Journals / Tekstil ve Konfeksiyon / 2013 / Cilt: 23 - Sayı: 3
Konfeksiyon üretiminde model değişim sürelerinin Genel ekipman etkinliğine etkisi
- Journal
- Tekstil ve Konfeksiyon
- Pages
- 297–302
- DOI
- —
Abstract
The overall equipment effectiveness is necessary for determining weak points in order to provide optimum equipment conditions. Meanwhile, it focuses on removing the factors such as unexpected malfunctions, speed losses and quality losses in the process. These losses are commonly seen in the transition between orders and in the process for adaptation to a new product in clothing enterprises. This process has a big importance for providing effectiveness in the current understanding of production in which the numbers of orders decrease but the numbers of models increase. This study deals with the effect of the order change time on the overall equipment efficiency.
Özet
Genel ekipman etkinliği; optimum ekipman şartlarına ulaşmak için zayıf noktaların ortaya konulması için gereklidir. Bunu gerçekleştirirken, beklenmeyen arızalar, hız kayıpları ve prosesteki kalite kayıpları gibi etmenlerin yok edilmesine odaklanır. Konfeksiyon işletmelerin de bu tür kayıplar daha çok siparişler arası geçişte ve yeni ürüne adaptasyon sürecinde görülmektedir. Bu süreç, sipariş adetlerinin azaldığı ancak model sayılarının arttığı günümüz üretim anlayışında verimliliği sağlamada büyük önem taşımaktadır. Bu çalışmada sipariş değişim sürelerinin genel ekipman verimliliğine olan etkisini ortaya konulması amaçlanmıştır.