Journals / Journal of Eta Maritime Science / 2018 / Cilt: 6 - Sayı: 2
Modeling of Manufacturing Time and Processes of Karadeniz Type Fishing Boat with Simulating Technique
- Pages
- 93–102
- DOI
- —
Abstract
In this study, the production process of a Black Sea type fishing boat was examined in detail, and a model was created in the SIMIO simulation base. With this model, the production period of Black Sea type fishing boat was determined. Subsequently, by changing working hours in the manufacture of boats, the production duration of the boat was determined and the effects of working hours on the boat production period were investigated. Consequently, it was observed that not every increase in working time affected the production of boats, and the effects of regular increases in working hours on the production period of Black Sea type of boats were quantified.
Özet
Bu çalışmada, Karadeniz tipi bir balıkçı teknesinin üretim süreci detaylı olarak incelenmiş ve SİMİO simülasyon tabanında bir modeli oluşturulmuştur. Oluşturulan bu model ile Karadeniz tipi balıkçı teknesinin üretim süresi belirlenmiştir. Sonra, tekne imalatında çalışma saatleri değiştirilmek suretiyle teknenin imalat süresi belirlenmiş ve bu şekilde çalışma saatlerinin tekne üretim süresine olan etkileri incelenmiştir. Sonuç olarak, çalışma süresindeki her artışın tekne üretim süresini etkilemediği gözlemlenmiş ve çalışma saatlerindeki düzenli artışların Karadeniz tipi teknenin üretim süresi üzerine etkileri sayısal olarak ortaya konulmuştur.