Journals / Çukurova Üniversitesi Mühendislik-Mimarlik Fakültesi Dergisi / 2002 / Cilt: 17 - Sayı: 1
Environmental impact assessment (EIA) application in water resources planning and example of Tepeköy Dam
- Pages
- 191–200
- DOI
- —
Abstract
In this study, environmental impact of dam projects, which take part among the activities having obligation of preparing EIA statement according to legislation, were examined. Furthermore, preliminary EIA statement of Tepeköy Dam, which is planning for drinking water supply in Mersin, was prepared. For this purpose, positive and negative whole impacts on environment of Tepeköy Dam during construction and operation stages were investigated. From the conclusions of these investigations, necessary measures for diminishing negative impacts of particular project were determined.
Özet
Bu çalışmada, yürürlükte bulunan ÇED Yönetmeliği 'ne göre ÇED raporu hazırlama zorunluluğu olan faaliyetler arasında yer alan baraj projelerinin çevresel etkileri irdelenmiştir. Ayrıca, Mersin ili sınırları içinde, içme suyu temini amaçlı yapılması düşünülen Tepeköy Barajı 'nın Ön Çed Raporu hazırlanmıştır. Bu amaçla, Tepeköy Barajı 'nın inşaat ve işletme aşamasında çevre üzerine ve mevcut kullanımlara, olumlu ve olumsuz bütün etkileri araştırılmıştır. Bu araştırmalar sonucunda olumsuz etkilerin azaltılması yönünde ne gibi önlemler alınması gerektiği belirlenmiştir.