Journals / Türk-Alman Üniversitesi Hukuk Fakültesi Dergisi / 2020 / Cilt: 2 - Sayı: 1

THE OBLIGATION OF THE ADMINISTRATION TO CONCLUDE A CONTRACT AND CULPA IN CONTRAHENDO LIA- BILITY

İDARENİN SÖZLEŞME AKDETME ZORUNLULUĞU VE SÖZLEŞME GÖRÜŞMELERİNDEN DOĞAN SORUMLULUĞU

Pages
133–162
DOI
—

Abstract

Being one of the legal instruments that are used for fulfilling the public ser- vices, contract is getting more and more effective in public sector. Contrary to private bodies; public bodies do not have the freedom to choose the contracting party and it can only be chosen after a public procurement process. However in some cases, despite the completion of the phase, contracting authority does not conclude the contract due to some reasons. In this study, the scope of the ability of the tenderer to legally bind the contracting authority to conclude a contract will be examined in the light of current case law. The application of the principle of the pre-contractual (culpa in contrahendo) liability will also be analysed.

Özet

İdarenin kamu hizmetlerini yerine getirirken kullandığı araçlardan biri de “sözleşme” olup, söz konusu bu tasarruf biçimi günümüzde etkinliğini giderek artırmaktadır. İdare akdedeceği bir sözleşmede, sözleşmenin tarafını seçme ko- nusunda özel hukuktaki serbestiye sahip olmayıp, sözleşme tarafını ihale yo- luyla belirlemektedir. Ancak bazı durumlarda ihale aşaması tamamlanmasına rağmen, İdare sözleşmeyi çeşitli sebeplerle imzalamamakta ve sözleşme uygula- masına geçilememektedir. Bu çalışmada, ihaleyi kazanmak için çeşitli masraflar yapmış olan isteklinin, İdareyi sözleşme akdetmeye zorlayıp zorlayamayacağı, sözleşme akdedilmediği için İdarenin sözleşme öncesi sorumluluğunun ne yönde belirleneceği ve isteklinin hangi zararlarını talep edebileceği güncel içtihat çer- çevesinde ele alınacaktır.