Journals / Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi / 2002 / Cilt: 17 - Sayı: 4
THE IMPLEMENTATION OF INTEGRATED PRODUCT AND PROCESS DEVELOPMENT TECHNIQUE IN ENGINEERING-DEVELOPMENT BASED PRODUCTION PROJECTS
- Pages
- 1–14
- DOI
- —
Abstract
In this paper, the implementation of integrated product process development technique (IPPD) in engineering-development based production projects for defence industry is presented with an example case. The description of IPPD and the differences between the classical method and IPPD method are given. The integration stages followed in engineering-development based production projects for the ESAT projects contents after the identification of application locations are explained and application of this technique are evaluated.
Özet
Bu makalede, “Tümleşik Ürün ve Süreç Geliştirme” (TÜSÜG) tekniğinin savunma sektörü için mühendislik-geliştirme tabanlı üretim projelerinde uygulanmasına ait bir örnek çalışma sunulmuştur. TÜSÜG tekniğinin genel kavramsal tanımıyapılarak, klasik yöntemle arasındaki farklar açıklanmıştır. Uygulama yerinin tanıtımı sonrası, tekniğin mühendislik-geliştirme tabanlı üretim projelerine entegrasyonunda izlenilen aşamaları ESAT projesi kapsamında açıklanmış ve tekniğin sonuçları değerlendirilmiştir.