. Chan, D.W.M. and Kumaraswamy, M.M., a comparative study of causes of time overruns in Hong Kong construction projects, International Journal of Project Management, 15, (1), 55-63,1997
  38. Hsieh, T., Lu, S., Wu, C.,Statistical Analysis of Causes for change orders in Metropolitan Public Works, International Journal of Project Management, 22, (8),679- 686,2004
  39. Memon, A.H., Rahman, I.A., Hasan, M.F.A.,Significant causes and effects of variation orders in construction projects, Research Journal of Applied Sciences,7, (21),4494- 4502, 2014
  40. Motawa, I.A.,A systematic approach to modelling change processes in construction projects, The Australian Journal of Construction Economics and Building, 5,(1), 2005
  41. Love, P.E.,Edwards, D.J., Zahir,I.,Forensic project management: An exploratory examination of the causal behavior of design-induced rework, IEEE Transportation Engineering Management, 55,(2), 234-247,2008
  42. Chen,J.L.,KNN-based knowledge sharing model for severe change order disputes in construction. Automation in Construction, 17,(6),773-779,2008
  43. Sun, M., Meng, X.,Taxonomy for change causes and effects in construction projects, International journal of Project Management, 27, (6),560-572,2009
  44. Odeh, A.M., Battaineh, H.T.,Causes of construction delay: traditional contracts, International Journal of Project Management, 20, (1), 67-73,2002
  45. Lo, T.Y., Fung, I.W.H., Tung, K.C.F, Construction Delays in Hong Kong Civil Engineering Projects, Journal of Construction Engineering and Management, 132, (6), 636-649,2006
  46. Rosenfeld,Y., Root-Cause Analysis of Construction-Cost Overruns, Journal of Construction Engineering and Management,140, (1), 4013039,2013
  47. Sha’ar, K.Z., Assaf, S.A., Bambang, T., Babsail, M. and Fattah, A.M.A.El., Design- construction interface problems in large building construction projects, International Journal of Construction Management, 17,(3), 238-250, 2017
  48. Mansfield, N., Ugwu, O., Doran, T., Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management 12, (4), 254– 260,1994
  49. Doloi, H., Sawhney, A., Iyer, K.C., Rentala, S.,Analysing factors affecting delays in Indian Contruction Projects, International Journal of project management,30, (4), 479- 489,2012
  50. M. Mohamad, M. Nekooie, and A. Al-Harthy, “Design changes in residential reinforced concrete buildings: The causes, sources, impacts and preventive measures,” J. Constr. Dev. Ctries,17, (2), 23–44, 2012
  51. Assaf, S.A., Al-Khalil, M. and Al-Hazmi, M., Causes of delay in large building construction projects. ASCE Journal of Management in Engineering, 11(2), 45– 50,1995
  52. Yap, J.B.Y., Abdul-Rahman, H., Wang, H.,Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication, International Journal of Project Management, 35, (7), 1253-1271, 2017
  53. Cox, I. D., Morris, J., Rogerson, J. H., and Jared, G. E., A quantitative study of post contract award design changes in construction, Construction Management and Economics., 17,(4), 427-439,1999
  54. Cox, S. and Hamilton, A.,Architect’s Job Book, 6th edn, Royal Institute of British Architects, London, RIBA Publications,1995
  55. Enshassi A., Lisk R., Sawalhi I. and Radwan I.,Contributors to construction delays in Palestine, The Journal of American institute of constructors, 27, (2), 45-53, 2003
  56. Arain, F.M., Assaf, S., Low, S.P.,Causes of Discrepancies between Design and Construction. Architectural Science Review 47, (3), 237–249, 2004
  57. Ling, F.Y.Y., Chan, S.L., Chong, E., Ee, L.P., Predicting Performance of design-Build and Design-Bid-Build Projects, Journal of Construction Engineering and Management, 30, (1), 75-83,
  58. Faridi, A.S. and El-Sayeng,S.M.,Significant factors causing delay in the UAE construction industry, Construction Management and Economics, 24,(11),1167- 1176,2006
  59. Doloi, H.,Analysis of pre-qualification criteria in contractor selection and their impacts on project success, Construction Management and Economics, 27, (12),1245- 1263,2009
  60. Holt, G.D., Olomolaiye, P.O., Harris, F.C.,A review of contractor selection practice in the U.K. construction industry. Building and Environment 30, (4),553–561,1995
  61. Andersen, B., Olsson, N.O.E., Onsøyen, L.E., Spjelkavik, I.,Post project changes,: occurrence, causes, and countermeasures, International Journal of Project Business, 4, (2), 308-328,2011
  62. Love, P.E., Holt, G.D., Shen, L.Y., Li, H., Irani, Z.,Using systems dynamics to better understand change and rework in construction project management systems. International Journal of Project Management 20 (6), 425–436,2002
  63. P. E. D. Love, Z. Frani, and D. J. Edwards, “A rework reduction model for construction projects,” IEEE Trans. Eng. Manag., 51, (4), 426–440, 2004
  64. Sambasivan, M. and Soon, Y.W., Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25, (5),517–26, 2007
  65. Frimpong, Y., Oluwoye, J. and Crawford, L., Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study. International Journal of Project Management, 21, (5), 321–6, 2003
  66. Yap, J.B.Y., Abdul-Rahman, H., Wang, C., A Conceptual Framework for Managing Design Changes in Building Construction, MATEC Web of Conferences 66, 00021, 2016
  67. Hwang, B.-G., Zhao, X., Do, T.H. Van,Influence of Trade-Level Coordination Problems on Project Productivity,Project Management Journal,45, (5), 5-14,2014
  68. Alaghbari, M.W, Razali A. Khadir, Salim Azizah, Ernawati., The significant factors causing delay of building construction projects in Malaysia. Journal of Engineering, Construction and Architectural Management,14, (2), 192-206, 2007
  69. A. Aiyetan, J. Smallwood, and W. Shakantu, “A systems thinking approach to eliminate delays on building construction projects in South Africa,” Acta Structilia,18,(2),19–39, 2011
  70. İlter, O., Çelik, T., Evaluation of Change Causes in Execution Process of Construction Projects, Project and Construction Management Conference, (PYYK 2016), Eskişehir, Turkey, 2016
  71. Drew, D., Skitmore, M., The effect of contract type and size on competitiveness in bidding, Construction Management and Economics, 15, (5), 469-489,1997
  72. Tan, Y., Shen, L., Khaled, A., Song S., An Examination of the Factors Affecting Contractor’s Competition Strategy: a Hong Kong Study, International Journal of Project Organization Management, 1,(1), 4-23, 2008.
  73. Crowley, L.G., Hancher, D.E., Risk assessment of competitive procurement, Journal of Construction Management, 121, (2), 230-237, 1995
  74. Bryde, D., Broquetas, M.,Volm, J.M., Daneshvar, S., Çelik, T., The Project Benefits of Building Information Modelling (BIM), International Journal of Project Management, 31, (7), 971– 980, 2013
  75. Sönmez, M., Dikmen, S.Ü., Akbıyıklı, R., Time - Cost Relationships for Superstructure Projects in Turkey, Teknik Dergi, 31, (2), 03-01, 2020
  76. Ahbab, C., Daneshvar, S., Çelik, T., Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis, Teknik Dergi, 30, (2), 8937 – 8959, 2019
  77. Kocaman, E., Kuru, M., Çalış, G., Investigating the Effect of Tendering Procedure and Contract Type on the Construction Contract Price, Teknik Dergi, 31, (1), 9789 – 9812, 2020