A MATHEMATICAL MODEL FOR DYNAMIC PROJECT SCHEDULING PROBLEM AND REACTIVE SCHEDULING IMPLEMENTATION
- Pages
- 83–97
- DOI
- —
Abstract
In today's real-life implementations, projects are executed under uncertainty in adynamic environment. In addition to resource constraints, the baseline schedule is affecteddue to the unpredictability of the dynamic environment. Uncertainty-based dynamic eventsexperienced during project execution may change the baseline schedule partially orsubstantially and require projects' rescheduling. In this study, a mixed-integer linearprogramming model is proposed for the dynamic resource-constrained project schedulingproblem. Three dynamic situation scenarios are solved with the proposed model, includingmachine breakdown, worker sickness, and electricity power cut. Finally, generated reactiveschedules are completed later than the baseline schedule.
Özet
Günümüz gerçek hayat uygulamalarında projeler belirsizlik altında dinamik bir ortamda yürütülmektedir. Kaynak kısıtlarının yanı sıra dinamik ortamdaki öngörülemezlik nedeniyle de temel çizelge etkilenmektedir. Proje yürütülmesi sırasında yaşanan belirsizlik temelli dinamik olaylar temel çizelgenin kısmen veya büyük ölçüde değişmesini ve projelerin yeniden çizelgelenmesini gerektirebilmektedir. Bu çalışmada, dinamik kaynak kısıtlı proje çizelgeleme problemi için bir karma tamsayılı doğrusal programlama modeli önerilmiştir. Önerilen modelle, makine arızalanması, işçi hastalanması ve elektrik kesintisi içeren üç dinamik durum senaryosu çözülmüştür. Sonuç olarak, oluşturulan reaktif çizelgeler temel çizelgeye göre daha geç tamamlanmıştır.