Journals / İTÜ Dergisi Seri A: Mimarlık, Planlama, Tasarım / 2006 / Cilt: 5 - Sayı: 2

Concurrent engineering in construction project system

İnşaat proje sisteminde eşzamanlı mühendislik modeli

Pages
71–82
DOI
—

Abstract

Concurrent engineering is an alternative product development approach in manufacturing sector, in which the development of the design is based on a set of target values defined by optimizing the needs and limitations of the product’s lifecycle participants. In order to determine the needs and limitations of the lifecycle participants, these participants should involve to the design process, express their needs and limitations and these data should be optimized by the design team. The application of these concurrent engineering princi-ples to construction projects requires all lifecycle participants to join to the design stage of the project, which results in a differentiation of the contract structure. Hence, an alternative project delivery method emerges while the general framework of this method needs to be described. In order to satisfy this need, a model, called “Concurrent Engineering in Construction Project System” is developed. The aim of this model is to yield a system, in which the needs and limitations of a facility’s lifecycle participants are determined and optimized by the design team so that the development of the design is based on a set of target values, with which all lifecycle participants agree. In this study, Concurrent Engineering in Construction Project System model is represented, the main activities in the pre-design and design stages are described, the participants in these activities and their main obligations are defined.

Özet

İmalat sektöründe uygulanan eşzamanlı mühendislik yaklaşımının inşaat proje sistemine uygulanması, nesnenin yaşam çemberinde rol alan tüm aktörlerin tasarım sürecine katılarak isteklerini ifade etmelerini ve tasarımın bu isteklerin optimize edilmesiyle belirlenen hedef değerler doğrultusunda geliştirilmesini zorunlu kılmaktadır. Bunun sonucunda projedeki katılımcı profilinin ve sözleşme yapısının farklılaşması alternatif bir proje teslim yöntemi ortaya çıkarmaktadır. Bu çalışmada eşzamanlı mühendislik ilkelerinin uygulanmasına yönelik genel bir proje teslim yöntemi iskeleti oluşturmak amacıyla geliştirilen “İnşaat Proje Sisteminde Eşzamanlı Mühendislik” (IPS-EM) modeli tanıtılmakta, bu modeldeki tasarım öncesi ve tasarım aşamalarının temel aktiviteleri, bu aktivitelerin gerçekleştirilmesinde rol alan katılımcılar ve temel yükümlülükleri açıklanmaktadır.