Journals / International Journal of Pure and Applied Sciences / 2018 / Cilt: 4 - Sayı: 1
Work Sampling Using REFA: A Case Study in a Construction and Agricultural Vehicles Company
- Pages
- 77–83
- DOI
- —
Abstract
In recent years, the competition environment was not as challenging as it is today, so companies could increase profits by increasing their selling prices. However, the companies have to reduce costs in order to be able to make profit in these days due to fact that the globalization has brought competition environment. The one of the most important way to minimize cost in assembly lines is to eliminate or minimize non-productive times. Work sampling is one of the cheapest and the simple method in order to determine the non-productive times. In this study, work sampling is applied with the REFA (Reichsausschuss Für Arbeitszeitermittlung) standards in a company that assemble construction and agricultural vehicles. The samples are determined by statistical methods and certain recommendations are offered to eliminate non-productive times.
Özet
Geçmiş yıllarda rekabet ortamı bugünkü kadar zorlu olmadığından şirketler karlarını satış fiyatlarını artırarak sağlayabiliyorlardı. Günümüzde küreselleşen ve büyüyen ortam beraberinde rekabeti getirmiş, bunun neticesinde ise şirketler satış fiyatını artırma şansları olmadığından kar elde edebilmek amacıyla maliyetlerini düşürme yoluna başvurmak zorunda kalmışlardır. Montaj hatlarında maliyeti minimize etmenin en önemli yolu kayıp zamanları tespit ederek, yok etmek veya minimum seviyeye indirmektir. Kayıp zamanların tespitinde uygulanabilecek en ucuz, emeği en düşük ve en kısa sürede sonuca ulaşılabilecek yöntem ise iş örneklemesidir. Bu çalışmada iş ve tarım makinaları montajı yapan bir işletmede REFA (Reichsausschuss Für Arbeitszeitermittlung) standartları ile iş örneklemesi uygulaması yapılmıştır. Örneklemeler istatistiksel metotlar ile belirlenmiş ve kayıp zamanlar için çözüm önerileri getirilmiştir.